SourcingAI
Try for free
Powered by Made-in-China.com
Electric Photovoltaic Pile Driver for Urban Solar Project Construction
US$15,590.00
1-4 Sets
US$15,050.00
5-9 Sets
US$14,999.00
10+ Sets

Product specifications

model

Product profile

Customization

Available

After-sales Service

24-Hour Online Technical Support

Warranty

12 Months

Model NO.

YG

Type

Drill

Pressure Pile Driver Type

Hydraulic Pile Driver

Pile Hammer Type

Hydraulic Hammer

Power Source

Optional

Motor Power

Optional

Noise

Without Noise

Certification

EPA, CS, CE, RoHS, ISO 9001:2000, ISO 9001:2008

Condition

New

Service

24/7 Global Technical Support

Warranty Period

12 Months or 1000 Working Hours

Power Type

Hydraulic / Diesel / Electric Optional

Max Drilling Depth

3m-6m Standard Customizable

Max Drilling Diameter

150mm-350mm Adjustable

Control Mode

Manual / Semi-Automatic / Automatic Optional

Safety Certification

CE Industrial Safety Certification

Climbing Angle

Maximum Climbing Angle 30 Degree

Chassis Type

Crawler / Wheeled Mobile Optional

Transport Package

Ocean Freight

Specification

150mm-350mm Adjustable

Trademark

YG

Origin

China

HS Code

8430100000

Production Capacity

150mm-350mm Adjustable

Key features

5m maximum drilling depth, 250mm maximum drilling diameter, suitable for urban solar projects
380V/50Hz electric motor power, zero emission, low noise, suitable for urban construction
Electric control system, easy to operate, stable performance
Wheel mobile chassis, small size, easy to move on urban construction sites
CE certified safety system, emergency stop button, overload protection
High-strength steel welded frame, durable and long service life
Suitable for soil and soft rock layer pile driving
Compact design, small floor area, easy to store
Low maintenance cost, easy to install and maintain
12 months warranty and 24/7 global technical support

Company profile

Business Type: Manufacturer/FactoryExport Year: 2005-12-13Nearest Port: QingdaoAverage Response Time: ≤1.86hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CIF, DDP, CFR, DAT, FAS, DAP, CIP, CPT, FCA

About Our Factory & Business Background

AddressUnit 1698, Building 3, Shengang Industrial Park, at The Intersection of Weidu Avenue and Kunwu Road, Puyang City, Henan Province, Puyang, Henan, China
Registered Capital2,000,000 RMB
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsSludge Cleaning Robot, Pile Driver, Mobile Crusher, RC Drilling Rig, Self Loading Concrete Mixer, Road Sweeper, Concrete Pump, Sweeper, Water Well Drilling Rig, Polyurethane Spraying Machine

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the lead time for photovoltaic pile driver orders?
A:
Standard photovoltaic pile drivers can be shipped within 15-20 working days after receiving the 30% advance payment. Customized models with special pile driving depth, power or chassis requirements need 25-35 working days. Rush orders with priority production are available upon negotiation.
Q:Can the photovoltaic pile driver be customized for different geological conditions?
A:
Yes, we support full OEM/ODM customization. We can adjust the impact frequency, drilling depth, power system, and matching accessories (auger, DTH hammer) to adapt to soil, sand, and rock layer pile driving needs.
Q:What after-sales support do you provide for overseas customers?
A:
We offer 12 months or 1000 working hours warranty (whichever comes first), 24/7 global technical support, remote operation guidance, and original spare parts supply. We also provide on-site installation, commissioning, and operator training if needed.

Send Inquiry

*To:Puyang Hongpu Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Hydraulic Jzl90 Pile Driver for Construction Projects

Hydraulic Jzl90 Pile Driver for Construction Projects

US$165,000.00-170,000.00
1 Piece(MOQ)
Made-in-China.com
Jzl120 Pile Driver for Construction Projects

Jzl120 Pile Driver for Construction Projects

US$175,000.00-180,000.00
1 Piece(MOQ)
Made-in-China.com
Urban Hydraulic Pile Driver for Efficient Construction Projects
Made-in-China.com
Crawler Photovoltaic Pile Driver for Solar Farm

Crawler Photovoltaic Pile Driver for Solar Farm

US$14,200.00-14,600.00
1 Piece(MOQ)
Made-in-China.com