Powered by Made-in-China.com

Reliable Dry Cooler Solution for Large Scale Data Center Construction
US$10,000.00
1-4 Sets
US$9,980.00
5-9 Sets
US$9,970.00
10-19 Sets
US$9,950.00
20+ Sets
Sample price:US$10000.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
YesWarranty
1-10Type
Air-CooledSystem Type
Closed SystemFans Species
Frequency FanNoise Level
LowApplication Fields
Ai Data Center Nuclear Power StationCertification
RoHS, UR, ISO, CE, CCCCondition
NewTransport Package
40hqSpecification
2580x1260x2060Trademark
YUANDINGOrigin
ChinaProduction Capacity
100000Key features
Modular design flexible capacity expansion to meet large cooling demands
High speed axial fans deliver excellent heat dissipation performance
Compact integrated layout saves installation space for rooftop projects
Company profile
Business Type: Manufacturer/Factory, Trading CompanyAverage Response Time: ≤0.03h
About Our Factory & Business Background
AddressUnit 702, Building 1, Ginza, New Wing, No. 61 Guizhou Avenue Middle, Hongxing Community, Ronggui Street, Shunde District, Foshan
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsIce Bath, Mini Heat Pump, Chiller, Ice Bath Chiller, Portable Ice Bath, Swimming Pool Heat Pump, Pool Heat Pump, Plate Heat Exchanger, Heat Exchangers, Sheet Metal Casing
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the difference between a dry cooler and a cooling tower
A:
Dry cooler uses air for heat exchange without water evaporation to save water resources
Q:Can this dry cooler run without cooling water
A:
Yes it adopts dry air-cooling mode and no extra water tank is needed
Q:What applications is the dry cooler suitable for
A:
It is widely used in data centers industrial equipment and fluid cooling systems
Send Inquiry
*To:
Foshan Yuanding Energy Technology Co., Ltd.
Foshan Yuanding Energy Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Combined Modular Dry Cooler Multi Unit Dry Air Cooler for Large Data Center Liquid Cooling
US$3,599.00-3,899.00
1 Piece(MOQ)
3000kw Double-Row Fin Dry Cooler for Large-Scale Data Center
US$2,899.00-3,999.00
1 Piece(MOQ)
UL Certified Adiabatic Dry Fluid Cooler for Ai Data Center Cooling Solutions
US$4,012.00-5,000.00
1 Piece(MOQ)
Large Capacity Dry Cooler Air Cooled Heat Exchanger for Data Center Cooling System
US$3,599.00-3,899.00
1 Piece(MOQ)
V-Type Dry Cooler for Data Center Cooling Solutions
US$3,260.00-3,306.00
1 Piece(MOQ)
UL Certified 1200kw Adiabatic Dry Air Cooler for Ai Data Center
US$4,000.00-5,000.00
1 Piece(MOQ)
UL Certified Industrial Dry Air Cooler for Data Center Cooling
US$10,000.00-12,000.00
1 Piece(MOQ)
Adiabatic Dry Air Cooler for Data Center with Copper Tube Aluminum Fin
US$14,500.00-15,410.00
1 Piece(MOQ)
130kw with Copper Fin Copper Tube, Compact Structure Adiabatic Dry Air Cooler for Data Room Server Cooling
US$3,000.00-5,000.00
1 Set(MOQ)
UL Certification 2400kw Adiabatic Dry Air Coolers for Middle East Data Center
US$4,000.00-5,000.00
1 Piece(MOQ)
Venttk Factory Supply Dry Air Cooler for Data Center Cooling
US$13,000.00-15,000.00
1 Piece(MOQ)
V Type 200kw Dry Cooler for Data Center
US$1,300.00-1,500.00
1 Piece(MOQ)
Industrial Energy Saving Evaporative Adiabatic Dry Air Cooler for Data Center Fluid Cooling System
US$1,500.00-3,500.00
1 Piece(MOQ)
Hacst Corrosion Resistant V Type Flat Type Dry Cooler for Data Center
US$3,000.00
1 Piece(MOQ)
Good Price Horizontal Dry Cooler for Data Center
US$5,000.00-6,000.00
1 Piece(MOQ)
Immersion Cooling Container Adiabatic Dry Cooler for Data Center Cooling
US$3,000.00
1 Piece(MOQ)
Good Quality Adiabatic Air Cooler Dry Cooler for Data Center Cooling
US$5,000.00-350,000.00
1 Piece(MOQ)
Horizontal Dry Air Cooler Low Pue Cooling Unit for Mining Data Center
US$20,000.00-50,000.00
1 Piece(MOQ)



















