Powered by Made-in-China.com

Topkit Tower Crane Static Proof for Data Center Construction Sites with Static Elimination Equipment Safe Operation Tower Crane
US$17,899.00-109,999.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
Engineers Available to Service OverseasWarranty
1 YearCertification
GS, RoHS, CE, ISO9001Condition
NewMaximum Lifting Height
0-300mMaximum Lifting Weight
>1-25tonInstallation
AssembledMoving Type
FixedType
Top-Slewing CraneTransport Package
StandardSpecification
StandardTrademark
DEXAN WANHEOrigin
ChinaHS Code
8426200000Production Capacity
3000/YearCompany profile

Jinan Dexin Wanhe Machinery Equipment Co., Ltd.Shandong, China
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-01-03Nearest Port: qingdao, tianjinAverage Response Time: ≤5.13hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): EXW, FCA, CFR, CIF, DAT, DDP, DAP, CIP, FAS, CPT, FOB, Others
AI-Powered supplier vetting
SummaryJinan Dexin Wanhe Machinery Equipment Co., Ltd. is a Chinese trading company and manufacturer specializing in construction machinery, such as suspended platforms. The company, based in Shandong, exports a significant portion of its products globally, with a strong presence in various international markets. Established as an exporter in 2014, the company holds ISO 9001 certification, indicating a commitment to quality management systems. It operates ten production lines and employs a sizable quality control team. However, detailed information on financial credibility, after-sales service, and customization capability is limited.
Supplier typeThe supplier is identified as both a trading company and a manufacturer/factory, operating in China.
CertificationsThe supplier holds ISO 9001 certification, indicating adherence to international quality management standards.
R&D capabilityThe company has less than 5 R&D engineers, suggesting limited innovation capability.
Production capacityWith ten production lines and significant annual production output, the supplier demonstrates strong production capability.
Send Inquiry
*To:
Jinan Dexin Wanhe Machinery Equipment Co., Ltd.
Jinan Dexin Wanhe Machinery Equipment Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Topless Large Load Capacity for Supermarket Construction Sites with Heavy Winch Strong Lifting Tower Crane
US$17,899.00-109,999.00
1 Piece(MOQ)
Topkit Tower Crane High Torque for Heavy Component Sites with Powerful Winch Strong Lifting Capacity Tower Crane
US$17,899.00-109,999.00
1 Piece(MOQ)
PT7032 Tower Crane: Ideal for Urban Construction Sites
US$300,000.00-310,000.00
1 set(MOQ)
Topless Remote Controlled for Bridge Construction Sites with Wireless Handle Easy Handling Tower Crane
US$17,899.00-109,999.00
1 Piece(MOQ)
Topkit Tower Crane Full Sealed for Dust Area Sites with Sealed Structure Dust Prevention Tower Crane
US$17,899.00-109,999.00
1 Piece(MOQ)
Construction Building Machinery Topkit 5013 Tower Crane 5ton/6ton for Sale
US$9,000.00-100,000.00
1 Piece(MOQ)
Reliable PT7528 Tower Crane for Large-Scale Construction Sites
US$300,000.00-310,000.00
1 set(MOQ)
Qtz125 (TC6015A) Tower Crane for Construction Sites
US$114,000.00-115,000.00
1 set(MOQ)
Cheap Topkit/Hammerhead Tower Crane Qtz160 6515-10t Building Construction Crane for Sale
US$9,000.00-100,000.00
1 Piece(MOQ)
Tc6015 Topkit Tower Crane for Construction Sites 47m Height
US$116,000.00
1 Set(MOQ)
Construction Tower Crane 5013 6t Topkit / Flattop Tower Crane Price
US$9,000.00-100,000.00
1 Piece(MOQ)
Self-Erected Tower Crane Qtk25 with a Span of 25m for Construction Sites
US$17,000.00-20,000.00
1 Piece(MOQ)
Compact Tower Crane for Urban Building Sites
US$56,000.00-56,500.00
1 Piece(MOQ)
Steady Pre-Owned Top-Free Wa7020-12 Tower Crane for Podium Construction Sites
US$38,500.00-41,600.00
1 set(MOQ)
Versatile Boom Crane for Efficient Lifting in Construction Sites
US$10,000.00-500,000.00
1 Unit(MOQ)
Durable Topkit Tower Crane Tc5010 for Efficient Construction Projects
US$10,000.00-500,000.00
1 Unit(MOQ)
High Efficiency Used Wa6012-6 Construction Tower Crane for Commercial Building Sites with VFD Control System
US$33,500.00-34,500.00
1 set(MOQ)



















