Powered by Made-in-China.com
OEM Stackable 28u Cabling Cabinet for Modular Data Center Construction
US$188.00-228.001 Piece
OEM Stackable 28u Cabling Cabinet for Modular Data Center Construction
US$188.00-228.00
1 Piece
Sample price:US$128.00/piece.Request sample
Product profile
Customization
AvailableSurface Treatment
Powder CoatedStandard
OEM, Custom According to Customer DrawingModel NO.
NC6628UTolerance
OEM, Custom According to Customer DrawingMachining Method
Laser Cutting, Bending, WeldingMaterial
Cold-Rolled Steel / Galvanized Steel OptionalStructure
Floor-Standing CabinetIngress Protection
IP20Installation
Floor StandingShell Material
Cold-Rolled Steel; Galvanized Steel OptionalStatic Load
600kg / 800kg / 1000kg (Depends on Model)Door Type
Perforated Front Door; Solid / Glass Rear Door OptColor
Ral7035 / Ral9004, CustomizableU Height
20u / 24u / 28u / 33u / 37u / 42u / 46uCable Management
Cable Bar, Cable Ring, Cable Trough OptionalAccessories
Mounting Rails, Leveling Feet, Casters, Lock SetTransport Package
Wooden CaseSpecification
CustomizedTrademark
Da HongOrigin
ChinaKey features
Flexible Shell Materials: Cold-rolled steel as standard; galvanized steel optional.
Customizable Color Options: RAL standard colors (7035, 9004) available. Custom color acceptable.
Premium Surface Treatment: Powder coating as standard, anti-rust and scratch-resistant.
Reliable Load Capacity: Static load 600kg / 800kg / 1000kg for different rack models.
OEM & ODM Services: Custom size, U height, door style and accessories supported.
Global Certifications: CE, RoHS and ISO9001 certified for stable quality.
Secure Packaging: Plywood case or carton package for long-distance shipment.
Company profile

High Repeat Buyers ChoiceFast DeliveryLow MOQR&D Capabilities
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Flexible customization CertifiedExport Year: 1 Year CertifiedNearest Port: Guangzhou PortAverage Response Time: ≤0.02h CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressGuangzhou, Guangdong, China
Plant Area140 square meters
Number of Employees6
Registered Capital500,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1
Supply Chain Partners40
Our Production Capability & Technical Expertise
Main ProductsElectric Control Box, Electrical Control Cabinet, Instruments and Meters, Communication Module
R&D Engineers1 people
Our Industry Experience & Global Business Record
Year of Establishment2024-06-27
Main MarketsDomestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:How long does it take for samples and mass production?
A:
Samples take about 7 days, and batch products take 15-30 days depending on the quantity. If you are in a hurry, we can adjust the production schedule according to the situation.
Q:What is the payment term?
A:
30% T/T in advance, 70% before shipment.
Q:Do you accept product customization?
A:
Yes, of course. Please provide specific drawings or parameters, we will quote you after evaluation.
Q:How do I order customized enclosures?
A:
The best way is you give us engineering drawings and equipment list, we will arrange engineers to serve you, if there is no drawings, we will also provide solutions for you.
Q:What are your main products?
A:
Wall-mounted distribution boxes, floor-standing Rittal-style cabinets, industrial PC cabinets, corrosion-resistant stainless steel enclosures and waterproof outdoor communication cabinets, plus all types of non-standard sheet metal cabinets. Customization of size, thickness, color, IP rating and accessories is available. We also provide customized sheet metal solutions (OEM/ODM) and support complete electrical system design and assembly to deliver one-stop solutions for our customers.
Send Inquiry
*To:
Dahong Electric Control Equipment Technology (Guangzhou) Co., Ltd.
Dahong Electric Control Equipment Technology (Guangzhou) Co., Ltd.*Content:
0/4000
Supplier replies will be sent to your registered email
You may also like
Modular 18u Server Rack Cabinet for Quick Deployment in Micro Data Centers
US$6.90-33.68
10 Pieces(MOQ)
OEM Custom 19-Inch Network Cabinet Metal Server Rack for Data Center Solutions
US$148.80-288.80
50 PCS(MOQ)
OEM Integrated Data Center Cabinet with Customized Modular Design
US$13,500.00-15,000.00
1 units(MOQ)
Pre-Assembled Modular Data Center Cabinet with UPS Cooling System for Fast Installation
US$13,500.00-15,000.00
1 units(MOQ)
Black 42u Rack Server Cabinet OEM Steel Network Floor Standing Network Rack Cabinet for Data Center
US$29.90-99.90
10 Pieces(MOQ)
Efficient 42u Ventilated Cabling Cabinet for Data Center Use
US$88.00-168.00
1 Piece(MOQ)
Single Rack Modular Integrated Data Center Cabinet with in-Row Cooling for Telecom Edge Station
US$13,500.00-15,000.00
1 units(MOQ)
OEM/ODM Modular Micro Data Center Cabinet Intelligent Server Rack Pre-Assembled Plug & Play
US$150.00-300.00
20 Pieces(MOQ)
Modular Integrated Data Center Cabinet 42u Powder Coated Steel Frame for Colocation Service
US$13,500.00-15,000.00
1 units(MOQ)
Black 42U Rack Server Cabinet OEM Steel Network Floor Standing Network Rack Cabinet for Data Center
US$18.00-21.00
10 Pieces(MOQ)
Premium 46u Modular Cabling Cabinet for Network and Server Rooms
US$288.00-366.00
1 Piece(MOQ)
Integrated Intelligent Cabinet for Modular Data Center Solutions
US$1,000.00-2,000.00
1 Piece(MOQ)
Customizable Modular Data Center Cabinets for Efficient Infrastructure Solutions
US$10,000.00-20,000.00
1 Piece(MOQ)
Stackable Cabinet for Data Centers with Space-Saving
US$20.00-70.00
10 Pieces(MOQ)
Sturdy OEM/ODM 12u Data Center Cabinet for Reliable Server Housing
US$22.00-30.00
1 Piece(MOQ)



















