Powered by Made-in-China.com
Full Hydraulic Wireline Core Drilling Rig with Anti Static Components for Safe Operation in Explosive Mining Areas
US$8,000.00-120,000.00
1 Piece
Product specifications
size
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1 YearCertification
ISO 9001:2000, ISO 9001:2008Condition
NewMotor
AC MotorDrill Hole Diameter
Htw-Ntw-BtwDrill Hole Depth
1100-2200-2600Bit Type
Diamond BitDrilling Way
RotaryWeight
12.2 TDiameter
Htw-Ntw-BtwDepth(M)
1100-2200-2600Rated Pressure(MPa)
28Rated Flow(L)
500Cooling Method
Air CoolingRated Speed(Rpm)
2400Rated Power(Kw)
199Transport Package
Export Standard Seaworthy PackingSpecification
7000*2100*2600mmTrademark
DongHengOrigin
Linyi, Shandong Province, ChinaProduction Capacity
1000 Pieces/YearKey features
Anti-Static Safety Design: Equipped with anti-static components for safe operation in explosive mining areas.
Efficient Dust Collection: Uses dust collectors and cyclone separators to effectively collect drilling dust and avoid pollution.
Full Hydraulic System: Hydraulic system controls frame lifting, rod rotation, feeding, and walking to reduce labor intensity.
High Performance Engine: Powered by Weichai six-cylinder turbo engine with 199KW rated power and 2400 RPM speed.
Deep Drilling Capacity: Capable of drilling depths ranging from 1100m to 2600m with a rated pressure of 28 MPa.
Versatile Application: Ideal for geological exploration, monitoring wells, and ground source heat pump air conditioning.
ISO Certified Quality: Manufactured under ISO 9001:2000 and ISO 9001:2008 certification standards.
Customization Support: Accepts OEM and ODM services with custom options from samples, designs, or full customization.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: Confidential CertifiedNearest Port: Qingdao PortAverage Response Time: ≤1.31h
About Our Factory & Business Background
AddressNo. 9 Yimeng Mall, Mengyin County, Linyi, Shandong, China
Plant Area5000 square meters
Number of Employees35
Registered Capital3,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Set
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsWell Drilling Rig, Photovoltaic Drilling Rig, Rope Core Drilling Rig, Truck Mounted Drilling Rig, Down the Hole Drill, Blasting Drilling Rig, Raise The Drilling Rig High, Pipe Pulling Machine, Constru
Production Lines5
Production MachinesDrilling Machine, CNC Lathe
QA/QC inspectors2 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers5 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2019-07-17
Main MarketsDomestic
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:Are you a manufacturer or trading company?
A:
We are both, we have our own factory. And also have many long-relationship factories.
Q:What is your minimum order quantity?
A:
Our MOQ are 1pc or 1 complete set, the price may rely on the order quantity. We are welcome your sample order to testing our quality.
Q:Can you accept OEM & ODM?
A:
Yes, both of them are acceptable,.Please tell us your requirements or design drawings kindly. As we have our own R&D team and the team leader is Dr.Zhao mingchun who has been always in the material research and drawing design of drilling tools for 25 years. And he had designed the world's biggest top hammer bit and DTH hammer bit, highly praised by the users.
Q:How about the delivery time?
A:
It depends, generally it takes about 15-25. If have stocks, Usually only 5-10 days if in stock.
Q:Can I have a visit to your factory before the order?
A:
Sure, welcome, kindly contact us for address details and time schedule.
Send Inquiry
*To:Mengyin Dongheng Engineering Machinery Co., Ltd
*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Hydraulic Drill Rig for Core Exploration with 2400 Rpm Speed
US$29,500.00-31,000.00
1 Unit(MOQ)
Full Hydraulic Crawler Core Drilling Rig Yh-12gl 1500m Depth for Geological & Mining Exploration
US$51,000.00-52,000.00
1 Unit(MOQ)
High Performance Full Hydraulic Core Rig for Underground Resource Detection
US$25,000.00-26,147.00
1 Piece(MOQ)
Portable Full Hydraulic Geotechnical Engineering Sample Exploration Wireline Core Drilling Rig
US$25,500.00-29,000.00
1 Set(MOQ)
High-Performance Hydraulic Core Drilling Rig for Gold Mining
US$32,000.00-38,000.00
1 Piece(MOQ)
Hot Sale Factory Supply Full Hydraulic Core Drilling Rig for Geological Exploration
US$7,000.00-8,000.00
1 Set(MOQ)
Xy-150 Hydraulic Crawler Mounted Mud Pump Core Drilling Rig for Geotechnical Drill
US$9,500.00-12,000.00
1 Set(MOQ)
Full Hydraulic Drilling Rig Core Exploration Drill Rig 1000m Deep with Steel Track
US$26,719.00-27,422.00
1 Piece(MOQ)
Hfdx-4 Full Hydraulic Core Drilling Rig for Land Drilling
US$45,000.00-50,000.00
1 Set(MOQ)
300m/700m/800m Crawler Full Hydraulic Wireline Core Drilling Rig for Ore Exploration
US$45,000.00-55,000.00
1 Piece(MOQ)
Advanced Hydraulic Top Drive Core Drilling Rig for Mineral Exploration
US$32,000.00-38,000.00
1 Piece(MOQ)
Full Hydraulic Geological Core Drilling Rig for Exploration
US$43,800.00-44,800.00
1 Unit(MOQ)
Factory Full Hydraulic Core Drill/Drilling Rig for High Efficiency Resource Exploration
US$50,000.00-90,000.00
1 Piece(MOQ)
Full Hydraulic Spt Core Drilling Rig Wireline Diamond Machine with Telescopic Mast and Powerful Engine
US$26,000.00-30,000.00
1 Piece(MOQ)
Rope Coring Full Hydraulic Core Drilling Rig for Efficient Exploration
US$19,000.00-20,300.00
1 Piece(MOQ)



















