Powered by Made-in-China.com
Oil Field Gathering Pipeline Uses Two-Step Method Polyurethane Prefabricated Direct-Buried Insulation Pipe
US$200.00
1-199 Tons
US$150.00
200+ Tons
Sample price:US$1000.00/kg.Request sample
Product profile
Customization
AvailableAfter-sales Service
Overseas Installation,Free Technical ServiceWarranty
12mouthsModel NO.
DN15-DN500Type
Insulation PipeTechnique
Insulation PipeMaterial
Carbon SteelSurface Treatment
AntisepticalUsage
Pipeline Transport, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Special PurposeSection Shape
RoundTechnological
Two Step MethodAge
30-50 YearPipe Type
Seamless/Spiral Welded/Straight Seam Welded PipeAdvantages
Technical MaturityTransport Package
Standard Package for ExportSpecification
DN15-DN500Trademark
jindaoOrigin
Dongying, Shandong, ChinaHS Code
7304193000Production Capacity
50000Key features
The two-step method has a relatively mature production process, ensuring stable and reliable product quality.
The rigid polyurethane foam with a density between 60kg/m3 and 80kg/m3provides excellent thermal insulation performance.
The materials have a certain bonding strength, ensuring that the steel pipe, outer sleeve and thermal insulation layer form a solid whole.
Suitable for thermal insulation and cold preservation projects in heat supply, cooling, hot oil transportation, chemical industry and other industries.
The high-density polyethylene outer protective layer protects the insulation layer from mechanical hard objects and provides anti-corrosion and waterproof performance.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Designs, Full Customization CertifiedExport Year: The company currently has no direct export orders CertifiedNearest Port: Tianjin Port CertifiedTerms of Payment: LC, T/T, PayPal, etc.
About Our Factory & Business Background
AddressDongying, Shandong, China
Plant Area152810 square meters
Number of Employees141
Registered Capital120,000,000 RMB
International Commercial Terms(Incoterms)EXW, CFR, CIF, FOB
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity5 pieces
Supply Chain Partners50
Our Production Capability & Technical Expertise
Main ProductsAnticorrosion and Thermal Insulation Pipe
Production Lines31
Production MachinesStainless Steel Lined Pipeline Production Line, 3PE Pipe Production Line, Welding Machine, Chuck Type Intelligent Automatic Welding Machine, Five Axis Intersecting Line Cutting Robot, Insulation Production Line
QA/QC inspectors6 people
Inspection Type for Finished ProductsRandom inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers5 people
Traceability of Raw MaterialsYes
Test Reports for Raw MaterialsOthers
Our Industry Experience & Global Business Record
Year of Establishment2007-01-19
Main MarketsDomestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO45001:2018, ISO9001:2015, ISO14001, Others
Cooperated with Fortune 500Yes
Product Q&A
Q:What is the processing range of your two-step method insulation pipe?
A:
The processing range of our two-step method polyurethane prefabricated direct-buried insulation pipe is DN15mm-DN500. This wide range covers most common pipe diameters used in district heating, cooling, hot oil transportation and chemical industry projects. For special diameters outside this range, please contact us for further discussion.
Q:What is the thickness of the HDPE outer protective layer? Can it be customized?
A:
The thickness of the high-density polyethylene outer protective layer can be customized according to your project requirements. The typical thickness ranges from 2mm to 10mm, depending on the pipe diameter, burial depth, soil conditions and mechanical protection requirements. The HDPE outer protective layer plays a key role in protecting the polyurethane insulation layer from mechanical damage and providing anti-corrosion and waterproof performance.
Q:Can you provide pipe fittings such as elbows, tees, reducers and flange joints?
A:
Yes, we can provide various pre-insulated pipe fittings including elbows, tees, reducers, flange joints and fixed supports. These fittings are also produced with the same three-layer structure: working steel pipe, polyurethane insulation layer and HDPE outer protective layer. The fittings can be customized according to your pipeline design and installation requirements. Please provide your fitting drawings or specifications for accurate production.
Q:Do you provide installation guidance or technical support?
A:
Yes, we can provide installation instructions, technical drawings and online technical support. For large projects, we can also arrange engineers to provide on-site installation guidance if required. Our technical team can assist you with pipe laying, joint insulation, leak detection and system commissioning. Please contact us for more details about our technical support services.
Send Inquiry
*To:
Shengli Oilfield Jindao Engineering Installation Co., Ltd.
Shengli Oilfield Jindao Engineering Installation Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Chemical Plant Hot Oil Pipeline Carries Two-Step Polyurethane Foam Insulation Steel Pipe
US$150.00-200.00
1 Ton(MOQ)
High Temperature Chemical Pipeline Uses Prefabricated Direct-Buried Polyurethane Insulation Pipe
US$150.00-200.00
1 Ton(MOQ)
ASTM A53 Sch80 DN150 Oil Pipeline Industrial Use High Pressure Carbon Steel Welded Pipe
US$479.00-499.00
1 Ton(MOQ)
ERW Welded Steel Pipe for Oil and Gas Gathering
US$580.00-650.00
25 Tons(MOQ)
Galvanized Round Pipe for Oil and Gas Pipeline Auxiliary Facilities Use
US$700.00-900.00
1 Ton(MOQ)
St37-2 Carbon Steel Welded Pipe High Quality Building Water Drainage Use
US$480.00-550.00
10 Tons(MOQ)
Oil and Gas Pipeline Construction Use PE Coating Anti-Corrosion Carbon Steel Pipe
US$500.00-600.00
10 Tons(MOQ)
Galvanized Welded Round Pipe DIN 2440 Standard for Oil Pipeline & Structural Use
US$390.00-400.00
1 Ton(MOQ)
Gas Drainage Matched Oil Well Casing Drill Pipe Gas Gathering Well Pipeline
US$485.00-780.00
10 Tons(MOQ)
ASTM A262 A105 A53 ERW CS Steel Pipe and Tube for Oil and Water Field Steel Pipe and Tube
US$520.00-749.00
25 Tons(MOQ)
Standard Grade A53 Gr. B Round Steel Pipe for Small Scale Oil Field Pipeline Works
US$500.00
30 Pieces(MOQ)
High-Quality 2-Inch API 5L Carbon Steel Lasw Pipe for Industrial Use
US$490.00
5 Tons(MOQ)



















