SourcingAI
Try for free
Powered by Made-in-China.com
Sbs Granules for Elastic Recovery in Modified Asphalt Pavement Materials
US$2,300.00
1-9 Tons
US$2,250.00
10-29 Tons
US$2,100.00
30+ Tons
Sample price:US$2.00/kg.Request sample

Product profile

Customization

Available

Model No.

Ql-4

Volatiles%≤

0.5

Model NO.

QL-4

Ash Content%≤

0.1

Oil Content,Wt%

0

300% Tensile Sres≥S(MPa),≥

4.0

Tensile Strength 35min(MPa),≥

24

Break Elongation,%≥

600

Permanent Deformation,≤

50

Hardness(a),≥

90

Melt Flow Rate(G/10min)

0.05-0.13

Transport Package

Polyprooylene Woven Bags

Specification

20KG

Trademark

Qiaolong

Origin

Shandong, China

HS Code

4002119000

Production Capacity

11000/Year

Key features

Improved Elastic Recovery SBS Granules help improve elastic recovery performance in modified asphalt and pavement materials.
Enhanced Pavement Durability Supports better durability, toughness and deformation resistance in road asphalt systems.
Good Compatibility with Bitumen Provides good compatibility with bitumen and supports stable modified asphalt processing.
Better Crack Resistance Helps improve flexibility and reduce cracking risks in asphalt pavement applications.
Suitable for Road Asphalt Materials Used in modified asphalt, road pavement materials, polymer modified bitumen and road construction applications.

Company profile

Donghongyue (Shandong) International Trade Co., Ltd
Importers and Exporters
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Flexible customization, etc. CertifiedExport Year: Less than 1 year CertifiedNearest Port: Qingdao PortAverage Response Time: ≤1.24h

AI-Powered supplier vetting

SummaryThe supplier operates across waterproofing materials, rubber-related products, mechanical equipment, textiles, chemicals, building materials, and selected medical supplies. It states that it provides OEM services for well-known brands and reports multiple technical patents and ISO9001 certification. Quality assurance and raw-material traceability are identified, but the available evidence also shows no SDK, no inventory, no overseas warehouse or showroom, no valid manufacturing-capacity contract with related subcontractors, and no documented corrective-action or complaint-handling procedures. Lead time is stated as within 15 working days in both peak and off-season, but supplier-service governance documentation is incomplete. Financial records are referenced for 2022–2024, without sufficient detail to assess credibility. R&D resources are limited in the evidence, with one engineer and no available design-control documentation.
CertificationsThe company states that it has passed ISO9001 quality management system certification and holds multiple technical patents. This is explicit evidence of certification and technical recognition, although no certificate number, validity period, or certification scope is provided.
After-Sales capabilityThe supplier states that it has no overseas warehouse or showroom, and it has no written procedures or records for corrective and preventive actions or effective customer-complaint handling. These documented gaps indicate weakly evidenced after-sales service infrastructure.
Production capacityThe supplier reports no valid manufacturing-capacity contract with its related subcontractors and no in-stock capacity. It states an average lead time within 15 working days in both peak and off-season, but service-capability governance lacks written assessment procedures and an approved-supplier list. Overall production capacity is not sufficiently substantiated and includes explicit control gaps.
Customization capabilityThe supplier explicitly states that it provides OEM services for well-known brands and offers products intended to meet varied customer demands. Quality assurance and raw-material traceability are also reported, but the absence of an SDK and formal R&D audit documentation limits evidence for technically complex customization.

Product Q&A

Q:What are SBS Granules used for in modified asphalt?
A:
SBS Granules are used as polymer modifiers for modified asphalt, polymer modified bitumen and road pavement materials. They help improve elastic recovery, flexibility and durability.
Q:Can SBS improve elastic recovery of asphalt?
A:
Yes. SBS helps improve elastic recovery performance in modified asphalt and pavement materials.
Q:Is this product suitable for road pavement materials?
A:
Yes. It is suitable for road pavement materials, modified asphalt, polymer modified bitumen and road construction applications.
Q:Is sample testing necessary?
A:
Yes. Different bitumen sources, dosage, formulation and processing conditions may affect final performance. Sample testing is recommended before bulk order.
Q:What information should I provide?
A:
Please share your application, bitumen type, target low-temperature performance, processing temperature, dosage requirement and destination port. We will recommend a suitable grade and provide quotation accordingly.

Send Inquiry

*To:Donghongyue (Shandong) International Trade Co., LtdDonghongyue (Shandong) International Trade Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Factory Supplier OEM Bitumen Waterproofing Membrane

Factory Supplier OEM Bitumen Waterproofing Membrane

US$1.69-5.69
1,000 Square Meters(MOQ)
Made-in-China.com
Sbs Modified Bitumen Waterproofing Membrane

Sbs Modified Bitumen Waterproofing Membrane

US$1.90-5.00
5,000 Square Meters(MOQ)
Made-in-China.com
Sticky Type Bitumen Waterproofing Membrane with Release Film
Made-in-China.com
Mineral Granule Top Sbs Waterproof Roofing Membrane

Mineral Granule Top Sbs Waterproof Roofing Membrane

US$2.29-4.99
5,000 Square Meters(MOQ)
Made-in-China.com