SourcingAI
Try for free
Powered by Made-in-China.com
Efficient Eastemate Electrode Paste for Ferrochrome and Soderberg Solutions
US$400.00-500.00
20 Tons
Sample price:US$0.00/kg.Request sample

Product profile

Customization

Available

Ampere Density

13-18A/cm�

Application Area

Chemical Industry

Model NO.

EM-EP-01

Manufacturing Technique

Machining

Shape

Ball

Si

<0.28%

Fe

<0.25%

Ash Content

2-10%

V.M

10.0-15.0%

Transport Package

Jumbo Bag

Specification

1 ton / unit

Trademark

Eastmate

Origin

China

Production Capacity

100000 Tons

Key features

High Compression Strength: Over 18Mpa, providing durability and stability under high pressure.
Customizable Composition: Si <0.28%, Fe <0.25%, and Ash Content 2-10% tailored to specific needs.
Fast Sample Delivery: Samples available for quality check with delivery in 3-10 days.
Flexible Packaging: Options include bulk, ton bags, or containers based on customer requirements.
Global Logistics: Door-to-door services via DHL/UPS/FedEx or cost-effective sea transport.
Competitive Pricing: Cost-optimization solutions with competitive rates across various specifications.
Robust Production: Five major production bases with annual output of 200,000 tons calcined coke.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 2 years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤1.96h

AI-Powered supplier vetting

SummaryThe supplier manufactures graphite and carbon products and operates four production lines, with a calcined petroleum coke factory in Shandong and stated annual capacity of 200,000 tons. It reports flexible, minor, full, sample-based, and design-based customization, supported by multiple processing and testing machines. Quality controls include written inspection instructions, raw-material traceability, complaint-handling procedures, and corrective-action procedures. However, it is explicitly not classified as a professional technical supplier, does not provide 3D software design services, has no supplier-management-system certification listed, and reports only one year of total R&D engineer experience. Financial records are identified for 2021–2023, but no performance values are provided. No customer cases are explicitly documented.
CertificationsThe supplier-management-system certification field is listed as “NIL,” so no certification holding is evidenced in the provided information.
R&D capabilityThe supplier is not identified as a professional technical supplier, does not provide 3D software design services, and reports total R&D engineer experience of only one year. These statements indicate limited evidenced innovation resources for technical design, although customization options are available.
Production capacityThe supplier operates four production lines, owns a calcined petroleum coke factory, and states annual production capacity of 200,000 tons. Its equipment includes grinding, cutting, permeability, bending/compression, particle-stability, and resistivity testing machines, providing direct evidence of manufacturing and testing capability.
Customization capabilityThe supplier explicitly offers flexible, minor, full, sample-based, and design-based customization. The same range is recorded under design-services capability, supporting a broad customization offering even though 3D software design is not provided.

Product Q&A

Q:What if my specification is not suitable?
A:
Please offer specific indicators by TM or email, and we will provide feedback as soon as possible.
Q:How long does it take to get a price quote?
A:
We usually quote within 24 hours after receiving detailed requirements like size and quantity. For urgent orders, you can call us directly.
Q:Do you provide samples?
A:
Yes, samples are available for quality checks. Delivery time is approximately 3-10 days.
Q:What is the lead time for mass production?
A:
Lead time is about 7-15 days based on quantity. For graphite products requiring dual-use items license, it takes 15-20 working days.
Q:What are your terms of delivery?
A:
We accept FOB, CFR, CIF, EXW, etc. You can also choose air transport or express shipping for urgent deliveries.

Send Inquiry

*To:Tianjin Eastmate Carbon Co., Ltd.Tianjin Eastmate Carbon Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like