SourcingAI
Try for free
Powered by Made-in-China.com
Big Antechamber Heating for Lithium Ion Battery Production Lineworking Station Glove Box
US$24,000.00
1 sets

Product profile

Customization

Available

After-sales Service

1

Warranty

1

Voltage Input

AC220V/50Hz

Anode Material

Lco

Battery Size

Standard

Control System

Siemens PLC

Weight

1100kg

Name

Double Station Glove Box

Water Content

<1ppm

Oxygen Content

<1ppm

Purifier

Single Column

Storage Type

Store in Warehouse

Application

Consumer Electronics

Oxygen Analyzer

Range 0-1000ppm

Transport Package

Standard Exported Package

Specification

1220*800*1900mm

Trademark

Gelon

Origin

Guangdong, China

Key features

Integrated Purification System: Single column purifier maintains water content <1ppm and oxygen content <1ppm.
Advanced PLC Control: Siemens PLC controller ensures precise operation and monitoring.
High-Precision Oxygen Analysis: Oxygen analyzer range covers 0-1000ppm for accurate measurement.
Robust Stainless Steel Build: Constructed from stainless steel for durability and inert gas retention.
Turnkey Project Solution: Complete supply of materials, equipment, and technology design services.
Flexible Lead Time: Off-season delivery within 15 workdays; peak season 1-3 months.
Comprehensive Payment Options: Supports LC, T/T, D/P, PayPal, Western Union, and other methods.
Global Shipping Capability: Multiple Incoterms available including FOB, CIF, DDP, and DAP.

Company profile

Dongguan Gelon Lib Co., Ltd.
High Repeat Buyers ChoiceCooperated with Fortune 500Experienced TeamExhibition Experience
Business Type: Manufacturer/FactoryExport Year: 2020-07-18Nearest Port: shenzhenAverage Response Time: ≤5.65hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA

About Our Factory & Business Background

AddressRoom 1207, Building 1, No. 16, Fourth Keji Road, Songshan Lake Park, Dongguan, Guangdong, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsBattery Machine, Lithium Battery Materials, Lithium Battery Equipments, Lithium Battery Lab Equipments, Lithium Ion Battery Production Line

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the water and oxygen content level?
A:
The system maintains water content below 1ppm and oxygen content below 1ppm using a single column purifier.
Q:What control system is used?
A:
The glove box is equipped with a Siemens PLC controller for reliable operation.
Q:What are the dimensions and weight?
A:
The size is 1220*800*1900mm and the weight is 1100kg.
Q:What is the lead time for delivery?
A:
Off-season lead time is within 15 workdays, while peak season takes 1-3 months.
Q:Do you provide turnkey solutions?
A:
Yes, we offer a one-stop solution including materials, equipment, and production line design.

Send Inquiry

*To:Dongguan Gelon Lib Co., Ltd.Dongguan Gelon Lib Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like