SourcingAI
Try for free
Powered by Made-in-China.com
Best Price TTR Tester Fuootech Ftbb-10A Intelligent Automatic Transformer Turns Ratio Tester
US$2,200.00
1-2 Sets
US$2,000.00
3-4 Sets
US$1,950.00
5-9 Sets
US$1,800.00
10+ Sets

Product profile

Customization

Available

After-sales Service

1 Year

Warranty

1 Year

Model NO.

FTBB-10A turn ratio tester

Max Diameter of Workpiece

<500mm

Mass Scope of Workpiece

<900kg

Type

Transformer Turn Ratio Tester

Accuracy Grade

0.2%

Load Way

Electronic Load

Display

Digital

Control

Computer Control

Weight

5.5 Kgs

Power Source

AC220V+_10%, 50Hz

Ratio Testing Range

1- 10000

Group Testing Range

1-12

Input Power

40va

Connect

Standard AC Socket 60320

Function

Transformer Ratio, Group, Polarity Test

Transport Package

in Standard Exportation Plywood Case

Specification

360× 290× 170 (mm)

Trademark

FUOOTECH

Origin

Chongqing, China

HS Code

9030849000

Production Capacity

1000 PCS/Month

Key features

High Precision Measurement: Accuracy grade 0.2% with resolution as low as 0.0001 for reliable results.
Fast Three-Phase Testing: Completes single-phase tests in 5 seconds and handles three-phase transformers simultaneously.
Wide Measurement Range: Ratio testing range from 0.9 to 10000, suitable for various transformer types.
Intuitive Color Display: Features a 240*128 color LCD screen for clear and interactive operation.
Comprehensive Protection: Includes high/low voltage reverse connection and short circuit protection functions.
Flexible Power Supply: Supports AC220V mains power and DC lithium battery for on-site use without power.
Large Data Storage: Can store up to 850 groups of test data with no power-down clock display.
Portable and Lightweight: Compact design with a host weight of only 5.5 KGS for easy transportation.

Company profile

Chongqing Fuootech Oil Purifier Technologies Co., Ltd.
Importers and ExportersHigh Repeat Buyers Choice
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from DesignsExport Year: 2015-01-10 CertifiedNearest Port: Shanghai PortAverage Response Time: ≤1.41h

About Our Factory & Business Background

AddressNo. 5 Hongshi Street, Chongqing, China
Plant Area43 square meters
Number of Employees5
Registered Capital1,000,000 RMB
Terms of PaymentT/T, LC, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 set
Supply Chain Partners10

Our Production Capability & Technical Expertise

Main ProductsOil Purifier and Its Spare Parts, Oil Filtration Machine, Oil Regeneration System, Vacuum Pumping System and Its Spare Parts, Dry Air Generator, Oil Tester, Transformer Test Machine, Electrical Testin
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2015-10-28
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic
Repeat Buyers Choice50%~80%
Overseas Agent/BranchYes
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Product CertificationCE
Cooperated with Fortune 500No

Product Q&A

Q:How long does a single-phase test take?
A:
The single-phase test is completed within 5 seconds, offering fast test speed and high efficiency.
Q:Can this device test three-phase transformers?
A:
Yes, it overcomes traditional limitations by completing the three-phase transformation ratio test at one time.
Q:What is the maximum ratio measurement range?
A:
The ratio measurement range is wide, extending from 0.9 to 10000.
Q:Does the tester have data storage capabilities?
A:
Yes, it features a data storage function capable of saving up to 850 groups of data.
Q:Is the device suitable for on-site testing without mains power?
A:
Yes, it adopts an AC/DC power supply mode and includes a lithium battery for use without mains power.

Send Inquiry

*To:Chongqing Fuootech Oil Purifier Technologies Co., Ltd.Chongqing Fuootech Oil Purifier Technologies Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

GDB-D Automatic TTR Transformer Turns Ratio Tester
Made-in-China.com
Automatic TTR Three Phase Transformer Turn Ratio Tester
Made-in-China.com