SourcingAI
Try for free
Powered by Made-in-China.com
Heavy-Duty Portable Steel Scaffold for Construction Use 2X2m
Negotiable
6 Meters

Product profile

Customization

Available

Material

Steel

Type

Fixed

Model NO.

LRT2

Structural Style

Tower Scaffolding

Framework

Frame Combined Scaffolding

Supporting Mode

Projecting Scaffolding

Lapping Form

Double Scaffolding

Erection Position

External Scaffolding

Move Method

Horizontal mobile Scaffolding

Scaffolding Part Type

Scaffolding Frames

Construction Properties

Building Scaffold

Place of Origin

Guangdong, China (Mainland)

Main Tube

51*2mm

Length

2-40m

Dimension

2*2m(Other Size Can Be Ordered)

Brand Name

Dragon Truss

Packaging Details

Air Bubble Film

Delivery Detail

2- 7 Working Days After The Order Is Confirmed

Platform Load

272kg

Entier Load

900kg

Transport Package

Air Bubble Film

Specification

HD1004

Origin

Guangzhou, China

Production Capacity

2000 Meters Per Month

Key features

Durable Aluminum Alloy: Constructed from lightweight and solid Aluminum alloy 6082-T6 for long-term durability.
High Load Capacity: Supports 272kg platform load and 900kg total load for heavy-duty construction tasks.
Customizable Sizes: Available in standard 2x2m dimensions with other sizes available upon order.
Adjustable Platform Height: Platform can be fixed at different heights to suit various working requirements.
Enhanced Security Features: Equipped with handrails and toe boards to ensure worker safety during use.
Easy Assembly: Designed for easy dismantling and assembly, reducing construction time significantly.
Fast Delivery: Orders delivered within 2-7 working days after confirmation.
OEM/ODM Services: Full OEM and ODM services available for customized manufacturing needs.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2008-06-03 CertifiedNearest Port: Shenzhen Port, Guangzhou PortAverage Response Time: ≤10.50hTerms of Payment: T/T, Western Union

About Our Factory & Business Background

AddressNo. 3-2, Hengsan Road, Xiaxi Industrial Zone, Heshun, Lishui Town, Nanhai District, Foshan, Guangdong, China
Plant Area3000 square meters
Number of Employees30
Registered Capital1,010,000 RMB
International Commercial Terms(Incoterms)FOB, EXW, CIF
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsLighting Truss, Event Stage, Aluminum Scaffolding, Pro Lighting, Pro Sound, Flightcase and Other Events Products
Production MachinesBending Facility, Cutting Facility, Cutting Facility, Milling Facility, Welding Facility
R&D Engineers2 people
Test Reports for Raw MaterialsOthers
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2008-12-24
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Number of Foreign Trading Staff5
Overseas Agent/BranchNo

Our Certifications, Standards & Industry Recognition

Product CertificationCE, RoHS

Product Q&A

Q:What material is the scaffold made of?
A:
The scaffold is made from durable and lightweight Aluminum alloy 6082-T6.
Q:What are the load capacity limits?
A:
It supports a platform load of 272kg and an entire load of 900kg.
Q:Can I order custom sizes?
A:
Yes, other sizes besides the standard 2x2m can be ordered.
Q:How long does delivery take?
A:
Delivery takes 2-7 working days after the order is confirmed.
Q:Is the scaffold easy to assemble?
A:
Yes, it features easy dismantling and assembly to reduce time and increase work space.

Send Inquiry

*To:FOSHAN DRAGON STAGE EQUIPMENT CO.,LTDFOSHAN DRAGON STAGE EQUIPMENT CO.,LTD
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like