SourcingAI
Try for free
Powered by Made-in-China.com
OEM ODM Gravity Casting Pump Housing for Centrifugal Water Pump
US$3.50
500-4,999 kg
US$2.90
5,000-9,999,999 kg
US$1.50
10,000,000+ kg

Product profile

Customization

Available

Casting Method

Thermal Gravity Casting

Process

Sand Casting

Model NO.

centrifugal pump casting

Molding Technics

Gravity Casting

Application

Hydraulic System Construction Machinery

Material

Aluminum A356 A380

Surface Preparation

Shot Blasting Polishing Painting

Surface Roughness

Ra1.6~12.5μm or as Your Request

Machining Tolerance

±0.01~±0.05mm or as Per Drawing

Standard

ISO8062,ASTM,AISI,DIN,BS,JIS,NF,as,AAR

Certification

CE, ISO 9001:2000, ISO 9001:2008

Quality Control

Pressure Test Dimensional Check Visual Inspection

MOQ

1000kgs

Size

as Per Drawing

Service

OEM,ODM Customized

Transport Package

Carton, Carton+Pallet, Wood Carton or Customized

Specification

as per drawing

Trademark

DONGJU

Origin

China

HS Code

84

Production Capacity

50000

Key features

We eliminate porosity and leakage by aluminum degassing and full pressure test
We ensure accurate mounting fit by CNC machining and batch fixture inspection
We improve pump efficiency by smooth inner flow channel grinding and cleaning
We remove cold shut defects by optimized mold temperature and surface finishing
We control heat treatment deformation with fixture positioning and gradual cooling
Complaint 1: Porosity causes pressure leakage during pump operation Solution: Degas and filter molten aluminum, 100 percent hydrostatic pressure test before shipment
Complaint 2: Dimensional deviation on mounting flange and shaft bore Solution: CNC machine critical surfaces and bores, batch inspection with checking fixture
Complaint 3: Rough inner flow channel reduces pump efficiency Solution: Optimize gating design, smooth inner wall by grinding and shot blasting
Complaint 4: Cold shut and surface defects affect pump appearance and coating Solution: Control mold temperature, remove surface defects by grinding and polishing
Complaint 5: Deformation after heat treatment affects alignment Solution: Use fixture positioning during heat treatment, controlled cooling rate

Company profile

CertifiedBusiness Type: Manufacturer/Factory CertifiedCustomization Options: Customization from SamplesExport Year: 2020-08-05 CertifiedNearest Port: Ningbo PortAverage Response Time: ≤2.00h CertifiedTerms of Payment: T/T, PayPal, Western Union, etc.

About Our Factory & Business Background

AddressRoom 1001-13, No. 1299 East Section of Yinxian Avenue, Shounan Street, Yinzhou, Ningbo, Zhejiang, China
Plant Area700 square meters
Number of Employees8
Registered Capital1,000,000 RMB
International Commercial Terms(Incoterms)EXW, FOB, CIF, CFR
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Minimum Order Quantity100 pcs
Supply Chain Partners2

Our Production Capability & Technical Expertise

Main ProductsMachinery Parts, Metal Products
Production Lines1
Production MachinesCNC Machine, Drilling Machine, Punching Machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsNo

Our Industry Experience & Global Business Record

Year of Establishment2020-04-16
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Product Q&A

Q:Are you a trading company or manufacturer?
A:
We are a factory with more than 20 years' experience.
Q:How long for delivery?
A:
Forks in stock, very fast delivery in 7days Maching parts, casting parts, forging parts need around 40-60days per different qty.
Q:Can you customize my products?
A:
Yes, we can customize products with your design drawings like DWG, DXF, DXW, IGES, STEP, PDF, etc.
Q:What is your terms of payment?
A:
30% T/T in advance, balance before shipment, or as per discussion.
Q:What about your quality control?
A:
* Checking the raw material after they reach our factory-----Incoming quality control(IQC) * Checking the details before the production line operated * Have full inspection and routing inspection during mass production----In-process quality control(IPQC) * Checking the goods after they are finished----Final quality control(FQC) * Checking the goods after they are finished----Outgoing quality control(QC) * 100% inspection and delivery before shipment

Send Inquiry

*To:NINGBO DONGJU MACHINERY CO., LTDNINGBO DONGJU MACHINERY CO., LTD
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like