SourcingAI
Try for free
Powered by Made-in-China.com
Synchronous Generator/ Hydro Turbine Generator
US$1,000.00-100,000.00
1 Set
Sample price:US$10000.00/piece.Request sample

Product profile

Customization

Available

After-sales Service

24/7 Aftersales Service

Warranty

Global Aftersales Service Since 1998

Model NO.

CJ

Output Type

All Types

Size

All Types

Type

All Types

Bearing Support

All Types

Speed

All Types

Bearing Number

All Types

Standard

All Types

Stand Point

2,3,4,6

Voltage

Low,Medium,High

Transport Package

Wooden Case or Plywood Case

Specification

CE/IEC

Trademark

FUCHUN

Origin

China

Production Capacity

500 Pieces/ Year

Key features

Global After-sales Service: Providing comprehensive support since 1998 with 24/7 availability.
Flexible Stand Point Design: Adapts 2, 3, or 4 stand points to balance civil work and equipment costs.
Wide Voltage Options: Available in Low, Medium, and High voltage configurations.
Long Product Life Expectancy: Ensured through strict quality control and careful design.
Multi-Fuel Compatibility: Operable with natural gas, diesel, or coal.
Scalable Power Output: Capable of producing power from kilowatts to megawatts.
Grid Synchronization: Output synchronized with electrical grid frequency for efficient transfer.

Company profile

Business Type: Manufacturer/Factory, Trading CompanyAverage Response Time: ≤24h

About Our Factory & Business Background

AddressRoom 1125, Noble Plaza, No. 269 Qianjin 1st Road, Baoan District, Shenzhen, Guangdong, China
Average Lead TimePeak Season Lead Time: 6-12 months Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsWater Turbine Generator, Sluice Gate, Transformer, Control Panel, Valve, Hydro Power Plant

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the warranty period?
A:
We provide global after-sales service since 1998.
Q:Is 24/7 support available?
A:
Yes, we offer 24/7 after-sales service.
Q:What stand points are available?
A:
We offer 2, 3, and 4 stand points to balance costs.
Q:What voltage options do you offer?
A:
We provide Low, Medium, and High voltage options.
Q:What is the lead time for production?
A:
Peak season lead time is 6-12 months, and off-season is 1-3 months.

Send Inquiry

*To:Fuchun Industry Development Co., Ltd. ShenzhenFuchun Industry Development Co., Ltd. Shenzhen
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Small Hydro Turbine Brushless Synchronous Generator

Small Hydro Turbine Brushless Synchronous Generator

US$20,000.00-180,000.00
1 Piece(MOQ)
Made-in-China.com
100kw 300rpm 380VAC Permanent Magnet Synchronous Generator
Made-in-China.com
5kw Low Water Head Mini Hydro Turbine Generator
Made-in-China.com