SourcingAI
Try for free
Powered by Made-in-China.com
Scaffolding Accessories Inner Joint Lock Joint Pin for Frame Scaffolding System
US$0.41-0.55
2,000 Pieces
Sample price:US$0.45/piece.Request sample

Product profile

Customization

Available

Connection Type

Pin Connection

Finish

Galvanized

Model NO.

ALL

Material

Steel

Type

Scaffold Couplers

Specification

all

Origin

Hebei, China

Key features

Industrial-Strength Durability: Made from high-quality zinc-plated steel with a colorful chromate finish to resist rust and corrosion.
Secure Locking Design: Precision-machined slots and integrated collar create a tight, anti-slip fit preventing accidental disconnection.
Dual-Ended Versatility: Available in slotted and smooth designs to accommodate a wide range of scaffolding tube sizes and frame types.
Quick & Easy Installation: Lightweight and robust design allows for effortless assembly or disassembly in minutes without special tools.
Safety Compliance: Manufactured to meet international scaffolding safety standards for reliable performance on job sites.
Customization Options: Offers customization from samples, designs, and flexible minor customization services.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 11 years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤11.60h

AI-Powered supplier vetting

SummaryThe supplier is not identified as a professional technical supplier and does not provide 3D software design, ODM, or overseas agent services. It offers broad customization, including sample-, design-, full-, minor-, and flexible customization, and provides OEM services for well-known brands. Management certifications include ISO9001:2015, ISO45001:2018, and ISO14001. However, after-sales and quality-system weaknesses are indicated by the absence of written complaint-handling and corrective-action procedures, lack of raw-material traceability, and packing-staff-only finished-product checks. The supplier reports in-stock capability, lead times within 15 working days in both peak and off-season, and 11 years of export experience. Innovation evidence is limited: one R&D engineer, no new products in the past year, no ODM, and no SDK. Customer evidence includes an 80%–100% repeat-buyer preference, but no Fortune 500 cooperation.
Supplier typeThe supplier explicitly states that it is not a professional technical supplier and does not provide 3D software design services. It also does not offer ODM or SDK-supported R&D services, although it provides OEM services for well-known brands.
CertificationsThe supplier reports holding ISO9001:2015, ISO45001:2018, and ISO14001 management-system certifications. These stated certifications provide explicit evidence of certification coverage.
After-Sales capabilityNo written procedures or records exist for corrective and preventive actions or effective customer-complaint handling. Quality assurance is reported, but the absence of documented service processes is an explicit weakness.
R&D capabilityInnovation capability appears limited: the supplier had no new products in the past year, has one R&D engineer, does not offer ODM, and has no available SDK. These explicit data points indicate a deficiency in current product-development capability.
Customization capabilityThe supplier explicitly offers customization from samples, full customization, customization from designs, minor customization, and flexible customization. This is direct evidence of broad customization capability despite the absence of 3D software design services.
Client casesThe supplier provides OEM services for well-known brands and reports an 80%–100% repeat-buyer preference. However, it reports no cooperation with Fortune 500 companies, so the customer-case evidence is positive but limited in scope.

Product Q&A

Q:What is the main purpose of this scaffolding joint pin?
A:
This scaffolding joint pin is designed to securely connect scaffolding frames and tubes, creating a stable and rigid structure that can support heavy loads on construction sites. It prevents frames from shifting or disconnecting accidentally, ensuring a safer working environment.
Q:What material is this pin made from, and why is it a good choice?
A:
It is crafted from high-quality zinc-plated steel with a chromate finish. This material offers excellent resistance to rust, corrosion, and wear, making it ideal for prolonged use in harsh outdoor and construction environments. The plating also enhances its durability and extends its service life.
Q:Is this joint pin compatible with all types of scaffolding?
A:
It is designed to fit most standard scaffolding frames and tube sizes commonly used in residential, commercial, and industrial construction. We recommend checking your scaffolding specifications or contacting our customer service for confirmation before purchase.
Q:How do I install this scaffolding joint pin?
A:
Installation is quick and straightforward. Simply align the pin with the connection points on your scaffolding frames, then slide it into place until the integrated collar locks securely. No additional tools are required for assembly, allowing for fast setup and teardown of scaffolding structures.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 unit.

Send Inquiry

*To:Shijiazhuang Fullstar METAL PRODUCT Co., Ltd.Shijiazhuang Fullstar METAL PRODUCT Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like