SourcingAI
Try for free
Powered by Made-in-China.com
Star Product Steam Dewaxing Machine for The Mold Shell Dewaxing Cauldron Sell
US$16,880.00-22,570.00
1 Piece

Product profile

Customization

Available

Casting Method

Directional Crystallization

Process

Lost Wax Casting

Model NO.

YN-DTF-1000Z

Molding Technics

/

Application

Machinery Parts

Material

Carbon Steel

Surface Preparation

Spray-Paint

Surface Roughness

Ra6.3

Machining Tolerance

+/-0.02mm

Standard

GB

Certification

ISO 9001:2015

After-Sales Service

1years

Warranty

1years

Advantages

Long Lifespan

Feature

Easy to Operate

Transport Package

Tray

Trademark

Enon

Origin

China

HS Code

8419899090

Production Capacity

500piece

Key features

Double-Layer Pressure Vessel: Ensures fast heat balance, prevents shell cracking, and saves high-temperature steam.
Advanced Safety Interlock: Door cannot open if exhaust valve is closed; prevents dry burning with water shortage protection.
Rapid Temperature Rise: Features fast dewaxing capabilities with high thermal efficiency and low wax moisture content.
Complete Precision Casting Equipment: Ideal for dewaxing precision casting middle mold shells with easy operation.
Comprehensive Safety Features: Equipped with safety valve, temperature alarm, pressure gauge, and intake/exhaust valves.
ISO 9001:2015 Certified: Manufactured under strict quality control systems ensuring high reliability and standards.
Customizable from Designs: ODM and OEM services available to meet specific customer design requirements.
1-Year Warranty Coverage: Covers mechanical defects for one year, excluding human factors or wearing parts.

Company profile

Shandong Enon Automation Technology Co., Ltd
Importers and ExportersPatents AwardedExhibition ExperienceLow MOQ
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Designs CertifiedExport Year: 2 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤5.30h

About Our Factory & Business Background

Address300 Meters West of The Intersection of Xiwu Road and Shanting Road, Dongying District, Dongying, Shandong, China
Plant Area3208 square meters
Registered Capital3,000,000 RMB
Terms of PaymentLC, T/T, Western Union
International Commercial Terms(Incoterms)FOB
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners20

Our Production Capability & Technical Expertise

Main ProductsInvestment Casting Equipment, Investment Casting Material, Investment Casting Parts, Investment Casting Mould
Production Lines1
Production MachinesCutting Machine, Robot
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Main MarketsEurope
Repeat Buyers Choice< 10%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:How long can it be delivered after the order is placed?
A:
Most of our machines are customize ordered, they can be delivered within 30-60 days after the order is placed
Q:How can I pay for the money for the machine.
A:
We accept 30% as a deposit and the balance need to be paid by T/T before the machine shipping out.
Q:Can I choose to buy equipment through Made-In-China company?
A:
If you buy our products for the first time, we will fully cooperate with your choice, and you can buy them in any way.
Q:Does the machine have an English manual and warranty card?
A:
Each machine has a professional English operation manual. The warranty period of our machine is one year, except for human factors or wearing parts. In addition, we can provide electronic version of the English manual.
Q:The delivery time of products without stock is too long for 30-60 days.
A:
First of all, we will speed production to meet your needs. In addition, the long delivery time is because our technicians need to carefully check and debug the equipment to ensure the quality of the machine.

Send Inquiry

*To:Shandong Enon Automation Technology Co., LtdShandong Enon Automation Technology Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Dewaxing Machine for The Mold Shell Dewaxing Autoclave
Made-in-China.com
Casting Machine Wax Injection for Accessory Investment Casting
Made-in-China.com
Steam Dewaxing Machine for Mold Shell Dewaxing Pot

Steam Dewaxing Machine for Mold Shell Dewaxing Pot

US$16,880.00-22,570.00
1 Piece(MOQ)
Made-in-China.com
Dewaxing Machine for The Mold Shell Dewaxing Autoclave Sell
Made-in-China.com
Chinese Equipment Pattern Wax Injection Machine for Casting
Made-in-China.com