Powered by Made-in-China.com
Skived Rolled Tube, Honing Pipe for Heavy-Duty Fluid Systems
US$15.00
1,000-1,999 kg
US$13.00
2,000-4,999 kg
US$12.00
5,000+ kg
Sample price:US$18.00/kg.Request sample
Product profile
Customization
AvailableAfter-sales Service
MaintenanceWarranty
1 YearType
SeamlessTechnique
Cold DrawnMaterial
Carbon SteelSurface Treatment
BlackUsage
Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special PurposeGrade
20Delivery Time
22-30 DaysApplication
Fluid Pipe, Boiler Pipe, Drill Pipe, Hydraulic PipCertificate
JIS, ISO9001Processing Service
Welding, Punching, Cutting, Bending, DecoilingDelivery Condition
Bk+S, NbkStraightness
<=0.5/1000Types
Seamless, Cold Drawn, Honed, Skived Roller BurnishService
Honed Tube, Chrome Rod, Make and Repair HydraulicTransport Package
Paper Sleeved, Shockproof Membrane, Wooden CaseSpecification
4m, 5.8m, 6m, 7.5mTrademark
ISO F7Origin
ChinaHS Code
8483109000Production Capacity
20000tons/YearKey features
Premium Material Selection: Crafted from SAE1020, ST52, SAE1045, 4140, and premium stainless steels for unmatched durability.
High-Precision Tolerances: Adheres to ISO standards H7, H8, H9, H10, and H11 for precise hydraulic cylinder performance.
Superior Surface Finish: Achieves remarkable roughness of Ra 0.4 microns ID finish, reducing friction and optimizing flow.
Comprehensive Quality Control: Includes chemical analysis, tensile testing, and chrome plating thickness tests with EN 10204/3.1 certificates.
Secure Packaging Solutions: Tube ends sealed with plastic or steel caps and encased in seaworthy wooden crates or plastic bags.
Wide Size Range: Metric sizes from I.D 30mm to 800mm and Imperial sizes from 1.5" to 30" with various wall thicknesses.
Flexible Customization: Offers bespoke steel grades, dimensions, and processing services like welding, punching, and bending.
Advanced Manufacturing Process: Utilizes cold drawing, honing, skiving, and roller burnishing for structural integrity and precision.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Flexible customization CertifiedExport Year: 10 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤6.65h
About Our Factory & Business Background
AddressLuqu Industry Park, Lunan Rd, No. 108, Wuxi, Jiangsu, China
Plant Area312 square meters
Number of Employees34
Registered Capital500,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Ton
Supply Chain Partners10
Our Production Capability & Technical Expertise
Main ProductsHoned Tube, Chrome Plated Bar, Chrome Bar, Aluminium Tube, Hydraulic Cylinder, Hydraulic Power Unit, Hydraulic Power Pack
Production Lines1
Production MachinesSawing Machine, Drilling Machine, Skiving Machine, Pressing Machine, Honing Machine
QA/QC inspectors1 people
Inspection Type for Finished ProductsRandom inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2014-01-17
Main MarketsSoutheast Asia/ Mideast, Australia
Repeat Buyers Choice< 10%
Number of Foreign Trading Staff19
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the delivery time of hydraulic honed tubes?
A:
As one of the largest hydraulic honed tube suppliers in the area, we stock a lot of different sizes and materials of mother tubes for honed tubes, so normally our delivery time is 10-20 days depends on the quantity and size.
Q:Can you ensure the quality of the hydraulic cylinder tube?
A:
Yes, we execute Total Quality Management System in our hydraulic cylinder tube factory. We only use raw materials (mother tube) made in China top quality steel maker such as TPCO Sha-Steel, Huaigang Special Steel and so on. And we will inspect every honed tube for hydraulic cylinder before packing, the honed cylinder tube will be supplied with mill test certificate according to EN 10204 /3.1.
Q:Is your company hydraulic cylinder tube manufacturers or trading company?
A:
Yes, we are true hydraulic cylinder tube factory company located in Wuxi, Jiangsu, we are one of the professional hydraulic cylinder tube manufacturers in China, we welcome customers to come to visit our factory, Then you can see the details.
Q:How can you protect the inside surface of the honed tubes from damage during transportation?
A:
To protect the inner surface of the honed lD tubing, we will plug each tube with tube caps on each end, the tube caps usually are plastic in green or yellow. And for big lD honed tubes we can weld a steel cap on each tube end to protect the lD surface on customers request.
Q:Did you export your honed pipes to oversea countries? And what is your main oversea market?
A:
Yes, as the one of the largest hydraulic cylinder honed tube suppliers in china, we exported our cylinder tubes to many customers in oversea countries, our main market including USA, Vietnam, Australia, Russia, UAE, Saudi Arabia, Canada, South Africa, Thailand, Brazil, Mexico, etc.
Send Inquiry
*To:
East Ai Machinery Co., Limited
East Ai Machinery Co., Limited*Content:
Supplier replies will be sent to your registered email
You may also like
Premium Hydraulic Tube and Honing Pipe for Industrial Fluid Systems
US$12.00-15.00
1,000 kg(MOQ)
High-Performance Skived Rolled Tube and Honing Pipe for Drilling
US$12.00-15.00
1,000 kg(MOQ)
Skived and Rolled Burnished Honed Hydraulic Tube Power Wind System Component E355 St52 Precision Cold Drawn Honed Pipe
US$900.00-1,050.00
1 Piece(MOQ)
Durable Skived Rolled Tube and Honing Pipe for Hydraulic Pipelines
US$12.00-15.00
1,000 kg(MOQ)
Skived Rolled Tube, Honing Pipe for High-Performance Boiler Use
US$12.00-15.00
1,000 kg(MOQ)
Heavy-Duty Gi Steel Pipe Q235B Welded Tube for Industrial Projects
US$590.00-760.00
1 Ton(MOQ)
Shengtao 304 316 Inox Tube Stainless Steel Pipe for Heavy Duty
US$1,230.00-1,900.00
1 Ton(MOQ)
ASTM A252 Grade 3 Carbon Steel Tube Carbon Steel Pipe Heavy Duty Piling Steel Pipe for Construction
US$550.00-1,350.00
1 Ton(MOQ)
Heavy-Duty Galvanized Steel Pipe for Efficient Water Systems
US$460.00-520.00
10 Tons(MOQ)
Heavy-Duty Seamless Oil Casing Pipe for Gas Extraction and Transportation Systems
US$750.00-950.00
1 Ton(MOQ)
Heavy-Duty Seamless Steel Pipes for Hydraulic Cylinder Systems
US$580.00-650.00
25 Tons(MOQ)
Hot Rolled 20# Carbon Seamless Steel Pipe Industrial Fluid Tube for Chemical Conveyance System
US$520.00-540.00
1 Ton(MOQ)
Heavy-Duty Galvanized Steel Pipe for Reliable Water Systems
US$560.00-592.00
1 Ton(MOQ)
High-Quality Steel Pipe & Tube for Heavy-Duty Construction
US$500.00-600.00
5 Tons(MOQ)
Heavy Duty Anti-Corrosion Seamless Pipe for Fire Fighting System with Thick Epoxy Coating Layer
US$700.00-1,200.00
1 Ton(MOQ)



















