Powered by Made-in-China.com
Walk Behind Asphalt Milling Machine
US$1,288.00-1,590.00
1 Set
Sample price:US$1590.00/set.Request sample
Product profile
Customization
AvailableWarranty
12 MonthType
Scarifier MachineModel NO.
JHE250Object
Cement Concrete PavementMoving Type
Walk BehindMixing Method
Continuous DrumAutomatic Grade
Non-AutomaticProduct Capacity
100sets/MonthCertification
CECondition
NewBlade Shaft
6Working Width
1~8mm(3/10inches)Efficiency
215-531sq.FT/HApplication
Asphalt or Concrete SurfacePower
5.5 Kw Siemens Motor/Honda Gx390Planner Width
250mm(10inches)Number of Blades
90 Pieces(15*6)Drum Set
1 Drum+81PCS Blades+6PCS Blade ShaftTransport Package
Wooden CaseSpecification
1CBMTrademark
JIEHEOrigin
ChinaHS Code
8479109000Production Capacity
100/MonthKey features
Durable TCT Cutters: Tungsten Carbide Topped cutters last 5,000-6,000 sq meters for pavement and coating removal.
Reliable Honda Engine: Powered by Honda GX390 engine with six bearings for efficient and silent operation.
Easy Drum Replacement: Drum assembly can be changed in just 5 minutes, ensuring minimal downtime.
CE Certified Quality: Meets CE certification standards with strict quality control and 22 years manufacturing experience.
Customizable Options: Offers minor to full customization including designs, ensuring flexibility for specific needs.
Stable & Safe Design: Low center of gravity and anti-vibration mounts ensure quick, even milling and comfortable operation.
Versatile Applications: Ideal for municipal conservation, road construction, building construction, and epoxy floor treatment.
Direct Factory Price: Sold directly from the factory, providing competitive pricing and professional video support.
Company profile
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 6 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤2.33h CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressQingyun, Niutang Town, Wujin District, Changzhou, Jiangsu, China
Plant Area110 square meters
Number of Employees4
Registered Capital1,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Set
Supply Chain Partners50
Our Production Capability & Technical Expertise
Main ProductsScarifying Machine, Cutting Machine, Crack Sealing Machine, Plate Compactor, Tamping Rammer, Power Trowel, Groving Machine, Vacuum Cleaner, High Pressure Washer, Surface Finishing Screed, Mini Skid St
R&D Engineers1 people
Our Industry Experience & Global Business Record
Year of Establishment2017-11-06
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Australia
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Product CertificationCE
Cooperated with Fortune 500No
Product Q&A
Q:What is the warranty period for this machine?
A:
The warranty period is 12 months.
Q:What engine options are available?
A:
Options include Honda GX390/GX270, Siemens electrical motor, Kohler CH440/CH395, and 186F Diesel engine.
Q:Can the machine be customized?
A:
Yes, we offer minor customization, customization from designs, flexible customization, and full customization.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 set.
Q:What is the lead time for production?
A:
The lead time is within 15 workdays for both peak and off seasons.
Send Inquiry
*To:
Daso Machinery (Changzhou) Co., Ltd.
Daso Machinery (Changzhou) Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Tatu Walk-Behind Asphalt Milling Type Marking Removal Machine for Efficient Surface Cleaning
US$4,300.00-4,500.00
1 Piece(MOQ)
Factory Price Walk Behind Floor Asphalt Construction Equipment Removal Cement Concrete Scarifier Surface Road Milling Machine
US$1,980.00-2,200.00
1 Piece(MOQ)
Concrete Walk Behind Floor Scarifier Asphalt Milling Machine
US$730.00-960.00
1 Piece(MOQ)
Mini Road Milling Walk-Behind Asphalt Concrete Scarifier Machine
US$1,399.00-1,699.00
1 Piece(MOQ)
Hand Push Model Electric Walk-Behind Road Milling Machine Concrete Scarifier
US$800.00-950.00
1 Piece(MOQ)
New Automatic Walk Behind Asphalt Floor Cutter Saw Blade Road Concrete Cutting Machine
US$400.00-690.00
1 Piece(MOQ)
Hot Sale Small Walk-Behind Garden Mini Asphalt Paver Asphalt Paver Asphalt Paver Machine
US$1,000.00-2,000.00
1 Piece(MOQ)
Floor Removal Machine Walk Behind Floor Scarifier Asphalt Milling Machine
US$598.00-828.00
1 Set(MOQ)
Walk-Behind Diesel Engine Road Finishing Machine for Concrete
US$188.00-339.00
1 Set(MOQ)
250 Type Machine Concrete Walk Behind Floor Scarifier Asphalt Milling Machine
US$300.00-600.00
1 Piece(MOQ)
Concrete Walk Behind Floor Scarifier Asphalt Milling Machine
US$1,350.00
2 Pieces(MOQ)
Walk Behind Floor Saw 120kg Weight 450mm Blade Size Asphalt Cutting Machine
US$602.00-622.00
1 Set(MOQ)
Paver Mini Walk Behind Asphalt Paving Machine for Garden Small Construction Use
US$3,999.00-4,999.00
1 Piece(MOQ)
Longshun Walk-Behind Mini Asphalt Scarifier Road Milling Machine for Construction Factory Price with Core Engine Component
US$1,550.00-1,800.00
1 Piece(MOQ)
Heavy-Duty 100kg Walk-Behind Airless Cold Paint Road Marking Machine
US$750.00-851.00
1 Piece(MOQ)
Xm101K Walk Behind Tire Cold Milling Machine
US$50,000.00
1 Piece(MOQ)



















