SourcingAI
Try for free
Powered by Made-in-China.com
Adjustable Roller Rack with Effortless Glide for Easy Access
US$100.00
1 Piece
Sample price:US$100.00/piece.Request sample

Product profile

Customization

Available

Standard

GB

Surface Treatment

Sand Blasted

Model NO.

Customizable

Energy Source

Electric Arc

Material

Rubber

Type

Braze Welding

Surface Quality

Flatness of Rubber Layer, Adhesive Strength of Rub

Mechanical Properties

Wear Resistance, Impact Resistance, Rotation Resis

Material Properties

Carbon Steel, Stainless Steel, Aluminum Alloy

Affordability

Tensile and Compressive Resistance, Bending Deform

Transport Package

According to Customer Needs

Specification

50*50*100

Trademark

According to customer needs

Origin

China

HS Code

8479890090

Production Capacity

50000

Key features

Customizable Material: Material can be customized according to customer requirements.
Customizable Surface: Surface treatment like sandblasting, painting, and electroplating can be customized.
Wear Resistance: Rubber coating enhances wear resistance and extends service life.
Noise Reduction: Soft rubber coating alleviates vibration and reduces noise.
High Friction: Increases friction between roller and belt for better conveying efficiency.
Anti-Adhesion: Unique adhesive layer prevents material from sticking to the drum.
Professional Support: Expert engineering team provides technical services and design support.
Wide Application: Suitable for coal mines, power plants, cement plants, and ports.

Company profile

Yantai Guocheng Metal Products Co., Ltd
Importers and ExportersHigh Repeat Buyers ChoiceFast DeliveryFull Customization
Business Type: Manufacturer/FactoryExport Year: 2018-03-09Nearest Port: Yantai Port, Qingdao Port, rizhao PortAverage Response Time: ≤0.66hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, Others, FCA

About Our Factory & Business Background

AddressNo. 18, Binglun Road, Zhifu District, Yantai, Shandong, China
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsStructural Steel Fabrication, Pressure Vessels, Weldments Structure Steel, Idlers, Transmission Shaft, Roller, Bottom Skid, Bracket, Riveting and Welding Parts, Sandblasting and Painting Parts

Our Industry Experience & Global Business Record

Main MarketsNorth America, Southeast Asia, Eastern Asia, Western Europe

Product Q&A

Q:What information is needed for a quote?
A:
Please provide detailed drawings (STEP, CAD, PROE, DXF, PDF), material requirements, surface treatment preferences, quantity, and any special demands like packing or delivery.
Q:What if I do not have drawings?
A:
You can send samples with dimensions (Thickness, Length, Height, Width) or CAD/3D files. Our engineers will create the necessary files.
Q:How can I track production without visiting?
A:
We provide a detailed production schedule and send weekly reports with photos or videos showing the manufacturing process.
Q:Can I place a trial order or sample order?
A:
Yes, we charge sample or mold cost first, which can be refunded when you place mass orders through negotiation.
Q:What are the lead times?
A:
Peak season lead time is 3-6 months, while off-season lead time is 1-3 months.

Send Inquiry

*To:Yantai Guocheng Metal Products Co., LtdYantai Guocheng Metal Products Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like