SourcingAI
Try for free
Powered by Made-in-China.com
Customized Injection Molding Extrusion Production Type Flowerpot Mold for Home Office
US$2,000.00-2,500.00
1 Set

Product profile

Customization

Available

Warranty

1 Year

Shaping Mode

Injection Mould

Surface Finish Process

Polishing

Mould Cavity

Single Cavity

Plastic Material

PP, PE

Process Combination Type

Single-Process Mode

Application

Household Appliances, Furniture, Commodity, Electronic, Home Use

Runner

Hot Runner

Design Software

UG

Installation

Fixed

Certification

CE, ISO

Customized

Customized

After-sales Service

1 Year

Product Name

Plastic Mould

Product

Flowerpot Mold

Mold Ejection System

Push Plate and Valve

Injection Molding System

Hot Runner

Mold Features

Short Cooling Time, Fast Production Speed

Transport Package

Wooden Case

Specification

Customized

Trademark

ENJI

Origin

Zhejiang, China

HS Code

8480719090

Production Capacity

150 Pieces One Year

Key features

Customized Design Options: Offers full, minor, and flexible customization from samples or designs.
Short Cooling Time: CAE analysis optimizes cooling system for faster cycle and high output.
High Production Efficiency: Beryllium copper inlay speeds up cycle and improves production speed.
Stable Forming System: Reasonable flow design with German heating elements ensures stability.
High Precision Machining: Mold assembly precision and reasonable locking guide mechanism design.
Long Mold Life: Designed for 1 million cycles with high toughness and anti-aging.
CE and ISO Certified: Meets international safety and quality standards for reliability.
1 Year Warranty: Comprehensive warranty coverage for mechanical defects and parts.

Company profile

Taizhou Enji Mold Plastic Technology Co., Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceExhibition ExperienceOverseas Services
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 2 Years CertifiedNearest Port: Ningbo Port, Shanghai PortAverage Response Time: ≤15h

About Our Factory & Business Background

AddressTaizhou, Zhejiang, China
Plant Area268 square meters
Number of Employees12
Registered Capital660,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Minimum Order Quantity1
Supply Chain Partners15

Our Production Capability & Technical Expertise

Main ProductsPlastic Molds, Injection Molding Machine, Blow Molding Machine, Plastic Products
Production Lines1
Production MachinesMilling Machine, Drilling Machine, EDM Machine, Grinding Machine, Lathe
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2022-01-05
Main MarketsEurope, Southeast Asia/ Mideast, Africa, Domestic
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What customization options are available?
A:
We offer full customization, minor customization, and flexible customization based on your samples or designs.
Q:What is the expected mold life?
A:
The mold is designed for a long life of up to 1 million cycles with high toughness and anti-aging properties.
Q:What is the production cycle time?
A:
The mold cycle time is 18 seconds, achieved through optimized cooling systems and beryllium copper inlays.
Q:What materials are used for the mold?
A:
The mold is made of 718H material and uses PP and PE plastics for the final product.
Q:What is the lead time for production?
A:
The average lead time is 1-3 months, applicable for both peak and off-peak seasons.

Send Inquiry

*To:Taizhou Enji Mold Plastic Technology Co., Ltd.Taizhou Enji Mold Plastic Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like