Powered by Made-in-China.com
Fast-Set Gypsum Plaster Speeds up Brushed Leveling for Tight Construction Schedules
US$0.20-0.30
1,000 kg
Sample price:US$100.00/kg.Request sample
Product profile
Customization
AvailableAfter-sales Service
Technical Guide, Training and Onsite SupervisionWarranty
12 Months From The Date of ShipmentModel NO.
KLX500Material
GypsumColor
Light YellowChracteristics
Early StrengthHighlights
Fast HardeningAdvantage
LightweightStrengths
Excellent WorkabilityFeatures
High Bonding StrengthSuperiority
Debonding ResistantTraits
Crack-ResistantCertification
German Gev, French a+Voc Level
LowQualities
Eco-FriendlyODM Service
AvailableApplication Area
ConstructionTransport Package
Pallets in Containers by SeaSpecification
25 kg/BagTrademark
Eco-HomeOrigin
ChinaHS Code
3214109000Production Capacity
200, 000 Tons/YearCompany profile
Business Type: Manufacturer/FactoryNearest Port: Tianjin, China, Jintang, ChinaAverage Response Time: ≤2.01hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, FCA
AI-Powered supplier vetting
SummaryBeijing Eco-Home Group is an interior wall and construction-material supplier with more than 20 years of stated expertise, two intelligent manufacturing bases, automated production lines, and digital management systems. It provides 3D software design and broad customization services, reports new products within the past year, and states substantial annual capacities for wall putty, mortar, gypsum plaster, and waterproof coatings. Quality control includes six inspectors and standardized finished-product inspection instructions. Service procedures and complaint handling are documented, but supplier approval records and corrective-action records are incomplete. The company has inventory capability, international distribution, and some overseas training service in the United Arab Emirates, but no overseas warehouse, showroom, agent, or branch. Financial credibility cannot be assessed from the provided information because the relevant figures are excluded.
Supplier typeThe supplier is presented as a building-material manufacturer focused on interior wall substrates and related solutions, with two intelligent manufacturing bases, automated production lines, and international distribution. Its stated product and project references support classification as a manufacturing supplier rather than only a trading or service intermediary.
After-Sales capabilityThe supplier has written service-assessment procedures with records and a clear customer-complaint procedure with followed records. However, corrective-action records are absent, and the supplier has no overseas warehouse, showroom, agent, or branch; overseas support is limited to stated training in the United Arab Emirates.
R&D capabilityThe supplier reports new products within the past year, provides 3D software design services, and operates automated production lines under a digital management system. Its stated focus on continuous innovation and smart manufacturing further supports innovation capability, although no quantified R&D investment or patent evidence is provided.
Production capacityThe supplier reports two manufacturing bases, automated production lines, inventory capability, standardized finished-product inspection instructions, six quality inspectors, and stated annual capacities across several product categories. It also reports peak- and off-season lead times within 15 workdays, although the manufacturing-capacity contract status is unknown.
Customization capabilityThe supplier explicitly offers customization from samples, customization from designs, full customization, minor customization, flexible customization, and 3D software design services. These repeated statements provide direct evidence of broad customization capability.
Client casesThe supplier identifies the Beijing APEC Conference Center, Olympic Village, and National Stadium (Bird's Nest) as notable projects. These named project references provide explicit evidence of customer or project experience, although no scope, dates, or independently verifiable details are supplied.
Send Inquiry
*To:
Beijing Ecological Home Technology Group Co., Ltd.
Beijing Ecological Home Technology Group Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
High Strength Crack-Resistant White Natural Gypsum for Fast-Set Interior Plaster Base Usage
US$0.35-0.45
1,000 kg(MOQ)
White Natural Crack-Resistant Gypsum, Fast Forming and High Strength for Base Leveling
US$0.35-0.45
1,000 kg(MOQ)
Shock Resistant Thickened Gypsum Drywall Plasterboard for School Hospital Interior Construction
US$0.50-2.20
1,000 Square Meters(MOQ)
Waterproof PVC Gypsum Ceiling Board for Interior
US$0.18
1,000 Square Meters(MOQ)
Gypsum Joint Filler Offers Reliable Small-Area Leveling for Damaged Interior Wall Spots
US$0.25-0.30
25 kg(MOQ)
12mm Fireproof Partition Drywall Gypsum Plasterboard
US$0.50-2.20
1,000 Square Meters(MOQ)
Quick-Set Crack-Resistant White Natural Gypsum with High Strength for Mass Interior Projects
US$0.35-0.45
1,000 kg(MOQ)
Modern Style Standard Gypsum Plasterboards Waterproof Fireproof CE Certified
US$0.50-2.20
1,000 Square Meters(MOQ)
China Factory High Performance Gypsum Professional Grade Premium Drywall
US$0.65-1.90
1,000 Square Meters(MOQ)
First-Class Moistureproof Gypsum Plasterboard with Fireproof Feature and Paper Surface
US$0.50-2.20
1,000 Square Meters(MOQ)
Flexible China Factory High Performance Gypsum Professional Grade Premium Drywall
US$0.65-1.90
1,000 Square Meters(MOQ)
Interior Ornate Decoration Building Materials
US$15.00-40.00
50 Square Meters(MOQ)
100% Non-Asbestos Aesthetics Building Material
US$16.50-17.50
2,505 Square Meters(MOQ)
Exterior Wall Cladding Low Cost Commercial Building Materials
US$13.00
1,600 Square Meters(MOQ)
Protective Metal Edge Strip Building Material
US$1.00-3.00
500 Pieces(MOQ)
Metal Mosaic Building Material
US$15.00-40.00
50 Square Meters(MOQ)



















