Powered by Made-in-China.com
Customized Waterproof Ultra-Long Lead Wire Backlight Metal Keyboard, Membrane Switch, Membrane Switch Keypad
US$3.00
1-499 Pieces
US$2.00
500-999 Pieces
US$1.50
1,000-4,999 Pieces
US$1.00
5,000+ Pieces
Product profile
Customization
AvailableType
RigidStructure
Power Built-in TypeModel NO.
chunyip-kg605Material
Pet/PC/FPC/PCB/PMMA/Silicone/MetalUsage
Playback Switch, Disconnector, Change-over Switch, Control SwitchApplication
Home Appliance, Telecommunication Equipment, With Remote Control, Calculator, CameraContact Type
Type c ContactNumber of Switch
Multi Control SwitchDetection Method
Retro-reflective ModeBrand
ChunyipCertification
ISO9001, CE, CCCRear Adhesive
3m467/468/9080A/9448APanel Printing
The Reverse PrintingThe Lamp
LED BacklightOpen Circuit Resistance
10m-100VStorage Temperature Flat/Metal Dome
-20°c to +50°cButton Life
1000000 Times or MoreTransport Package
Carton PackagingSpecification
custom specificationTrademark
CHUNYIPOrigin
DongguanHS Code
8538900000Production Capacity
50000Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 17 Years CertifiedNearest Port: Shenzhen PortAverage Response Time: ≤5.67h
About Our Factory & Business Background
AddressXingye 5 Street, Xiabian Village, Chang'an Town, Dongguan, Guangdong, China
Plant Area4000 square meters
Number of Employees44
Registered Capital3,000,000 RMB
Terms of PaymentLC, T/T, Small-amount payment, Western Union, PayPal, D/P
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity100
Supply Chain Partners25
Our Production Capability & Technical Expertise
Main ProductsMembrane Switch
Production Lines5
Production MachinesLaser Cutting Machine, Cutting Machine, Oven, Auto Mounting Machine, Punching Machine, Tunnel Oven, Silkscreen Machine, Auto Silkscreen Machine
QA/QC inspectors3 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers3 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2009-12-04
Main MarketsDomestic
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, Others
Cooperated with Fortune 500No
Send Inquiry
*To:
Dongguan Chunyip Electronic Technology Co., Ltd.
Dongguan Chunyip Electronic Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Customized Size Waterproof Membrane Keyboard 4*4 Membrane Switch Panel Keypad
US$1.20-2.00
1 Piece(MOQ)
Customized Stable Metal Dome Surface Plate Protruding Touch Type Membrane Keyboard Keypad
US$1.00-3.00
1 Piece(MOQ)
Custom Metal Dome Membrane Switch Waterproof LED Backlight Membrane Keypad
US$0.50-3.00
100 Pieces(MOQ)
Customized Silicone Membrane Keyboard Switch Keypad for Industrial Equipmen
US$0.50-2.00
100 Pieces(MOQ)
Customized Button/Switch/Pad Membrane Silicone Rubber Remote Control Keyboard Keypad
Negotiable
1,000 Pieces(MOQ)
Custom Graphic Overlay Membrane Switch Keyboard Keypad with Printing Circuit Board
US$0.60
100 Pieces(MOQ)
Customized Silicone Control Keyboard Membrane Switch Keypad for Remote
US$1.20-2.50
1 Piece(MOQ)
Customized LCD Screen Metal Printed Nameplate Flexible Membrane Switch Keypad
US$0.70-1.30
1 Piece(MOQ)
Custom Membrane Switch Keyboard Keypad with Flexible Circuit
US$0.60
100 Pieces(MOQ)
Customized PCB Based Flat Button Waterproof Touch Screen Membrane Switch Panel Keypad
US$1.20-2.50
1 Piece(MOQ)
Custom Metal Dome Tactile Membrane Keypad Switch Film Buttons Adhesive Keyboard
US$0.38-0.50
500 Pieces(MOQ)
Custom Membrane Metal Dome Tactile Keypad Switch Panel Adhesive Keyboard
US$0.38-0.50
500 Pieces(MOQ)
Pillow Embossing Metal Dome Membrane Keypad for Automotive
US$0.10-0.30
500 Pieces(MOQ)
Custom Touch Switch Membrane Keypad Printed Circuit Tactile Keyboards
US$0.38-0.50
500 Pieces(MOQ)
Custom Metal Dome Membrane Switch Membrane Keypad
US$0.10-0.30
500 Pieces(MOQ)
















