SourcingAI
Try for free
Powered by Made-in-China.com
Compact Truck Mounted Concrete Boom Placing Pump with Stabilizer Legs
US$2,350.00
1-2 Sets
US$2,000.00
3-5 Sets
US$1,800.00
6+ Sets

Product profile

After-sales Service

1 Year

Warranty

1 Year

Type

Concrete Pump

Model NO.

YG-40

Shotcrete Type

Wet

Machining Process

Hydraulic

Structure

Cylinder Type

Productivity

5m³/H

Feeding Height

2500cm

Certification

ISO9001: 2000, CE

Condition

New

Color

Yellow

Model

Yg10 Electric

Motor

15kw

Voltage

380V, 50Hz, 3phase

Oil Pump

Shandong 40 Gear Pump

Tilt Cylinder

50

Assembly Hopper

Zhonglian Original Factory Accessories

Hopper Capacity

0.1m³

Weight

400kg

Diameter of Conveying Pipe

80

Maximum Aggregate Size

Within 2cm

Theoretical Conveying Capacity

5m³/H

Maximum Outlet Pressure

8MPa

Size

1800*800*1200mm

Fine Stones(Not Exceeding 1 Cm) Height/L

25/75m

Outlet

100mm

Transport Package

Wooden Case

Specification

1800*800*1200 mm

Trademark

YUGONG

Origin

China

Key features

High efficiency concrete placing pumping equipment machine
Hopper vibrator for continuous job site productivity
Durable wear resistant concrete pumping system unit
Stable hydraulic concrete conveying equipment system
Explosion proof certified mining concrete pump
High output concrete pumping system for infrastructure
Emission reduction fuel efficient concrete equipment
Low cost entry level concrete conveying machine
Crawler tracked self propelled mobile concrete pump
Smart industrial concrete pumping equipment unit

Company profile

Business Type: Manufacturer/FactoryAverage Response Time: ≤0.93h

About Our Factory & Business Background

AddressUnit 1698, Building 3, Shengang Industrial Park, South Side of The Road, 200 Meters West of The Intersection of Weidu Avenue and Kunwu Road, Puyang City, Puyang, Henan, China

Our Production Capability & Technical Expertise

Main ProductsSludge Cleaning Robot, Pile Driver, Mobile Crusher, RC Drilling Rig, Self Loading Concrete Mixer, Road Sweeper, Concrete Pump, Sweeper, Water Well Drilling Rig, Polyurethane Spraying Machine

Product Q&A

Q:What are the main types of concrete pumps and how do I choose one?
A:
There are two main types: boom pumps and trailer line pumps. Boom pumps have an articulating arm, ideal for high-rise buildings and wide-coverage job sites. Trailer pumps deliver concrete through ground-laid pipelines, reaching over 1,000 meters horizontally, perfect for obstacle-filled or confined spaces. The choice depends on your pouring height, site conditions, and budget.
Q:What mix design requirements are needed for pumpable concrete?
A:
Pumpable concrete must have good workability. Key controls: maximum aggregate size to pipe diameter ratio should not exceed 1:3, fine sand passing 0.315mm sieve should be at least 15%, and slump should be between 80-230mm. Poor mix design is a leading cause of blockages-always conduct trial mixes based on pumping height and pipe diameter
Q:What should I do when a pipe blockage occurs? How to quickly locate it?
A:
First, stop pumping immediately and perform forward-reverse pump cycles to try pulling concrete back into the hopper for remixing. If ineffective, tap the pipeline with a small hammer: a dull sound indicates the blockage point, while a crisp sound means normal flow. Blockages often occur at bends and tapered pipes. Once located, dismantle the pipe and clean it with high-pressure water or a heavy hammer before reinstalling
Q:Why is "priming the line" necessary before pumping? How is it done?
A:
Priming means pumping a layer of cement slurry or rich-mix concrete before the actual concrete pour, creating a lubricating layer on the pipe wall to reduce friction resistance. Procedure: pump the grout mixture through the line first, confirm it exits at the discharge end, then begin continuous concrete pumping. The priming slurry should be collected separately and not used for structural pouring.
Q:What if pumping is suddenly interrupted?
A:
For short interruptions (within 15-30 minutes), start the pump every 5-10 minutes and perform forward-reverse cycles to prevent initial setting inside the pipe. If interrupted for over 45 minutes, immediately dismantle and clean the pipeline, remove all concrete, re-prime, then resume pumping. Prolonged stoppage can cause concrete to set inside the pipe, leading to severe blockages or even pipe damage.

Send Inquiry

*To:Puyang Hongpu Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

37m Truck-Mounted Concrete Pump Hb37V with 37m Boom

37m Truck-Mounted Concrete Pump Hb37V with 37m Boom

US$108,000.00-130,000.00
1 Piece(MOQ)
Made-in-China.com
Hb48K 48m Truck Boom Mounted Concrete Pump with Best Price
Made-in-China.com