SourcingAI
Try for free
Powered by Made-in-China.com
Two-Step Method Polyurethane Prefabricated Direct-Buried Insulation Pipe for SSAW Oil Delivery Network
US$200.00
1-199 Tons
US$150.00
200+ Tons
Sample price:US$1000.00/kg.Request sample

Product profile

Customization

Available

After-sales Service

Overseas Installation,Free Technical Service

Warranty

12mouths

Model NO.

DN15-DN500

Type

Insulation Pipe

Technique

Insulation Pipe

Material

Carbon Steel

Surface Treatment

Antiseptical

Usage

Pipeline Transport, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Special Purpose

Section Shape

Round

Technological

Two Step Method

Age

30-50 Year

Pipe Type

Seamless/Spiral Welded/Straight Seam Welded Pipe

Advantages

Technical Maturity

Transport Package

Standard Package for Export

Specification

DN15-DN500

Trademark

jindao

Origin

Dongying, Shandong, China

HS Code

7304193000

Production Capacity

50000

Key features

The two-step method has a relatively mature production process, ensuring stable and reliable product quality.
The rigid polyurethane foam with a density between 60kg/m3 and 80kg/m3provides excellent thermal insulation performance.
The materials have a certain bonding strength, ensuring that the steel pipe, outer sleeve and thermal insulation layer form a solid whole.
Suitable for thermal insulation and cold preservation projects in heat supply, cooling, hot oil transportation, chemical industry and other industries.
The high-density polyethylene outer protective layer protects the insulation layer from mechanical hard objects and provides anti-corrosion and waterproof performance.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Designs, Full Customization CertifiedExport Year: The company currently has no direct export orders CertifiedNearest Port: Tianjin Port CertifiedTerms of Payment: LC, T/T, PayPal, etc.

About Our Factory & Business Background

AddressDongying, Shandong, China
Plant Area152810 square meters
Number of Employees141
Registered Capital120,000,000 RMB
International Commercial Terms(Incoterms)EXW, CFR, CIF, FOB
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity5 pieces
Supply Chain Partners50

Our Production Capability & Technical Expertise

Main ProductsAnticorrosion and Thermal Insulation Pipe
Production Lines31
Production MachinesStainless Steel Lined Pipeline Production Line, 3PE Pipe Production Line, Welding Machine, Chuck Type Intelligent Automatic Welding Machine, Five Axis Intersecting Line Cutting Robot, Insulation Production Line
QA/QC inspectors6 people
Inspection Type for Finished ProductsRandom inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers5 people
Traceability of Raw MaterialsYes
Test Reports for Raw MaterialsOthers

Our Industry Experience & Global Business Record

Year of Establishment2007-01-19
Main MarketsDomestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO45001:2018, ISO9001:2015, ISO14001, Others
Cooperated with Fortune 500Yes

Product Q&A

Q:What is the processing range of your two-step method insulation pipe?
A:
The processing range of our two-step method polyurethane prefabricated direct-buried insulation pipe is DN15mm-DN500. This wide range covers most common pipe diameters used in district heating, cooling, hot oil transportation and chemical industry projects. For special diameters outside this range, please contact us for further discussion.
Q:What is the thickness of the HDPE outer protective layer? Can it be customized?
A:
The thickness of the high-density polyethylene outer protective layer can be customized according to your project requirements. The typical thickness ranges from 2mm to 10mm, depending on the pipe diameter, burial depth, soil conditions and mechanical protection requirements. The HDPE outer protective layer plays a key role in protecting the polyurethane insulation layer from mechanical damage and providing anti-corrosion and waterproof performance.
Q:Can you provide pipe fittings such as elbows, tees, reducers and flange joints?
A:
Yes, we can provide various pre-insulated pipe fittings including elbows, tees, reducers, flange joints and fixed supports. These fittings are also produced with the same three-layer structure: working steel pipe, polyurethane insulation layer and HDPE outer protective layer. The fittings can be customized according to your pipeline design and installation requirements. Please provide your fitting drawings or specifications for accurate production.
Q:Do you provide installation guidance or technical support?
A:
Yes, we can provide installation instructions, technical drawings and online technical support. For large projects, we can also arrange engineers to provide on-site installation guidance if required. Our technical team can assist you with pipe laying, joint insulation, leak detection and system commissioning. Please contact us for more details about our technical support services.

Send Inquiry

*To:Shengli Oilfield Jindao Engineering Installation Co., Ltd.Shengli Oilfield Jindao Engineering Installation Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

En10025-2 S355jr SSAW Pipe for Marine Piling
Made-in-China.com
ASTM A252 Gr. 2 SSAW Pipe for Foundation Piling
Made-in-China.com