SourcingAI
Try for free
Powered by Made-in-China.com
Durable Metal Components for Precision Car Manufacturing Needs
US$6.00
100-999 Pieces
US$5.00
1,000-4,999 Pieces
US$4.00
5,000-99,999 Pieces
US$3.00
100,000-499,999 Pieces
US$2.00
500,000+ Pieces
Sample price:US$10.00/piece.Request sample

Product profile

Customization

Available

Standard

China GB Code

Tolerance

+/-0.10mm

Model NO.

FL017

Surface Treatment

Polishing

Material

Stainless Steel

Sample

Available

Color

Customized

Lead Time

20-45 Days

Dimension

Customized

Transport Package

Carton

Specification

customized

Trademark

none

Origin

China

HS Code

7326909000

Production Capacity

50000PCS/Year

Key features

Customized Dimensions: Full customization available for dimensions to meet specific design requirements.
Customized Color: Color options can be customized according to customer specifications.
High Precision Tolerance: Standard tolerance of +/-0.10mm with high-precision processing capabilities.
Diverse Material Options: Available in stainless steel, iron plates, and aluminum plates.
Comprehensive Surface Treatment: Offers polishing, galvanizing, spraying, and electroplating for corrosion resistance.
OEM and ODM Services: Full OEM and ODM support available for complete product customization.
Flexible MOQ: Minimum Order Quantity is 1 pc with flexible production volume options.
Fast Sample Delivery: Simple samples ready in 3-7 days, complex samples in 15-20 days.

Company profile

Ningbo Fulei Metal Products Co., Ltd.
High Repeat Buyers ChoiceQuality AssuranceProduction Process VisualizationFull Customization
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 7 Years CertifiedNearest Port: Ningbo port; Shanghai portAverage Response Time: ≤0.93h

About Our Factory & Business Background

AddressNo. 18, Zhenxing South Road, Qijiashan Street, Beilun District, Ningbo, Zhejiang, China
Plant Area2500 square meters
Number of Employees22
Registered Capital1,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 pc
Supply Chain Partners30

Our Production Capability & Technical Expertise

Main ProductsFeeder, Sheet Metal, Bracket, Library Cart, Bookend, Cable Tray, HVAC System, Pig Equipment, Chicken Equipment, Tissue Box Holder
Production Lines1
Production MachinesLaser Cutting Machine, Bending Machine, Welding Machine, Polishing machine, Drilling machine, Collision welding machine, Riveting machine, unching machine
QA/QC inspectors1 people
Inspection Type for Finished ProductsRandom inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2016-07-27
Main MarketsDomestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff1
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Product Q&A

Q:Are you a factory or trading company?
A:
We are a dedicated factory situated in the bustling city of Ningbo, China. With over eight years of specialized expertise, we distinguish ourselves as a professional manufactory committed to excellence.
Q:What's your advantage?
A:
1. As a direct manufactory, we deliver top-tier products at exceptionally competitive prices; 2. Our expert design and development team guarantees innovative and superior solutions.
Q:What's the MOQ?
A:
No need to worry about the MOQ. We can customize the production volume to meet your specific requirements.
Q:How long is a sample order prepared? And how long is the mass production time?
A:
Sample Order: Simple products take 3-7 days, while complex ones require about 15-20 days. Mass Production: Typically, it takes around 30 days after receiving the deposit.
Q:What is the packing method for the products?
A:
Firstly, each fitting is meticulously wrapped in plastic film, then safely placed into cartons, wooden cases, or pallets for optimal protection.

Send Inquiry

*To:Ningbo Fulei Metal Products Co., Ltd.Ningbo Fulei Metal Products Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like