SourcingAI
Try for free
Powered by Made-in-China.com
Heavy-Duty Double-Sided Silver Machinery Panel for Livestock Yards
US$160.00
10-99 Pieces
US$150.00
100-299 Pieces
US$140.00
300+ Pieces
Sample price:US$160.00/piece.Request sample

Product profile

Customization

Available

After-sales Service

Six-Month Warranty (Non-Artificial)

Warranty

Six-Month Warranty (Non-Artificial)

Model NO.

HOG004

Type

Cold Stamping

Processing Type

Shaping Metal

Material

Stainless Steel

Mould

Multistep Progressive Dies

Surface Processing

Polishing

Fine Blanking

Open

Process

Forming Process

Industry

Metal Stamping Parts

Tolerances

0.1mm

Customized

Customized

Size

34" Tall

Color

Silver

Side

2

Use

Livestock

Transport Package

Wooden Box, Carton, or Bulk

Specification

customized

Trademark

none

Origin

China

HS Code

7326909000

Production Capacity

50000PCS/Year

Key features

Customized Dimensions: Available in 34 inches tall with various width options to suit specific needs.
Durable Stainless Steel: Crafted from premium heavy-grade aluminum with stainless steel components.
Foldable Design: Hinged panels open to cover expansive areas and fold compactly for storage.
Precision Tolerances: Manufactured with high precision tolerances of 0.1mm.
OEM and ODM Services: Accepts OEM and ODM services with flexible customization options.
Six-Month Warranty: Includes a six-month warranty covering non-artificial defects.
Professional Manufacturing: Factory direct with over eight years of experience in metal stamping.
Third-Party Inspection: Accepts third-party inspections to ensure product quality.

Company profile

Ningbo Fulei Metal Products Co., Ltd.
High Repeat Buyers ChoiceQuality AssuranceProduction Process VisualizationFull Customization
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 7 Years CertifiedNearest Port: Ningbo port; Shanghai portAverage Response Time: ≤1.76h

About Our Factory & Business Background

AddressNo. 18, Zhenxing South Road, Qijiashan Street, Beilun District, Ningbo, Zhejiang, China
Plant Area2500 square meters
Number of Employees22
Registered Capital1,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 pc
Supply Chain Partners30

Our Production Capability & Technical Expertise

Main ProductsFeeder, Sheet Metal, Bracket, Library Cart, Bookend, Cable Tray, HVAC System, Pig Equipment, Chicken Equipment, Tissue Box Holder
Production Lines1
Production MachinesLaser Cutting Machine, Bending Machine, Welding Machine, Polishing machine, Drilling machine, Collision welding machine, Riveting machine, unching machine
QA/QC inspectors1 people
Inspection Type for Finished ProductsRandom inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2016-07-27
Main MarketsDomestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff1
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Product Q&A

Q:Are you a factory or trading company?
A:
We are a factory in Ningbo, China. We are a professional manufactory with more than eight years of experience.
Q:What is your advantage?
A:
1. We are manufactory direct. High-quality products and competitive prices; 2. We have a professional design and development team.
Q:What is the MOQ?
A:
Please don't worry about the MOQ, we can produce the quantity according to your requirements.
Q:How long is a sample order prepared? And how long time of mass production?
A:
Sample Order: Depending on the complexity of the product, it takes 3-7 days for simple products and about 15-20 days for complex ones. Mass Production: Usually takes 30 days after receiving the deposit.
Q:What is the packing method for the products?
A:
Firstly, we pack the fittings one by one using plastic film, then put them into cartons, wooden cases, or pallets.

Send Inquiry

*To:Ningbo Fulei Metal Products Co., Ltd.Ningbo Fulei Metal Products Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Steel Galvanised Mounting Bracket for Solar Panels
Made-in-China.com