SourcingAI
Try for free
Powered by Made-in-China.com
3 Phase 25kw DC Frequency Driver PCB Board Inverter Air Conditioner Compressor Inverter Control Circuit Board PCBA
US$360.00-400.00
1 Set
Sample price:US$400.00/set.Request sample

Product profile

Customization

Available

Metal Coating

Copper

Mode of Production

SMT

Model NO.

T50A02

Layers

Double-Layer

Base Material

FR-4

Certification

RoHS, ISO

Customized

Customized

Condition

New

Type

Compressor Driver Inverter Control Board

Product Name

180 °Sinusoidal DC Inverter Driver

Application

DC Frequency Inverter Compressor

Rated Input Voltage

380V 50/60Hz

Input Maximum Power

25kw 380V AC

Input Maximum Current

50A

Communication

Standard RS485 Isolation Design, Baud Rate 1200BPS

Output Hz

15-120Hz

Pfc

PF Value (0.90-0.99)

Carrier Frequency

5.0kHz

Transport Package

1.Protect Product with Polyfoam and Multi Layer PA

Specification

Mounting size: 270*190*135mm

Trademark

ELECHICO

Origin

Foshan, China

HS Code

9032100000

Production Capacity

10000pieces/Year

Key features

Customized Product Design: Supports OEM/ODM services with customizable designs and logos to meet diverse requirements.
High Efficiency Control: Features 180-degree sinusoidal vector driving with low harmonic output and high efficiency.
Wide Voltage Range: Operable voltage range from 320V to 460V with standard 380V input.
Adjustable Carrier Frequency: Carrier frequency is 5.0kHz and can be adjusted according to compressor noise.
Standard Communication Interface: Equipped with RS485 interface supporting Standard Modbus RTU protocol at 1200 bps.
Robust Operating Conditions: Operating temperature range from -20 to 60 degrees Celsius and humidity under 95%.
Advanced Manufacturing: Produced with automated SMT, AOI, and FCT machines in 4000sqm facilities.
Experienced R&D Team: Backed by over 19 years of experience in heat pump controller R&D and manufacturing.

Company profile

Business Type: Manufacturer/Factory, Trading CompanyAverage Response Time: ≤6.51h

AI-Powered supplier vetting

SummaryGuangdong Chico Electronic Inc. is a China-based limited company established in 2003, with 185 employees and six production lines. It reports ISO9001:2015 certification, 32 years of combined R&D engineer experience, 41–50 quality-control staff, and systems and facilities including PLM, ERP, MES, a provincial engineering and technology center, and a national standard product reliability laboratory. The supplier manufactures and trades across several electronic, lighting, and industrial-equipment categories, exports to multiple global regions, and reports off-peak lead times within 15 workdays and peak-season fulfillment of one month. It has self-operated import/export rights and documented trade activity involving Brazilian buyers, but the evidence does not establish after-sales support, customization capability, financial credibility, or a broad customer-case record.
Supplier typeThe supplier is identified as a combined business entity and limited company operating in China, with commercial activities spanning industrial equipment, lighting, electrical and electronic products, and consumer electronics. Its self-operated import/export rights and listed global export markets indicate both manufacturing and international trading capability.
CertificationsThe supplier explicitly reports an ISO9001:2015 certificate. It also states that it has a national standard product reliability laboratory and advanced inspection equipment, which supports quality-management capability, although no additional certification details are provided.
R&D capabilityInnovation capability is supported by 32 years of combined R&D engineer experience, recognition as a National High-tech Enterprise, a provincial engineering and technology center, and implementation of PLM, ERP, and MES systems. These are explicit indicators of organized R&D and technology development capacity.
Production capacityThe supplier reports 185 employees, six production lines, a 4,300 m² manufacturing plant, 41–50 quality-control staff, advanced production and inspection equipment, and stated delivery times of within 15 workdays off-peak and one month during peak season. Together, these details provide explicit evidence of established production and quality-control infrastructure.

Product Q&A

Q:Can I place sample order first?
A:
Yes, we will quote you different prices for small, medium and large qty. You can order with different price for different qty.
Q:How could I pay them?
A:
PayPal, Western Union and T/T are preferred, so just tell us which is easier to you. Then we will send you our bank details.Or as your requirements.
Q:How long can I get my order?
A:
For samples, we will finish production and ship within 7~10 working days. For bulk orders, usually 15~20 working days and depends on your design.
Q:How to send us the products?
A:
We usually use DHL, UPS, FedEX to ship samples. For bulk orders, we support shipping by air or by sea.
Q:Can you customize according to our designs and put our logo on the products?
A:
Yes, we support both standard and customized products and can put your logo on the products. Our experienced R&D team will support technical questions. ODM/OEM is welcome.

Send Inquiry

*To:Guangdong Chico Future Technology Group Inc.Guangdong Chico Future Technology Group Inc.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like