SourcingAI
Try for free
Powered by Made-in-China.com
Single Compressor Air-Source Chiller Heat Pump Control Board PCBA with Heat Recovery
US$65.00-76.00
2 Sets
Sample price:US$76.00/set.Request sample

Product profile

Customization

Available

Metal Coating

Copper

Mode of Production

SMT+DIP

Model NO.

CCCH001

Layers

Double-Layer

Base Material

FR-4

Certification

RoHS, ISO

Customized

Customized

Condition

New

Produuct Name

Chiller Heat Pump Controller

Application

Commercial Chiller Heat Pump Machine

Power Supply

380 or 220±10%(VAC), 50/60Hz

Sensor Type

Ntc(5K, 50K)

Controlling Range

-20°C~60°C

Working Mode

Heating , Cooling

Setting Temperature Range

10-55 Celsius

Heat Source

Air Source

Smart Control

Wi-Fi, Modbus, Ota

Service

OEM/ODM

Transport Package

1.Protect Product with Polyfoam and Multi Layer PA

Specification

Mounting size: 161*119*25mm

Trademark

ELECHICO

Origin

Foshan, China

HS Code

8537101190

Production Capacity

80000

Key features

Full Heat Recovery: Produces free domestic hot water during the cooling process to improve energy efficiency.
Smart Interconnection: Supports Wi-Fi, Modbus, OTA updates, and cascade control for large spaces.
Customizable Design: Offers OEM/ODM services with customizable sensors, power supply, and controllers.
Multiple Controller Options: Provides LCD Touch, TFT Touch, and Push-button controllers for user preference.
Dual-Mode Functionality: Integrates heating and cooling in one unit for year-round use in various applications.
High Precision Control: Ensures temperature control accuracy within 1 Celsius for stable performance.
100% Quality Testing: Every product undergoes 100% testing before delivery to ensure zero defects.

Company profile

Business Type: Manufacturer/Factory, Trading CompanyAverage Response Time: ≤7.16h

AI-Powered supplier vetting

SummaryGuangdong Chico Electronic Inc. is a China-based limited company established in 2003, with 185 employees and six production lines. It reports ISO9001:2015 certification, 32 years of combined R&D engineer experience, 41–50 quality-control staff, and systems and facilities including PLM, ERP, MES, a provincial engineering and technology center, and a national standard product reliability laboratory. The supplier manufactures and trades across several electronic, lighting, and industrial-equipment categories, exports to multiple global regions, and reports off-peak lead times within 15 workdays and peak-season fulfillment of one month. It has self-operated import/export rights and documented trade activity involving Brazilian buyers, but the evidence does not establish after-sales support, customization capability, financial credibility, or a broad customer-case record.
Supplier typeThe supplier is identified as a combined business entity and limited company operating in China, with commercial activities spanning industrial equipment, lighting, electrical and electronic products, and consumer electronics. Its self-operated import/export rights and listed global export markets indicate both manufacturing and international trading capability.
CertificationsThe supplier explicitly reports an ISO9001:2015 certificate. It also states that it has a national standard product reliability laboratory and advanced inspection equipment, which supports quality-management capability, although no additional certification details are provided.
R&D capabilityInnovation capability is supported by 32 years of combined R&D engineer experience, recognition as a National High-tech Enterprise, a provincial engineering and technology center, and implementation of PLM, ERP, and MES systems. These are explicit indicators of organized R&D and technology development capacity.
Production capacityThe supplier reports 185 employees, six production lines, a 4,300 m² manufacturing plant, 41–50 quality-control staff, advanced production and inspection equipment, and stated delivery times of within 15 workdays off-peak and one month during peak season. Together, these details provide explicit evidence of established production and quality-control infrastructure.

Product Q&A

Q:What is the delivery time for orders?
A:
Orders under 100pcs are delivered within 20 working days. Larger orders take 20-35 days.
Q:What is the warranty period for the product?
A:
Products come with a 1-year guarantee. Free replaceable parts are provided for any issues within this period.
Q:Does the company accept OEM/ODM customization?
A:
Yes, OEM and ODM services are available to meet diverse customer requirements.
Q:How is product quality controlled?
A:
Products comply with ISO and CE standards, with designated engineers for each procedure and a professional QC team.
Q:Are all goods tested before delivery?
A:
Yes, 100% testing is conducted on all goods before delivery to ensure reliability.

Send Inquiry

*To:Guangdong Chico Future Technology Group Inc.Guangdong Chico Future Technology Group Inc.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like