SourcingAI
Try for free
Powered by Made-in-China.com
Siemens Components Fully-Automatic Soybean Curd Processing Maker Machine with Low-Level Overflow Filling
US$6,000.00
1-4 Pieces
US$5,800.00
5+ Pieces

Product specifications

Specification

Product profile

Customization

Available

Application

Soy Products

Voltage

380V

Model NO.

CJDJ-18

Certification

ISO, CE, TUV, LFGB

Product Name

Cjdj-18 Fully Automatic Filled Tofu Machine

Key Words

Fully Automatic Filled Tofu Machine

Dimensions (L×W×H)

13000 × 700 × 2300 mm

Rated Power

1.5 Kw

Rated Voltage

3n-380V

Yield

2.5 - 3 Kg Tofu / 1 Kg Dry Soybeans

Control System

PLC Automation

Transport Package

Standard Packaging or Customized

Specification

Standard Specifications or Customized

Trademark

ENERGYOCO

Origin

Jiangsu, China

Production Capacity

500 Units/Year

Key features

High Production Capacity: Delivers 130-160 kg/h output with exceptional yield efficiency of 2.5-3 kg tofu per kg dry soybeans.
Advanced PLC Automation: Complete PLC control system manages the entire process from mixing to molding with precision.
Bubble-Free Texture: Innovative low-level overflow filling system eliminates air bubbles for smooth, uniform results.
Customizable Parameters: Adjustable mixing and coagulation times allow for different tofu varieties and specifications.
Automatic Metering: Accurately doses soy milk, GDL, and gypsum slurry for consistent quality and minimal waste.

Company profile

ENERGYCO LTD.
ENERGYCO LTD.Jiangsu, China
Business Type: Trading CompanyExport Year: 2019-12-19Average Response Time: ≤15h

About Our Factory & Business Background

AddressNo. 816, 99, Zhongshan Road, Nanjing, Jiangsu, China

Our Production Capability & Technical Expertise

Main ProductsBinding Machine, Banding Machine, Shredder, Money Counter, Alumina Ceramics, Cleaning Tools, Daily Necessities, Isolation Clothes, Coin Sorting Machine, Money Detector

Product Q&A

Q:What is the delivery logistics?
A:
We accept a variety of logistics methods. You can choose the most convenient or cost-effective way.
Q:What is the lead time for mass production?
A:
It depends on the order quantity and the season you place your order. The lead time of MOQ is about 15 to 20 days.
Q:Can you provide specific products not listed on the website?
A:
Yes, please tell us the product information, and we will search for you.
Q:When can I get a quote?
A:
We usually quote within 24 hours of receiving your inquiry. If you need a price very urgently, please call us via email so we can give priority to your inquiry.
Q:How can I get a sample to check your quality?
A:
After confirming the price, you can ask for samples to check our quality. If you need samples, we will charge a sample fee. But the sample fee can be refunded after you place an order later.

Send Inquiry

*To:ENERGYCO LTD.ENERGYCO LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like