Powered by Made-in-China.com
Base Flange Key Clamp Handrail System 132 C12 Kee Pipe Clamp Tub
US$2.40
100-199 Pieces
US$2.20
200-2,999 Pieces
US$1.50
3,000+ Pieces
Sample price:US$5.50/piece.Request sample
Product profile
Customization
AvailableStandard
DIN, ANSI, GB, JIS, BSWMaterial
IronModel NO.
Key ClampConnection
WeldingSurface Treatment
Galvanized SheetHead Type
RoundThread
Bsp/NPT,Perfect and Better to Connect.Type
Beaded End, Banded End, Plain End.Transport Package
as CustomziedSpecification
as CustomziedTrademark
EATHU / OEMOrigin
ShandongHS Code
73084000Production Capacity
100000piece/MonthKey features
Corrosion Resistance: Hot-dip galvanized surface treatment meeting ASTM A153 for anti-rust and corrosion protection.
Versatile Applications: Used for safety barriers and complex structures with quick and efficient assembly flexibility.
Customizable Threads: Thread options include BSP/NPT for perfect and better connection compatibility.
Proven Manufacturer: Established in 2004 with over 15 years of experience in production and export.
Quality Assurance: ISO-9001 certified with pre-production samples and final inspections before shipment.
Fast Delivery: Delivery time is 5-10 days for stock items and 15-20 days for non-stock items.
Wide Market Reach: Exporting to South America, North America, Mid East, Eastern Europe, Western Europe, and Africa.
Company profile
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 25 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤7.35h CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressNo. 5 Nanhai Branch Road, Shinan District, Qingdao, Shandong, China
Plant Area40 square meters
Registered Capital1,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity500
Supply Chain Partners50
Our Production Capability & Technical Expertise
Main ProductsForging Parts, Casting Parts, Lifting Anchor System, Metal OEM Parts, Precast Concrete Hardware, Pipe Fittings, Butterfly Valve, Forged Flange
R&D Engineers6 people
Our Industry Experience & Global Business Record
Year of Establishment2004-08-11
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff33
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:Who are we?
A:
We are based in Shandong, China, start from 2004,sell to South America(25.00%),North America(25.00%),Mid East(20.00%),Eastern Europe(20.00%),Western Europe(5.00%),Africa(5.00%). There are total about 1000+ people in our office.
Q:How can we guarantee quality?
A:
Always a pre-production sample before mass production; Always final Inspection before shipment;
Q:Are you trading company or manufacturer?
A:
We are factory.Due to the factory direct sales so we can offer the lowest price.
Q:Why should you buy from us not from other suppliers?
A:
Eathu Group is one of the biggest manufacturers and exporters of pipeline products in China. We specialize in pipeline products, and casting and forging products, we have more than 15years experience for production, quality control and export.
Q:How long is your delivery time?
A:
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Send Inquiry
*To:
Qingdao Eathu Import and Export Co., Ltd.
Qingdao Eathu Import and Export Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Malleable Iron Pipe Clamp Fittngs for Handrail System
US$0.50-5.50
1,000 Pieces(MOQ)
Key Clamp Fittings Pipe Clamp Easy Connection for Handrail System
US$1.00-10.00
100 Pieces(MOQ)
Galvanized Pipe Connector Key Clamp Handrail Fittings
US$0.50-5.50
1,000 Pieces(MOQ)
Malleable Iron Galvanized Pipe Clamps Key Clamps
US$0.50-5.50
1,000 Pieces(MOQ)
Galvanized Base Hose Malleable Cast Iron Tube Fittings Key Clamp Fittings Pipe Clamp
US$0.50-30.00
5,000 Pieces(MOQ)
Factory Supply Tube Clamps Key Pipe Clamps Fitting Building Handrail Bracket Joint
US$1.50-2.40
100 Pieces(MOQ)
Reliable Vibration Damping Metal Pipe Clamp for Plumbing Systems Pipe Clip
US$0.01-0.10
10 Pieces(MOQ)
Heavy-Duty Galvanized Kee Clamp for Reliable Pipe Connections
US$0.50-30.00
5,000 Pieces(MOQ)
Customized Temperature Resistant Metal Pipe Clamp for Fire Protection Systems
US$0.01-0.10
10 Pieces(MOQ)
Premium Vibration Damping Metal Pipe Clamp for Plumbing Clip Systems
US$0.01-0.10
10 Pieces(MOQ)
Corrosion-Resistant Temperature Resistant Split Pipe Clamp for Fire Protection Systems
US$0.01-0.10
10 Pieces(MOQ)
4 Inch Quick Release 304 Stainless Steel V-Band Exhaust Pipe Flanges Clamp
US$1.40-1.80
1,000 Pieces(MOQ)
Color Zinc Strut Clamp Anti-Seismic Pipe Clamp for Support System
US$0.10-0.87
1,000 Pieces(MOQ)
HDPE Water Pipe System Repair Clamp in Different Diameters
US$9.00-10.00
1 Piece(MOQ)
Strong Versatility American Type Stainless Steel Steel Pipe Clamp for Engine Exhaust Systems
US$0.03
5,000 Pieces(MOQ)
Heavy Duty Hydraulic Pipe Clamp for Sewage Systems
US$0.15
2,000 Pieces(MOQ)
HVAC System Ventilation Air Duct Ring Clamps Quick Release Rapid Lock Pipe Clamp 225mm
US$1.50-2.50
100 Pieces(MOQ)



















