SourcingAI
Try for free
Powered by Made-in-China.com
Extractor Distiller 100L Plant Flower Essential Oil Extraction Machine
US$8,900.00
1 Piece

Product profile

Customization

Available

After-sales Service

Engineers Available to Service Machinery Overseas

Capacity

10L-6000L

Model NO.

GY-EO-900

Certification

CE, GMP, ISO

Condition

New

Customized

Customized

Voltage

380V

Warranty

>2 Year

Extract Raw Material

Flower and Leaves

Extract Type

Distiller

Extract Rate

100%

Extract Steam Temperature

140

Model

Eo100-Eo6000

Heat Source

Boiler, Natural Gas, Coal, Firewood, etc.

Machine Power

0.55kw, 5kw.72kw

Machine Size

2700*1500*2800

Cooking Time

30-40 Mins

Precision

High Precision

Computerized

Computerized

Type

Essential Oil Distillers

Finished Dosage Form

Essential Oil

Transport Package

Wooden Cases

Specification

100-6000L

Trademark

Genyond

Origin

China

HS Code

8419899090

Production Capacity

100000PCS/Year

Key features

High Extraction Efficiency: Oil extraction rate reaches up to 95.652% with efficient condenser design.
Customizable Structure: Machine structure can be tailored according to specific customer requirements.
Premium Material Construction: Made of SUS304 stainless steel with special frame and digital display control.
Versatile Heating Options: Adapts to various heating methods including boiler, natural gas, coal, and firewood.
Wide Capacity Range: Available in models from 10L to 6000L to suit different production scales.
Overseas Technical Support: Engineers available to service machinery overseas for comprehensive after-sales support.
Certified Quality: Product holds CE, GMP, and ISO certifications for safety and quality assurance.
Efficient Oil-Water Separation: Equipped with oil and water separator using glass or stainless steel materials.

Company profile

Zhangjiagang Genyond Machinery Co., Ltd.
Importers and ExportersExperienced TeamOverseas Services100% Finished Products Inspection
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Designs CertifiedExport Year: 9 Years CertifiedNearest Port: Shanghai Port, Guangzhou Port, Ningbo PortAverage Response Time: ≤9.78h

About Our Factory & Business Background

AddressNo. 1416-1418, 14th Floor, 587 Changshou Road, Putuo District, Shanghai
Plant Area1100 square meters
Number of Employees13
Registered Capital10,000,000 RMB
Terms of PaymentLC, T/T, D/P, Western Union, PayPal, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1pc
Supply Chain Partners2

Our Production Capability & Technical Expertise

Main ProductsEssential Oil Machine, Drying Machine, Fruit Juice Machine, Fruit Jam Machine, Milk Machine, Fruit Chips Machine, Filling Packing Machine, Evaporator, Yogurt Machine, Ice Cream Machine
Production Lines1
Production MachinesCutting Machine, Bending Machine, Rolling Machine
QA/QC inspectors9 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsNo

Our Industry Experience & Global Business Record

Year of Establishment2017-09-28
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic, South Asia
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff12
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Product CertificationCE
Cooperated with Fortune 500No

Product Q&A

Q:What is the warranty period for this machine?
A:
We provide a warranty of more than 2 years for this equipment.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 piece.
Q:What certifications does the machine have?
A:
The machine is certified with CE, GMP, and ISO standards.
Q:What are the available heating sources?
A:
The machine can use boiler, natural gas, coal, or firewood as heat sources.
Q:What is the lead time for production?
A:
The average lead time is one month for both peak and off-season periods.

Send Inquiry

*To:Zhangjiagang Genyond Machinery Co., Ltd.Zhangjiagang Genyond Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Plant Equipment Oil Essence Ethanol Extraction Machine
Made-in-China.com