SourcingAI
Try for free
Powered by Made-in-China.com
High-Performance Durable Black SBR Particles for Industry Applications
US$1,250.00-1,350.00
1 Ton
Sample price:US$20.00/kg.Request sample

Product profile

Customization

Available

Appearance

Particle

Solid Content

80%±2

Model NO.

QL-2

Purpose

Asphalt Modifier

Color

Black

Transport Package

Carton

Specification

37cm*37cm*37cm

Trademark

qiaolong

Origin

China

HS Code

4002119000

Production Capacity

22000piece/Years

Key features

High Ductility Performance: Superior ductility compared to block rubber with better anti-aging properties.
Stable Shell-Core Structure: Forms stable shell core in modified asphalt without requiring additional stabilizers.
Excellent Low Temperature Resistance: Ideal for high-speed shear and colloid grinding in cold and northern regions.
Fast Dissolution Time: Short dissolution time compared to block rubber for efficient production.
100% Independent IP: Independent research and development with full intellectual property rights.
Flexible Customization: Offers minor and flexible customization options based on samples.
Versatile Application: Suitable for road asphalt modifiers, extenders, and hydraulic asphalt.

Company profile

Donghongyue (Shandong) International Trade Co., Ltd
Importers and Exporters
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Flexible customization, etc. CertifiedExport Year: Less than 1 year CertifiedNearest Port: Qingdao PortAverage Response Time: ≤0.71h

AI-Powered supplier vetting

SummaryThe supplier operates across waterproofing materials, rubber-related products, mechanical equipment, textiles, chemicals, building materials, and selected medical supplies. It states that it provides OEM services for well-known brands and reports multiple technical patents and ISO9001 certification. Quality assurance and raw-material traceability are identified, but the available evidence also shows no SDK, no inventory, no overseas warehouse or showroom, no valid manufacturing-capacity contract with related subcontractors, and no documented corrective-action or complaint-handling procedures. Lead time is stated as within 15 working days in both peak and off-season, but supplier-service governance documentation is incomplete. Financial records are referenced for 2022–2024, without sufficient detail to assess credibility. R&D resources are limited in the evidence, with one engineer and no available design-control documentation.
CertificationsThe company states that it has passed ISO9001 quality management system certification and holds multiple technical patents. This is explicit evidence of certification and technical recognition, although no certificate number, validity period, or certification scope is provided.
After-Sales capabilityThe supplier states that it has no overseas warehouse or showroom, and it has no written procedures or records for corrective and preventive actions or effective customer-complaint handling. These documented gaps indicate weakly evidenced after-sales service infrastructure.
Production capacityThe supplier reports no valid manufacturing-capacity contract with its related subcontractors and no in-stock capacity. It states an average lead time within 15 working days in both peak and off-season, but service-capability governance lacks written assessment procedures and an approved-supplier list. Overall production capacity is not sufficiently substantiated and includes explicit control gaps.
Customization capabilityThe supplier explicitly states that it provides OEM services for well-known brands and offers products intended to meet varied customer demands. Quality assurance and raw-material traceability are also reported, but the absence of an SDK and formal R&D audit documentation limits evidence for technically complex customization.

Product Q&A

Q:What is your packing?
A:
The products are usually packaged in bags, cartons or drums. please confirm with our sales manager before odering
Q:What is the delivery time?
A:
Delivery time depends on the type and quantity of the product. Usually 7-1 5 days after your deposit
Q:What is the payment terms?
A:
TT or L/C. The payment method is determined by negotiation.
Q:What is your transport?
A:
Normally by sea ,by truck or by Rail;Urgently by air.
Q:Can l get the sample before placing the order?
A:
Of course,we can provide samples for your test.You just need to tell us the address and the quantity of samples you need

Send Inquiry

*To:Donghongyue (Shandong) International Trade Co., LtdDonghongyue (Shandong) International Trade Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Sbs Modified Bitumen Waterproofing Membrane

Sbs Modified Bitumen Waterproofing Membrane

US$1.90-5.00
5,000 Square Meters(MOQ)
Made-in-China.com
Sbs APP Asphalt Membrane for Waterproofing and Roof Protection
Made-in-China.com
Factory Supplier OEM Bitumen Waterproofing Membrane

Factory Supplier OEM Bitumen Waterproofing Membrane

US$1.69-5.69
1,000 Square Meters(MOQ)
Made-in-China.com