SourcingAI
Try for free
Powered by Made-in-China.com
238-2704 C12 Diesel Engine Spare Parts Piston Ring Set for Excavator Bulldozer
US$9.00-15.00
6 Pieces
Sample price:US$15.00/piece.Request sample

Product profile

Customization

Available

Certification

CCC, ISO9001, TS16949

Standard Component

Standard Component

Model NO.

238-2704

Technics

Forging

Material

Alloy Steel

Type

Piston Ring

Application

Construction Machinery, Tractor, Heavy Truck, Boat

Engine Model

C12

Engine Type

Diesel Engine

Quality

100% New

Delivery Time

7days

Transport Package

Standard Package

Specification

0.3KG

Trademark

DFYLD

Origin

Hubei, China

Production Capacity

5000 Pieces/Months

Key features

High Quality Assurance: Genuine and aftermarket options available with 100% new quality guarantee.
Fast Delivery: Spare parts delivery time is generally 3-10 days, with some items in 7 days.
Wide Compatibility: Suitable for Construction Machinery, Tractor, Heavy Truck, and Boat applications.
Multiple Certifications: Certified with CCC, ISO9001, and TS16949 standards for reliability.
Flexible Packaging: Standard wooden box packaging or customized packing according to special needs.
Competitive Pricing: Lowest possible cost in China with most competitive wholesale prices.

Company profile

Shiyan Yilianda Industry And Trade Co., Ltd.
Years of Export ExperienceExperienced TeamExhibition ExperienceImporters and Exporters
Business Type: Trading CompanyExport Year: 2010-02-04Nearest Port: Shanghai port, Shenzhen portAverage Response Time: ≤2.84hTerms of Payment: T/T, Western UnionInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAP, CIP

About Our Factory & Business Background

AddressNo. 6148, Fuqiao Zone, Auto Parts Town, 442000, Shiyan, Hubei, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsDiesel Engine Assembly, Cummins Engine Spare Parts, Cylinder Liner Cylinder Head Cylinder Block, Piston Kits Connecting Rod Bearings, SCR System Urea Pump Nox Sensor, Fuel Pump Injector Nozzles, Spare Parts for Excavators Tractors Crane, Water Air Cooling System Turbocharger, Engine Repair Kit for Aftermarket, Crankshafts Camshafts

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:How to buy engine spare parts?
A:
Please provide the part number. If unknown, provide the parts name and engine series number, and we will check the part number for you.
Q:How long is the delivery time?
A:
For spare parts, the general delivery time is 3-10 days. For complete engines, it is 15-30 days depending on production arrangement.
Q:How to arrange delivery?
A:
We recommend shipping to your nearest port to save costs. For small or urgent items, air shipment to your city or company address is available.
Q:What are the payment methods?
A:
We suggest a 30/70 T/T payment method: 30% down payment upon order placement, and the remaining 70% due upon shipment.
Q:What are the packing methods?
A:
Normally, we use wooden boxes for packaging. We can also pack items according to your special needs.

Send Inquiry

*To:Shiyan Yilianda Industry And Trade Co., Ltd.Shiyan Yilianda Industry And Trade Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Grf Engine Parts Piston Ring Set 9323296
Made-in-China.com