SourcingAI
Try for free
Powered by Made-in-China.com
10-500kVA 400V 50Hz Three Phase Online UPS for Server Room Backup
US$1,880.00
1 Piece

Product specifications

Capacity

Sample price:US$10609.00/piece.Request sample

Product profile

Customization

Available

Phase

Three Phase

Type

On-line

Model NO.

T3000-150KVA-400V-50HZ-01

Protection

Overload,Short,Ov,UV,Oc,Low Battery,Phase Loss

Application

Industry

Classification

Lighting/Power

Standby Time

Long-acting Machine

Output Capacity

Large Type

Rated Capacity

150kVA / 120kw

Input / Output Voltage

400V / 400V, Three-Phase, 50Hz

Output Power Factor

0.8 Standard; 1.0 Customized Option

Battery Options

External Lead-Acid / LiFePO4 Packages

Backup Runtime

Configured to Load and Battery Capacity

UPS Architecture

Online Double-Conversion, Low-Frequency

Transport Package

Export Wooden Case

Specification

10-500kVA; 150kVA/120kW; 400V 3Phase, 50Hz

Origin

Shenzhen, Guangdong, China

HS Code

8504402000

Production Capacity

1000 Units

Key features

150kVA / 120kW at 0.8 output power factor; three-phase input and output.
400V input and 400V output, 50Hz; other three-phase voltages configured to the order.
External lead-acid or LiFePO4 battery packages available, sized to your load and backup time.
Online double-conversion power path with a low-frequency output isolation transformer for industrial loads.
Factory-built UPS with our own workshop; assembly, inspection and export packing can be reviewed before shipment.
LCD status display and audible/visual alarms help operators check operating conditions and faults.
Static bypass and maintenance bypass support planned service and load transfer under suitable conditions.
Overload, short-circuit, overvoltage, undervoltage, overcurrent, low-battery and phase-loss protection.
Front-access cabinet design, terminal-block wiring and forced-air cooling support installation and service.
Optional monitoring interfaces and parallel systems are configured to the approved project requirements.

Company profile

Shenzhen Feixiangda Electronic Co., Ltd.
High Repeat Buyers ChoiceLow MOQ100% Finished Products InspectionProduct Certification
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 19 Years CertifiedNearest Port: Shenzhen PortAverage Response Time: ≤0.03h

About Our Factory & Business Background

AddressBuilding 2, No. 49, Fenghuang 2nd Road, Humen Town, Dongguan, Guangdong, China
Plant Area5000 square meters
Number of Employees59
Registered Capital5,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Piece
Supply Chain Partners12

Our Production Capability & Technical Expertise

Main ProductsLow Frequency UPS, High Frequency UPS, AC Voltage Stabilizer AVR, Dry Type Transformer, Stabilizer Transformer Integrated Unit, Variable Frequency Power Supply, Voltage Regulator, Oil Immersed Voltage Stabilizer
Production Lines4
Production MachinesCutter, Bending Machine, Welding machine, Winding machine
QA/QC inspectors2 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers3 people
Traceability of Raw MaterialsNo
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2006-12-12
Main MarketsDomestic
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff4
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Product CertificationCE
Cooperated with Fortune 500No

Product Q&A

Q:Are you a manufacturer, and can we review your workshop and production process?
A:
Yes. Shenzhen Feixiangda Electronic Co., Ltd. supplies industrial power equipment with its own workshop. We can discuss OEM/ODM requirements and provide product-specific assembly, inspection and packing information. Please tell us the capacity, voltage, destination and any inspection requirements so we can prepare the right project documentation.
Q:Does 150kVA mean 150kW, and how should I size the UPS for my load?
A:
This configuration is 150kVA / 120kW at an output power factor of 0.8. Selection must consider both kVA and kW, starting current, nonlinear loads, future expansion and the required redundancy. The calculated rated output line current is about 216.5A at 400V under balanced three-phase loading. Share your equipment list and operating load; this figure is not a maximum input-current or cable-sizing value. PF1.0 versions can be quoted separately.
Q:Is this a low-frequency online UPS, and what does the transformer do?
A:
The series uses online double-conversion technology with a low-frequency output isolation transformer. In normal operation the rectifier supplies the DC link and the inverter powers the load; the matched battery supports the DC link during a mains failure. Transformer-based construction suits many industrial applications. Starting demand and load compatibility must be reviewed for your equipment.
Q:Can you supply 380V, 400V, 415V or other three-phase voltages?
A:
The product featured here is configured for 400V three-phase input and 400V three-phase output. Other three-phase input/output voltages can be customized for the destination. Tell us the required line-to-line voltage, 50Hz or 60Hz supply, neutral/earthing arrangement and load type. Each ordered UPS is built for its approved configuration; the listed 400V unit is not automatically a selectable multi-voltage unit.
Q:Can you supply the UPS together with batteries for 30 minutes or longer?
A:
Yes. We can quote a matched external lead-acid or LiFePO4 battery package. Options can be designed for controlled shutdown of around 10-15 minutes, around 30 minutes, or a requested 1-3 hours. Runtime depends on actual load, battery capacity, DC configuration, discharge conditions and aging allowance. We check charger compatibility and, for lithium batteries, the BMS and protection arrangement. Send the actual load in kW and required runtime.

Send Inquiry

*To:Shenzhen Feixiangda Electronic Co., Ltd.Shenzhen Feixiangda Electronic Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

2kVA Single Phase Rack Mount UPS Sr2K for Server Room
Made-in-China.com
E3sp30kh Easy 3s PRO UPS 30kVA 400V 3 Phase Online UPS
Made-in-China.com