SourcingAI
Try for free
Powered by Made-in-China.com
High Quality Wind Power CE Approached Hybrid Wind Solar Generator (3900W) Wind Turbine System Small Wind Energy System Home Wind System
US$2,150.00-2,910.00
1 Set
Sample price:US$3400.00/piece.Request sample

Product profile

Customization

Available

Output Type

AC Three Phase

Number of Blade

Three Blade

Model NO.

ET-WT3KL-WS

Rotating Shaft

Horizontal

Stress Way of Blade

Resistance

Power

<10kW

Phase

Single-Phase

Certification

CE, ISO, RoHS, FCC

Model

Et-Wt3kl-Ws

Rated Power

3kw Wind+900W Solar

Rated Voltage(V)

120/240

Wind Wheel Diameter(M)

4

Blade Material

Gfrp Strengthening

Blade Qtys

3

Start Windspeed(M/S)

3

Work Windspeed(M/S)

3.0-25

Design Service Life (Years)

15~20

Start Torsion(N/M)

3

Transport Package

Polywood

Specification

CE, ISO, ROHS

Trademark

EagleTech Energy

Origin

Shanghai, China

HS Code

8502310000

Production Capacity

500 Sets/Month

Key features

Hybrid Wind Solar System: Combines wind and solar energy to ensure stable, continuous power output and overcome intermittency.
Low Start Wind Speed: Starts generating power at 3m/s breeze with high-efficiency GFRP blades and advanced aerodynamic design.
Dual Automatic Braking: Features ASP patent technology with dual automatic emergency braking for safety and stability.
Smart Remote Monitoring: Controller supports WIFI and GPRS for real-time status monitoring without cable limitations.
High Efficiency Output: Patented PWM controller with DDPMSG generator outputs 12% more power than standard turbines.
Low Noise Operation: Unique anti-vibration design ensures quiet operation with noise levels below 55dB.
Easy Installation: Tilt-up tower design allows installation without heavy equipment like cranes, suitable for various terrains.

Company profile

Business Type: Manufacturer/Factory, Group CorporationExport Year: 2012-04-05Nearest Port: Shanghai, QingdaoAverage Response Time: ≤15hTerms of Payment: T/T, Western UnionInternational Commercial Terms(Incoterms): FOB, CFR, CIF, FCA, EXW

About Our Factory & Business Background

AddressDacao Industrial Park, Yangguang Road, Dacao Town, Dezhou, Shandong, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsWind Generator, Wind Turbine, Solar Panel, Wind Solar Hybrid System, Wind Power, Solar Power, Wind Turbine Generator, Wind Controller, Solar Controller, Inverter

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Western Europe

Product Q&A

Q:Are you a trading company or manufacturer?
A:
We are a professional manufacturer in Shandong, China, with 15 years of experience. We have two workshops for small and big wind turbines and export globally under the EagleTech Energy brand.
Q:Can I order a sample system?
A:
Yes, we welcome sample orders to test quality. Mixed samples with different accessories are acceptable.
Q:What is the lead time for production?
A:
Sample systems take 5-7 working days. Mass production takes 3-4 weeks depending on order quantity and shipping method (LCL or FCL).
Q:Is there a minimum order quantity (MOQ)?
A:
We have a low MOQ. One system is available for sample testing and is welcome.
Q:How do you ship goods and what is the delivery time?
A:
We offer both airline and sea shipping options. Delivery time depends on the distance and destination port.

Send Inquiry

*To:Chengdu EagleTech Energy Co., Ltd.Chengdu EagleTech Energy Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Solar Wind Hybrid Power System with 5kw Wind Generator
Made-in-China.com