Powered by Made-in-China.com
Large Diameter Buried LSAW Pipeline Adopts Three-Layer Polyethylene Coated Steel Pipe
US$200.00
1-199 Tons
US$150.00
200+ Tons
Sample price:US$1000.00/kg.Request sample
Product profile
Customization
AvailableAfter-sales Service
Overseas Installation,Free Technical ServiceWarranty
12mouthsModel NO.
DN50-DN1000Type
Corrosion ProtectionTechnique
Corrosion ProtectionMaterial
Carbon SteelSurface Treatment
AntisepticalUsage
Pipeline Transport, Boiler Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Special PurposeSection Shape
RoundCoating Type
3PE/ 3lpe Anti-CorrosionLength
6m, 9m, 12m or CuetomizedSurface Preparation
SA2.5 Sand BlastingMinimum Coating
1.8-3.7mmTransport Package
Standard Package for ExportSpecification
DN50-DN1000Trademark
jindaoOrigin
Dongying, Shandong, ChinaHS Code
7304193000Production Capacity
50000Key features
Three-layer polyethylene (3PE) composite anti-corrosion structure. The FBE epoxy powder base layer delivers strong adhesion and excellent cathodic disbondment resistance, effectively protecting agains
Every pipe is 100% gauge-tested for coating thickness and spark-tested for pinholes before delivery, with inspection reports issued to GB/T 23257 requirements.
Three fused layers give high impact and abrasion resistance, and the dense PE coat keeps water out for decades underground.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Designs, Full Customization CertifiedExport Year: The company currently has no direct export orders CertifiedNearest Port: Tianjin Port CertifiedTerms of Payment: LC, T/T, PayPal, etc.
About Our Factory & Business Background
AddressDongying, Shandong, China
Plant Area152810 square meters
Number of Employees141
Registered Capital120,000,000 RMB
International Commercial Terms(Incoterms)EXW, CFR, CIF, FOB
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity5 pieces
Supply Chain Partners50
Our Production Capability & Technical Expertise
Main ProductsAnticorrosion and Thermal Insulation Pipe
Production Lines31
Production MachinesStainless Steel Lined Pipeline Production Line, 3PE Pipe Production Line, Welding Machine, Chuck Type Intelligent Automatic Welding Machine, Five Axis Intersecting Line Cutting Robot, Insulation Production Line
QA/QC inspectors6 people
Inspection Type for Finished ProductsRandom inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers5 people
Traceability of Raw MaterialsYes
Test Reports for Raw MaterialsOthers
Our Industry Experience & Global Business Record
Year of Establishment2007-01-19
Main MarketsDomestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO45001:2018, ISO9001:2015, ISO14001, Others
Cooperated with Fortune 500Yes
Product Q&A
Q:How do you ensure product quality?
A:
We have established a comprehensive and strict quality control system for all 3PE anti-corrosion products. Firstly, all raw materials are subject to strict inspection to ensure the quality of base materials. During production, full-process monitoring is implemented for heat treatment and polyethylene coating procedures. After production, every product undergoes thickness inspection, non-destructive testing and dimensional inspection. Complete quality inspection documents and test reports can be
Q:Can you customize 3PE anti-corrosive pipes?
A:
Yes, full customization is available. We support custom pipe diameter DN50-DN4200, wall thickness 1.8mm-3.7mm, length 6m-12m or non-standard size.
Q:How do you guarantee product quality
A:
We conduct strict full-process quality control, including raw material inspection, steel surface derusting up to SA2.5 grade and coating process supervision. Finished pipes pass coating thickness detection and spark detection (holiday detection). Complete quality test reports are provided for each batch.
Q:What is the service life of 3PE anti-corrosive pipe?
A:
Under standard buried working conditions, the service life can reach 30-50 years. The integrated anti-corrosion structure effectively avoids pipeline rust, leakage and aging problems.
Send Inquiry
*To:Shengli Oilfield Jindao Engineering Installation Co., Ltd.
*Content:
Supplier replies will be sent to your registered email
You may also like
Large Diameter LSAW Steel Pipe 3PE Coated for Oil and Gas Pipeline
US$500.00-600.00
25 Tons(MOQ)
Buried Alloy Steel Pipe Adopts HDPE Polyethylene Cladding Layer
US$150.00-200.00
1 Ton(MOQ)
Long Distance X80 Gas Pipeline Uses Three-Layer Polyethylene Coated Steel Pipe
US$150.00-200.00
1 Ton(MOQ)
Od711.0×17.5mm Fbe Internal Coated Pipe for Large Diameter Buried Line
US$150.00-200.00
1 Ton(MOQ)
Large Diameter Steel Pipe Uses Three Layer Polyethylene Coating
US$150.00-200.00
1 Ton(MOQ)
Q235B/Q355b Pipe 3lpe Three-Layer Polyethylene Coated Spiral Pipe
US$100.00
1 Piece(MOQ)
Dhpi Large Diameter Steel Pipe with Epoxy Coated 3PE DN200-3600mm
US$2.20-2.50
100 Meters(MOQ)
Welded Steel Pipe Coated with Three Layer Polyethylene for Underground Buried Pipelines
US$1,290.00-2,890.00
1 Ton(MOQ)
En 10216-5 304 1.4301 SUS304 Sch40 LSAW Stainless Steel Pipe for Large Diameter Pipeline Systems
US$2,459.00-2,499.00
1 Ton(MOQ)
1200mm Large Diameter Sch80 SSAW LSAW Pipe for Pipeline Construction
US$500.00-600.00
5 Tons(MOQ)



















