SourcingAI
Try for free
Powered by Made-in-China.com
Alloy Double Mast Vertical Lift with Steel Pallet Buffer Sponge
US$2,805.00
1 Piece

Product profile

Customization

Available

After-sales Service

Online

Warranty

1 Year

Model NO.

GTWY12-200

Application

Workshop Crane, Shipboard Crane, Warehouse Crane

Lift Mechanism

Telescoping Lift

Carrying Capacity

Light Level

Moves

Moving

Driven Type

AC

Running Mode

Moving

Feature

Explosion-Proof, Insulating

Certification

CE, SGS

Features

Steel Pallet+Buffer Sponge+Bubble Bag+Water Proof

Material

Aluminium Alloy

Working Height

13.7m

Platform Height

12m

Loading Capacity

200kg

Lifting Power

1.1kw

Platform Size

1480*600mm

Weight

640kg

Transport Package

PVC Film Wrapped in Pallets

Specification

Customized

Trademark

JIANGNAN DINGGAUN

Origin

China

HS Code

8427900000

Production Capacity

2000 Piece for One Year

Key features

High-Strength Aluminum Alloy: Made of high-quality aluminum alloy for lightweight construction and superior performance.
Single-Person Operation: Lightweight design allows easy pushing by one person without traction needs.
Versatile Application: Ideal for factories, hotels, stations, and maintenance tasks like painting and cleaning.
1-Year Warranty: Comprehensive 1-year quality warranty covering mechanical defects.
Online After-Sales Support: Dedicated online support team available for technical assistance and inquiries.
Customized Standard: Product standards can be customized to meet specific client requirements.
Multiple Height Options: Available in models ranging from 6m to 14m platform height with 200kg capacity.
Robust Safety Features: Equipped with buffer sponge, bubble bag, and waterproof protection for safe transport.

Company profile

Suzhou Dingguan Elevator Co., Ltd.
Raw-Materials TraceabilityQA/QC Inspectors100% Finished Products InspectionODM Services
Business Type: Manufacturer/FactoryExport Year: 2018-07-04Average Response Time: ≤0.44hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF

About Our Factory & Business Background

Address39 Juhua Road, , Wangting Town, Xiangcheng District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsLift Table, Dock Leveler, Lift Platform, Hydraulic Lift, Hydraulic Lift Table, Hand Lift Table, Aluminum Alloy Lift, Hand-Cranked Climbing Ladder, Aerial Work Platform, Mobile Lifting Platform

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe

Product Q&A

Q:What is the Trade Term?
A:
Ex-work factory , FOB Shanghai,
Q:How long is the guarantee (period)?
A:
1 years quality warranty .
Q:How long is our Production leading time?
A:
within15-20 days upon receive deposit in normal season
Q:What is the Payment term?
A:
T/T or L/C at sight. 30% Deposit for start the production ,the balance before the shipment when goods are ready.
Q:What is the packing details?
A:
Packing is made of film or wooden box

Send Inquiry

*To:Suzhou Dingguan Elevator Co., Ltd.Suzhou Dingguan Elevator Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

9m Double Mast Manual Pushing Man Lift
Made-in-China.com