Powered by Made-in-China.com
Bw Water Injection and Degassing System for Heat Pipes
US$2,999.00-3,999.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
AvailableModel NO.
bwProcess Thickness
0.1-0.3mmVoltage
380V/50HzQuality
High QualityPackage Size
1300.00cm * 1300.00cm * 1300.00cmPackage Gross Weight
1300.000kgTransport Package
CustomTrademark
N/AOrigin
ChinaKey features
High-Speed Processing: Cycle time as fast as 3-7 seconds per piece for efficient heat pipe manufacturing.
Premium Control System: Equipped with Japan Mitsubishi PLC and Weiluntong touch screen for precise operation.
Wide Specification Support: Compatible with heat pipe diameters D2, D3, D4, D5, D6, and D8.
Imported Core Components: Uses imported water-cooled motors, Taiwan Hiwin servo motors, and Japan Sansha welding machines.
Flexible Customization: Supports full customization, minor customization, and flexible customization based on samples or designs.
Low MOQ: Minimum Order Quantity is just 1 PC, suitable for small batch testing.
Professional After-Sales: Available after-sales service and warranty coverage for all equipment.
Comprehensive Solution: Provides complete line including shrinking, welding, filling, degassing, and straightening machines.
Company profile
Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 2 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤4.18h
AI-Powered supplier vetting
SummaryNanjing New Donor Machinery Equipment Co., Ltd. is identified as a China-based manufacturer/factory producing heat exchangers, fin tubes, and fin tube machines. The supplier reports OEM service for well-known brands, broad customization options, export activity, quality-management practices, and experienced technical and production teams. Its export sales share is stated as 71%–90%, but it began exporting only two years ago. Evidence is insufficient to confirm certifications, after-sales capability, financial strength, or customer cases. The supplier reports no available SDK, has four employees, and its raw-material traceability, environmental assessment, and fire-drill status are unknown. An audit by BV is documented with a validity period from June 25, 2025 to June 24, 2026, but the provided audit result value is not interpretable as a performance conclusion.
Supplier typeThe supplier is explicitly identified as a Manufacturer/Factory and a limited company in China, operating in manufacturing and processing machinery. Its stated products are heat exchangers, fin tubes, and fin tube machines.
R&D capabilityThe supplier states that it continuously develops safer, lighter, and more energy-saving products, pursues technological innovation, and conducts mechanical-equipment R&D. However, it reports no available SDK, and no measurable innovation output or R&D performance is provided.
Production capacityThe supplier is identified as a factory with a stated scientific management system, high-standard quality control, advanced production equipment, sophisticated testing equipment, and experienced technical and production teams. Its product scope covers heat exchangers, fin tubes, and fin tube machines, although the reported employee count is four.
Customization capabilityThe supplier explicitly supports customization from samples, designs, full customization, minor customization, and flexible customization. This provides direct evidence of broad customization coverage.
Product Q&A
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 PC.
Q:What is the average lead time for production?
A:
The average lead time is one month for both peak season and off-season.
Q:What payment terms are accepted?
A:
We accept LC, T/T, D/P, PayPal, Western Union, and Small-amount payment.
Q:Is customization service available?
A:
Yes, we offer ODM and OEM services, including full customization, minor customization, and flexible customization from samples or designs.
Q:What are the available power configurations?
A:
Power configurations include 220V single-phase and 380V three-phase, depending on the specific equipment model.
Send Inquiry
*To:
Nanjing New Donor Machinery Equipment Co., Ltd.
Nanjing New Donor Machinery Equipment Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Bw Automatic Filling and Shrinking System for Heat Pipes
US$2,999.00-3,999.00
1 Piece(MOQ)
Water Injection and Degassing System for Heat Pipes
US$2,999.00-3,999.00
1 Piece(MOQ)
CIP Cleaning System for Wash Pipes and Containers
US$8,000.00
1 Piece(MOQ)
Reverse Osmosis Water Filtration System Equipment for Industrial and Commercial Use
US$7,400.00-90,000.00
1 Piece(MOQ)
Advanced Vacuum Pressure Impregnation System for Carbon and Ceramic Heating
US$48,000.00-50,000.00
1 Set(MOQ)
Automatic Filling and Shrinking System for Heat Pipes
US$2,999.00-3,999.00
1 Piece(MOQ)
Marya GMP-Compliant Isolator System for Closed Processing of Vaccines and Biologics
US$14,000.00
1 Piece(MOQ)
Vacuum Degassing System for Heat Pipe Manufacturing
US$2,999.00-3,999.00
1 Piece(MOQ)
Advanced PLC Automatic Weighing and Dissolving System for Precision Control
US$28,000.00-45,000.00
1 Piece(MOQ)
High Purity Water Purification System for Pharmaceutical and Laboratory Applications
US$65,000.00
1 Piece(MOQ)
Advanced Dust Collection System for Woodworking and Metalworking
US$300,000.00
1 Piece(MOQ)
Automatic Roller Projection System for Events and Shows
US$345.00-1,000.00
1 Piece(MOQ)
Pipe Transverse/ Lateral Trolley Conveying System for Cutting and Beveling Station / Fitting up and Welding Station
US$4,999.00-95,000.00
1 Set(MOQ)
Motorized Heavy-Duty Curtain Track System for Opening and Closing of Stage Curtains
US$600.00-900.00
1 Piece(MOQ)
Advanced Hanli Industrial Water Cooling System for Efficient Performance
US$900.00-1,400.00
1 Piece(MOQ)
Pipe Conveying System for End Beveling Machine (PLTPS-24B1/B2) - 1
US$30,000.00-80,000.00
1 Piece(MOQ)
Taphole Drilling and Plugging System for Ferroalloy Furnace
US$10,000.00-30,000.00
1 Piece(MOQ)



















