SourcingAI
Try for free
Powered by Made-in-China.com
2024 Carbon Steel Precision CNC Milling Machining Services
US$4.00-12.00
100 Pieces
Sample price:US$30.00/piece.Request sample

Product profile

Customization

Available

After-sales Service

3 Months

Warranty

1 Months

Model NO.

CNC Machining Parts

Condition

New

Certification

RoHS, ISO9001

Standard

DIN, ASTM, GOST, GB, JIS, ANSI, BS

Customized

Customized

Material

Stainless Steel

Application

Metal Cutting Machine, Metal Processing Machinery Parts

Keywords 01

CNC Machining Parts

Keywords 02

CNC Turning Parts

Keywords 03

CNC Milling Parts

Keywords 04

Precision CNC Parts

Keywords 05

Metal Parts

Transport Package

Individual Packing + Wooden Case

Specification

&250*160mm

Trademark

GN

Origin

China

HS Code

8466939000

Production Capacity

10000PCS

Key features

Wide Material Selection: Supports Stainless Steel, Aluminum, Steel, Copper, Titanium, and Plastics.
High Precision Tolerance: Achieves tight tolerance of +/-0.005mm with surface roughness Ra0.1-3.2um.
100% Quality Inspection: Strict QC policy with 100% inspection and random checks before shipment.
OEM/ODM Customization: Full customization from samples, designs, or minor adjustments available.
Advanced Surface Treatment: Offers Anodizing, Polishing, Plating, Sandblasting, and PVD coating.
ISO9001 Certified Factory: Manufacturer with 15+ years experience and strict ISO9001 management.
Fast Sample Delivery: Sample production takes 1-2 weeks, batch production 3-4 weeks.
Comprehensive After-Sales: Support via voice, video, or email with solutions provided within one week.

Company profile

Dongguan Guanneng Automation Technology Development Co., Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceFast Delivery
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 5 years CertifiedNearest Port: Shenzhen PortAverage Response Time: ≤0.62h

About Our Factory & Business Background

AddressRoom 202, Building 2, No. 6, Wanjiang Chuangye Industrial Road, Wanjiang Street, Dongguan City, Guangdong Province
Plant Area900 square meters
Number of Employees17
Registered Capital5,000,000 RMB
Terms of PaymentT/T, PayPal
International Commercial Terms(Incoterms)FOB, CIF, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 PCS
Supply Chain Partners20

Our Production Capability & Technical Expertise

Main ProductsCNC Machining Parts, Precision Machining Parts, Precision CNC Machining Parts, CNC Turning Part, Machinery Part, Machined Part
Production Lines2
Production MachinesCNC Machining Facility, Drilling Facility, Lathe, Milling Facility, Laser Marking Facility
QA/QC inspectors2 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers2 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2018-08-08
Main MarketsNorth America, Europe, East Asia(Japan/ South Korea)
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015
Cooperated with Fortune 500No

Product Q&A

Q:Are you a manufacturer or trading company?
A:
We are a factory located in Dongguan, China, with 13 years of experience, covering 6000 square meters with complete facilities and 40 machines.
Q:How to get a quote?
A:
Please provide detailed drawings (PDF/STEP/IGS/DWG), including quantity, delivery date, materials, quality requirements, and surface treatment details.
Q:Can I get a quotation without drawings?
A:
Yes, we can accept samples, pictures, or detailed size drafts for accurate quotation. Our engineering team can also assist with design if needed.
Q:Can you provide samples before mass production?
A:
Yes, sample fees are necessary but can be returned during mass production if possible.
Q:What is the delivery date?
A:
Samples typically take 1-2 weeks, while batch production takes 3-4 weeks.

Send Inquiry

*To:Dongguan Guanneng Automation Technology Development Co., Ltd.Dongguan Guanneng Automation Technology Development Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like