Powered by Made-in-China.com
Modular Heavy Duty Galvanized Ringlock Scaffold System for Data Center Construction
US$700.00-900.00
25 Pieces
Product profile
Customization
AvailableMaterial
MetalType
MobileModel NO.
Frame ScaffoldStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
Single Row ScaffoldingErection Position
External ScaffoldingConstruction Properties
Installation ScaffoldProduct Name
Ringlock ScaffoldingDiameter
48.3mmThickness of The Tube
3.25mmTube Thickness
1.6-4.0mmRosette
Q235B /Q355bSurface Treatment
Hot Dipped GalvanizedComponents
Standard, Ledger, BraceTransport Package
Standard Packaging or CustomizedSpecification
Standard Specifications or CustomizedTrademark
DOYENOrigin
ChinaProduction Capacity
50000pieces/YearKey features
Versatile Applications: Suitable for bridge engineering, industrial construction, municipal projects, and cultural facilities.
Rapid Assembly System: Unique rosette connection allows quick installation with simple hammer taps, reducing labor time.
High Load Capacity: Constructed with low-alloy structural steel offering superior strength compared to traditional carbon steel.
Enhanced Safety Design: Interlocking joints distribute forces evenly with self-locking latches preventing loosening.
Cost-Effective Solution: Reduces steel usage, labor costs, and material waste through efficient design and recyclability.
Customizable Options: Supports customization for LOGO, color, appearance, and size to meet specific client needs.
Fast Delivery: Standard delivery time within 20 days for all orders.
Durable Surface Treatment: Hot dipped galvanized finish ensures long service life and environmental friendliness.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: OEM Service Available CertifiedCustomization Options: Customization from Samples CertifiedExport Year: 4years CertifiedNearest Port: Tianjin PortAverage Response Time: >24h
About Our Factory & Business Background
AddressBeijing, China
Plant Area84 square meters
Number of Employees10
Registered Capital10,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity25tons
Supply Chain Partners10
Our Production Capability & Technical Expertise
Main ProductsScaffolding, Cable Trays, Wiremesh
QA/QC inspectors1 people
Inspection Type for Finished ProductsRandom inspection(Visual inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2020-09-03
Main MarketsSoutheast Asia/ Mideast
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff4
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:Are you a factory or a trader?
A:
We are a manufacturer integrating industry and trade. Welcome to visit our company.
Q:Can I add my LOGO to the product?
A:
We support on-demand customization, including LOGO customization, color customization, appearance size customization, etc.
Q:What payment methods do you support?
A:
We support T/T, Western Union, PayPal, cash, etc. The details can be negotiated.
Q:What are your modes of transportation?
A:
We usually choose the appropriate mode of transportation (sea, air, land) according to the conditions of the goods, or we can choose the mode of transportation according to your requirements.
Q:How can I get an accurate quotation?
A:
You can first send your specific demand information and product pictures, and we will customize a solution for you according to your needs and inform you of the specific price.
Send Inquiry
*To:
Beijing Kvs Building Materials Co., Ltd.
Beijing Kvs Building Materials Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy-Duty Steel Scaffold System for Reliable Outdoor Projects
US$730.00
5 Tons(MOQ)
Heavy-Duty Q355 Galvanized Ringlock Scaffolding System for Construction
US$23.90-29.90
100 Pieces(MOQ)
Heavy-Duty Galvanized Ringlock Aluminum Scaffolding System for Construction
US$23.90-29.90
100 Pieces(MOQ)
Premium Heavy-Duty Ringlock Scaffolding System for Global Export
US$5.00-10.00
1,000 Pieces(MOQ)
Heavy-Duty Galvanized Steel Scaffold System for Secure Locking
US$730.00
5 Tons(MOQ)
Hunan Innoscaffolding Premium Heavy-Duty Ringlock System for Construction
US$699.00
1 Ton(MOQ)
Steel Concrete Formwork and Shoring Components Scaffold Ringlock System for Construction
US$45.00-65.00
1 Piece(MOQ)
Heavy-Duty Ringlock Scaffold System for Reliable Building Support
US$5.20-19.30
100 Pieces(MOQ)
Heavy-Duty Q235 Hot-DIP Galvanized Steel Ringlock Scaffolding System Layher
US$675.00-685.00
25 Tons(MOQ)
Reliable Heavy-Duty Scaffold System with Galvanized Steel Design
US$699.00
1 Ton(MOQ)
Heavy-Duty Q355 Ringlock Scaffolding System for Safe Construction
US$750.00
1 Ton(MOQ)
Modular Steel Ringlock Scaffolding System for Construction with Hot-DIP Galvanizing
US$5.00-10.00
1,000 Pieces(MOQ)
Heavy-Duty Hunan Scaffolding System for Global Construction Needs
US$699.00
1 Ton(MOQ)
Heavy-Duty Painted Metal Scaffolding System for Construction Projects
US$30.00-50.00
300 Pieces(MOQ)
Durable Q235/Q355 Galvanized Ringlock Scaffold System for Construction
US$23.90-29.90
100 Pieces(MOQ)
Heavy-Duty Scaffolding System with Safe Ringlock for Builders
US$5.00-12.00
1,000 Pieces(MOQ)
Heavy Duty Galvanized Ringlock Scaffolding System for Enhanced Stability
US$700.00-900.00
25 Tons(MOQ)
Layher System steel Building Materials Ringlock System for Construction Projects
US$1.50-1.80
1 kg(MOQ)
Durable Hot DIP Galvanized Ring Lock Scaffold System for Outdoor Use
US$1.00
10,000 Pieces(MOQ)



















