SourcingAI
Try for free
Powered by Made-in-China.com
Double-Station Wax Injection Machine Is a Hot-Selling Model
US$18,500.00-19,500.00
1 Piece

Product profile

Customization

Available

Casting Method

Directional Crystallization

Process

Lost Wax Casting

Model NO.

YN-SMZ-16LB-YDD

Molding Technics

/

Application

Machinery Parts

Material

Carbon Steel

Surface Preparation

Spray-Paint

Surface Roughness

Ra0.1

Machining Tolerance

+/-0.02mm

Standard

GB

Certification

ISO 9001:2015

After-Sales Service

1years

Warranty

1years

Scope of Application

Investment Casting

Machinery Test Report

Provided

Video Outgoing-Inspection

Provided

Transport Package

Tray

Trademark

Enon

Origin

Made in China

HS Code

84543090

Production Capacity

500piece/Year

Key features

Precision Casting Capability: Directional crystallization casting with +/-0.02mm machining tolerance and Ra0.1 surface roughness.
High-Performance Components: Imported hydraulic and electrical components including Omron switches, Taiwan Delta PLC, and Japan NOK seals.
Flexible Injection Modes: Supports automatic, hand push single, or double modes with adjustable nozzle diameter from 6-9mm.
ISO 9001:2015 Certified: Manufacturing process strictly follows ISO 9001:2015 quality control standards with 100% visual inspection.
Customizable Solutions: ODM and OEM services available with customization options from customer designs.
Comprehensive After-Sales: 1-year warranty covering mechanical defects, with 24-hour online engineering guidance support.
Efficient Production Process: Wax-free cylinder design eliminates 24-hour incubation time, significantly shortening production cycles.

Company profile

Shandong Enon Automation Technology Co., Ltd
Importers and ExportersPatents AwardedExhibition ExperienceLow MOQ
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Designs CertifiedExport Year: 2 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤3.29h

About Our Factory & Business Background

Address300 Meters West of The Intersection of Xiwu Road and Shanting Road, Dongying District, Dongying, Shandong, China
Plant Area3208 square meters
Registered Capital3,000,000 RMB
Terms of PaymentLC, T/T, Western Union
International Commercial Terms(Incoterms)FOB
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners20

Our Production Capability & Technical Expertise

Main ProductsInvestment Casting Equipment, Investment Casting Material, Investment Casting Parts, Investment Casting Mould
Production Lines1
Production MachinesCutting Machine, Robot
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Main MarketsEurope
Repeat Buyers Choice< 10%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:How long can it be delivered after the order is placed?
A:
Most of our machines are customize ordered, they can be delivered within 30-60 days after the order is placed.
Q:How can I pay for the money for the machine.
A:
We accept 30% as a deposit and the balance need to be paid by T/T before the machine shipping out.
Q:Can I choose to buy equipment through Made-In-China company?
A:
If you buy our products for the first time, we will fully cooperate with your choice, and you can buy them in any way.
Q:Does the machine have an English manual and warranty card?
A:
Each machine has a professional English operation manual. The warranty period of our machine is one year, except for human factors or wearing parts. In addition, we can provide electronic version of the English manual.
Q:The delivery time of products without stock is too long for 30-60 days.
A:
First of all, we will speed production to meet your needs. In addition, the long delivery time is because our technicians need to carefully check and debug the equipment to ensure the quality of the machine.

Send Inquiry

*To:Shandong Enon Automation Technology Co., LtdShandong Enon Automation Technology Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Double Station Injection Wax Machine Cylinder Can Be Changed
Made-in-China.com
The Speed's About 3-8 Ml / S Wax Injection Machine Hot Sell
Made-in-China.com
Ds Wax Injection Casting Special Use Machine with TUV
Made-in-China.com