SourcingAI
Try for free
Powered by Made-in-China.com
Bw Advanced Heat Pipe Machinery for Mass Production
US$2,999.00-3,999.00
1 Piece

Product profile

Customization

Available

After-sales Service

Available

Warranty

Available

Model NO.

bw

Process Thickness

0.1-0.3mm

Voltage

380V/50Hz

Quality

High Quality

Package Size

1300.00cm * 1300.00cm * 1300.00cm

Package Gross Weight

1300.000kg

Transport Package

Custom

Trademark

N/A

Origin

China

Key features

High-Speed Shrinking: Processes heat pipe heads in 7s and tails in 5s using high-speed rotation.
Precision Argon Welding: Uses Japan Sansha argon arc welding for precise head and tail sealing.
Advanced Control System: Equipped with Japan Mitsubishi PLC and Weiluntong touch screens.
Multi-Station Degassing: Offers 36-workstation filling and up to 8-workstation vacuum degassing.
High-Quality Motors: Features imported water-cooled motors and Taiwan Hiwin servo motors.
Wide Tube Compatibility: Supports D2 to D8 specifications with wall thickness 0.1-0.3mm.
Comprehensive After-Sales: Provides available warranty and after-sales service support.

Company profile

Nanjing New Donor Machinery Equipment Co., Ltd.
High Repeat Buyers ChoiceLow MOQFlexible Customization
Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 2 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤3.49h

AI-Powered supplier vetting

SummaryNanjing New Donor Machinery Equipment Co., Ltd. is identified as a China-based manufacturer/factory producing heat exchangers, fin tubes, and fin tube machines. The supplier reports OEM service for well-known brands, broad customization options, export activity, quality-management practices, and experienced technical and production teams. Its export sales share is stated as 71%–90%, but it began exporting only two years ago. Evidence is insufficient to confirm certifications, after-sales capability, financial strength, or customer cases. The supplier reports no available SDK, has four employees, and its raw-material traceability, environmental assessment, and fire-drill status are unknown. An audit by BV is documented with a validity period from June 25, 2025 to June 24, 2026, but the provided audit result value is not interpretable as a performance conclusion.
Supplier typeThe supplier is explicitly identified as a Manufacturer/Factory and a limited company in China, operating in manufacturing and processing machinery. Its stated products are heat exchangers, fin tubes, and fin tube machines.
R&D capabilityThe supplier states that it continuously develops safer, lighter, and more energy-saving products, pursues technological innovation, and conducts mechanical-equipment R&D. However, it reports no available SDK, and no measurable innovation output or R&D performance is provided.
Production capacityThe supplier is identified as a factory with a stated scientific management system, high-standard quality control, advanced production equipment, sophisticated testing equipment, and experienced technical and production teams. Its product scope covers heat exchangers, fin tubes, and fin tube machines, although the reported employee count is four.
Customization capabilityThe supplier explicitly supports customization from samples, designs, full customization, minor customization, and flexible customization. This provides direct evidence of broad customization coverage.

Product Q&A

Q:What is the processing capacity of the shrinking machine?
A:
The machine processes about 7 seconds per piece at the head end and 5 seconds at the tail end.
Q:What control system is used in the equipment?
A:
All equipment utilizes Japan Mitsubishi PLC combined with Weiluntong touch screens.
Q:What are the supported tube specifications?
A:
The machines support D2, D3, D4, D5, D6, and D8 tube specifications.
Q:What is the maximum wall thickness the machine can process?
A:
The processing wall thickness ranges from 0.1mm to 0.3mm.
Q:What is the lead time for peak and off-peak seasons?
A:
Peak season lead time is 3-6 months, while off-season is 1-3 months.

Send Inquiry

*To:Nanjing New Donor Machinery Equipment Co., Ltd.Nanjing New Donor Machinery Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Mobile Pipe Welding Machine for Heat Pipe Production
Made-in-China.com
Likesmile All-in-One Machine for Heat Pipe Production
Made-in-China.com
Advanced Heat Pipe Machinery for Mass Production

Advanced Heat Pipe Machinery for Mass Production

US$2,999.00-3,999.00
1 Piece(MOQ)
Made-in-China.com
Advanced Machinery for Heat Pipe Assembly

Advanced Machinery for Heat Pipe Assembly

US$2,999.00-3,999.00
1 Piece(MOQ)
Made-in-China.com