SourcingAI
Try for free
Powered by Made-in-China.com
Premium Quality Low Noise 110kv on Load Power Transformer for Transmission Grid
US$117,520.00-514,150.00
1 Piece

Product specifications

Rated Capacity

Product profile

Customization

Available

Application

Power

Phase

Three

Model NO.

SSZ20-Rated

Core

Core-type Transformer

Cooling Method

Oil-immersed Type Transformer

Winding Type

Two-winding Transformer

Usage

Power Transformer

Frequency Characteristics

Power Frequency

Brand

Fulin

Rated Capacity

50mva,40mva,31.5mva

Performance

High-Performance

Loss

Low-Loss

Power

110kv

Transport Package

Main Unit: Film-Wrapped or Bare-Packed

Specification

Refer to the Product Details Table

Trademark

Fulin

Origin

China

Key features

Low Loss Performance: Optimized core structure reduces no-load and load loss for energy saving.
Oil-Immersed Cooling: Efficient heat dissipation ensures stable operation under heavy loads.
High Mechanical Stability: Robust frame and windings resist deformation during short-circuit events.
110kV Voltage Rating: Designed for high-performance power transmission and distribution networks.
One-Year Warranty: Comprehensive coverage for mechanical defects and performance issues.
Customization Available: Products can be customized to fit specific grid operating environments.
Fast Delivery: Standard products delivered within 15 to 30 days.
Professional Manufacturer: 30 years of expertise with 20 R&D engineers and 100% inspection.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 24 years CertifiedNearest Port: Dalian Port CertifiedTerms of Payment: PayPal, D/P, T/T, etc.

About Our Factory & Business Background

AddressNo. 70-1, Qingzhou Street, Sujiatun District, Shenyang City, Liaoning Province, P. R. China, Shenyang, Liaoning, China
Plant Area6053.5 square meters
Number of Employees235
Registered Capital100,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month
Minimum Order Quantity1set
Supply Chain Partners35

Our Production Capability & Technical Expertise

Main ProductsPower Transformer, Distribution Transformer, Dry-Type Transformer, Box-Type Substation, High and Low Voltage Switchgear
Production Lines4
Production MachinesIron Core Stacking Flip Table, Speed Controlled Winding Machine
QA/QC inspectors6 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers20 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2003-02-24
Main MarketsDomestic
Repeat Buyers Choice< 10%
Number of Foreign Trading Staff20
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO45001:2018, ISO14001, ISO50001
Product CertificationCE, Others
Cooperated with Fortune 500No

Product Q&A

Q:What is your warranty period?
A:
We offer a one-year warranty.
Q:Why should you buy from us instead of other suppliers?
A:
Over 30 years of design and manufacturing expertise. As a cooperative supplier of State Grid Corporation of China, we boast rich experience and have won high reputation worldwide. High quality, fast delivery, reliable after-sales service.
Q:What is your delivery lead time?
A:
Standard products are normally delivered within 15 to 30 days. Customized solutions or large project orders may take 45 to 90 days, depending on the complexity.
Q:Do you offer OEM and ODM customization services?
A:
Yes. We can customize the products according to your specific grid operating environment and technical requirements.
Q:What are your terms of payment?
A:
T/T: 50% advance, 50% balance before shipment. L/C: 30% advance, 60% against shipping documents, 10% balance against quality bond.

Send Inquiry

*To:Shenyang Fulin Special Transformer Co., Ltd.Shenyang Fulin Special Transformer Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like