SourcingAI
Try for free
Powered by Made-in-China.com
Frankincense Essential Oil Extraction Equipment Steam Distillation Extraction Equipment
US$3,600.00
1-4 Pieces
US$3,500.00
5-9 Pieces
US$3,300.00
10+ Pieces

Product profile

Customization

Available

After-sales Service

Free

Warranty

1 Year

Model NO.

GY-EO100

Type

Air Separation Plant

Object

Paint

Separation Mode

Sedimentation Type

Operating Type

Continuous Type

Installation

Horizontal

Centrifuge Type

Horizontal Spiral Centrifuge

Distillation Equipment Type

Essential Oil Distillation Equipment

Extraction Tower Type

Vibration Plate Tower

Pressure

Low Pressure

Condition

New

MOQ

1

Raw Material

Plant

Capacity

0.5L-100L

Voltage

22ov/380V

Location

Shanghai

Transport Package

Shipping

Specification

800*600*5cm

Trademark

GENYOND

Origin

China

HS Code

2201

Production Capacity

60000 Pieces/Year

Key features

1 Year Warranty: Comprehensive 1-year warranty coverage for the entire machine and core components.
SUS304 Material: Constructed with high-grade SUS304 stainless steel for durability and hygiene.
Continuous Operation: Designed for continuous type operation to ensure efficient and stable production.
Low Pressure System: Operates under low pressure conditions for safe and controlled extraction processes.
Vibration Plate Tower: Equipped with advanced vibration plate tower technology for effective separation.
Customizable Capacity: Available in capacities ranging from 0.5L to 100L to suit various production needs.
Global Showroom: Showrooms located in Germany, Spain, Russia, Canada, France, and the UK.
Video Inspection: Outgoing inspection videos provided to verify machine quality before shipment.

Company profile

Shanghai Genyond Technology Co., Ltd.
Customization from DesignsQuality AssuranceQA/QC InspectorsProduct Certification
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Designs CertifiedExport Year: 9 Years CertifiedNearest Port: Shanghai Port, Guangzhou Port, Ningbo Port, Qingdao PortAverage Response Time: ≤9.90h

About Our Factory & Business Background

AddressRoom 1416-1418, Flour 14, Shatian Building, No. 587 Changshou Road, Shanghai, China
Plant Area150.84 square meters
Number of Employees15
Registered Capital1,000,000 RMB
Terms of PaymentLC, T/T, Small-amount payment, Western Union, PayPal, D/P
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners1

Our Production Capability & Technical Expertise

Main ProductsEssential Oil Machine, Drying Machine, Fruit Juice Machine, Fruit Jam Machine, Milk Machine, Fruit Chips Machine, Filling Packing Machine, Evaporator, Yogurt Machine, Ice Cream Machine
Production Lines1
Production MachinesCutting Machine, Bending Machine, Rolling Machine
QA/QC inspectors9 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsNo

Our Industry Experience & Global Business Record

Year of Establishment2013-12-06
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic, South Asia
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff12
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Product CertificationCE
Cooperated with Fortune 500No

Product Q&A

Q:What is the warranty period for this equipment?
A:
We provide a 1-year warranty for the entire machine and core components.
Q:What materials are used to construct the machine?
A:
The equipment is made from high-quality SUS304 stainless steel.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 set.
Q:Can the machine capacity be customized?
A:
Yes, we offer customization options with capacities ranging from 0.5L to 100L.
Q:What is the lead time for production?
A:
The average lead time is one month for both peak and off-peak seasons.

Send Inquiry

*To:Shanghai Genyond Technology Co., Ltd.Shanghai Genyond Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Essential Oils Extraction Equipment

Essential Oils Extraction Equipment

US$4,000.00-8,500.00
1 Set(MOQ)
Made-in-China.com