Powered by Made-in-China.com
Datang Double H Finned Tubes Rectangular Fin Tubes
US$900.00-1,200.00
100 Tons
Sample price:US$1.00/piece.Request sample
Product profile
Customization
AvailableCertification
ISOCustomized
CustomizedModel NO.
1''-24''Surface Treatment
NaturalFuel
OilRange of Applications
Power station, Life, IndustrialType
L TypeFin Material
Aluminum,SteelTube Material
Carbon Steel.Stainless SteelTransport Package
as Clients RequirmentsSpecification
10-60mmTrademark
DATANGOrigin
ChinaHS Code
84199090Production Capacity
50000 Per YearKey features
Wide Material Selection: Available in Carbon Steel, Stainless Steel, Copper, Aluminum, and Alloy Steel.
Multiple Fin Types: Offers L-Type, G-Type, Spiral, Extruded, and Double H rectangular fin tubes.
Full Customization: Supports full customization, minor customization, and flexible design options.
Versatile Applications: Used in power generation, HVAC, chemical, textile, and metallurgy industries.
Strict Quality Control: 100% visual and function inspection with full raw material traceability.
Fast Lead Time: Average lead time within 15 workdays for both peak and off-season.
ISO Certified Manufacturer: ISO9001:2015 certified with 18 years of export experience since 2007.
Low MOQ: Minimum Order Quantity is just 1 unit, suitable for small trials.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 18 Years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤0.65h
AI-Powered supplier vetting
SummaryThe supplier provides 3D software design, OEM, ODM, and broad customization services, supported by 10 production lines and specialized fin-tube and machining equipment. It holds an ISO9001:2015 management-system certificate, has 18 years of export experience, and reports that 71%–90% of sales come from exports. However, its R&D scale is limited to one engineer, no new products were launched in the past year, and no SDK is available. Quality-control test equipment is reported as zero, and continuous quantity reconciliation is not performed for every batch. Overseas service infrastructure is limited: no overseas warehouse, showroom, agent, or branch is reported. Service procedures exist for corrective actions and customer complaints, but written records are absent.
Supplier typeThe supplier is a manufacturing-oriented exporter offering OEM and ODM services, with 10 production lines, self-operated import/export rights, 18 years of export experience, and 71%–90% export sales. Its listed equipment includes fin-tube machinery, cutting, turning, beveling, bending, cleaning, and painting facilities.
CertificationsThe supplier reports holding an ISO9001:2015 management-system certificate. This is explicit certification evidence, although no additional certifications are provided.
R&D capabilityThe supplier offers 3D software design, ODM, and product-improvement support, and maintains design input, output, review, verification, and validation documentation. However, it has only one R&D engineer, launched no new products in the past year, and has no available SDK, indicating limited demonstrated innovation output.
Customization capabilityThe supplier explicitly supports customization from samples and designs, full, minor, and flexible customization, as well as 3D software design, OEM, and ODM services. These statements provide direct evidence of broad customization capability.
Product Q&A
Q:What materials are available for the finned tubes?
A:
Tube materials include Carbon Steel, Stainless Steel (304/316), Copper, and Aluminum. Fin materials can be Aluminum, Steel, or Copper.
Q:Can I customize the finned tubes?
A:
Yes, we offer full customization, minor customization, and flexible options based on your samples or designs.
Q:What is the minimum order quantity?
A:
The Minimum Order Quantity (MOQ) is 1 unit.
Q:What are the typical applications for these tubes?
A:
They are widely used in power generation, air conditioning, refrigeration, chemical, textile, and metallurgy industries.
Q:What is the lead time for production?
A:
The average lead time is within 15 workdays, regardless of peak or off-season.
Send Inquiry
*To:
Cangzhou Datang Steel Pipe Co., Ltd.
Cangzhou Datang Steel Pipe Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
High Quality Good Design Pipe Double H Finned Tube for Boiler
US$2,000.00-2,600.00
1 Ton(MOQ)
China Supplier Stainless Steel Double H Fin Tube for Boiler
US$2,000.00-2,300.00
1 Ton(MOQ)
Datang Cooling Fin Pipe Heat Sink Tube Heat Exchange Finned Tube
US$1.00-10.00
1 Piece(MOQ)
Durable H Finned Tube Double H Boiler Fin Tube for Heating Transfer System
US$1,350.00-1,500.00
3 Tons(MOQ)
Datang Extruded Steel Finned Tube with Aluminum Fins for Heat Exchanger
US$10.00-20.00
10 Meters(MOQ)
ASME Stainless Steel Spiral Finned Tube H Fin Tube for Economizer/Condenser/Heat Exchanger
US$1,350.00-1,500.00
3 Tons(MOQ)
High Quality Boiler H Type Finned Tube Stainless Steel 304L Welded Tube
US$2,000.00-2,300.00
1 Ton(MOQ)
H Type Finned Tube Bank Fin Tube for Economizer Heat Exchanger
US$1,000.00-2,500.00
10 Tons(MOQ)
Customized Industrial Boiler Spiral Double H Fin Tubes High Safety Energy Saving
US$1,900.00-2,100.00
10 Tons(MOQ)
Datang Best Offer Wound Finned Tube, Heat Transfer Fin Tube
US$1.00-100.00
10 Pieces(MOQ)
Datang High Efficiency Heat Transfer Fin Pipe Finned Tubes
US$1.00-10.00
1 Meter(MOQ)
CS / ND / Stainless Steel Spiral Finned Tube H - Type Fin Tube for Boiler Economizer
US$2,000.00-3,000.00
20 Tons(MOQ)
H Fin Tube Square Longitudinal ERW Fintubes Fin Pipes Boiler Finned Pipestubes
US$900.00-1,500.00
10 Tons(MOQ)
Stainless Steel Double Finned Tube for Boiler for Power Station
US$2,000.00-2,600.00
1 Ton(MOQ)
The Finned Tube Boiler with H-Shaped Fins Is The One with The Best Performance
US$900.00-1,000.00
1 Ton(MOQ)
Seamless Carbon Steel H Finned Tubes for Heat Exchanger Application
US$1,600.00-3,000.00
1 Ton(MOQ)
ASTM A214 Water Wall High-Finned Tube Spiral Galvanized-Fin-Tube
US$1,550.00
1 Ton(MOQ)
Boiler Energy-Saving Transformation Parts H-Fin Tube with ASME
US$1,550.00
1 Ton(MOQ)
High Quality Boiler Heat Excchanger Pipe Parts Double H Finned Steel Tube
US$1,200.00-1,500.00
10 Tons(MOQ)



















