Powered by Made-in-China.com
Durable Transformer Substation Systems for Reliable Electrical Infrastructure
US$5,000.00
100-499 Pieces
US$4,700.00
500+ Pieces
Product profile
Customization
AvailableUsage
Flying Angle Tower, Crossing Tower, Tension Tower, Angle Tower, Terminal Tower, Transposition Tower, Branching TowerConductor Circuit
Double CircuitModel NO.
GC-d7Certification
ISO, CEMaterials
SteelStandard
StandardStyle
Independence TowerStructure
B TypeStrength Indicators
High Yield StrengthResilience Indicators
Anti-Brittle Breaking AbilityEnvironmental Resistance
High Temperature Resistance/Low TemperatureSurface Process
Hot DIP GalvanizingEnvironmental Certification
RoHS LEEDApplication Areas
Wide RangeWelding Standards
Aws D1.1Transport Package
by SeaSpecification
Can be customizedTrademark
GochainOrigin
ChinaHS Code
7308900000Production Capacity
50000Key features
High-Precision Cutting: Laser/plasma cutting ensures zero waste and improves efficiency by 30%.
International Welding Standards: Automated MIG/TIG welding meets international standards with firm, uniform welds.
Complex Customization: Supports customization of complex cross-sections and non-standard shapes.
Corrosion Resistance: Hot DIP Galvanizing and coatings extend service life in harsh environments.
High Strength Material: High yield strength and resilience, anti-brittle breaking ability.
One-Stop Service: Includes processing guidance, technical support, and after-sales guarantee.
Multi-Certification: ISO, CE, RoHS, LEED, and strict quality management certifications.
Advanced Equipment: Equipped with 6000W/12000W laser cutters and 300T CNC bending machines.
Company profile
Business Type: Manufacturer/FactoryExport Year: 2018-03-09Nearest Port: Yantai Port, Qingdao Port, rizhao PortAverage Response Time: ≤0.49hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, Others, FCA
About Our Factory & Business Background
AddressNo. 18, Binglun Road, Zhifu District, Yantai, Shandong, China
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsStructural Steel Fabrication, Pressure Vessels, Weldments Structure Steel, Idlers, Transmission Shaft, Roller, Bottom Skid, Bracket, Riveting and Welding Parts, Sandblasting and Painting Parts
Our Industry Experience & Global Business Record
Main MarketsNorth America, Southeast Asia, Eastern Asia, Western Europe
Product Q&A
Q:What information is needed for the quotation?
A:
Please provide comprehensive drawings (STEP, CAD, PROE, DXF, PDF), material specifications, surface treatment preferences, quantity, and any special requirements for packaging, labeling, or delivery.
Q:What should we do if there are no drawings?
A:
Send us a sample along with a sketch specifying thickness, length, height, and width. Our engineering team will create detailed CAD or 3D files for you.
Q:How do you ensure quality?
A:
Samples are pre-produced before mass production and must be finalized by the customer before shipment.
Q:What products can be customized from you?
A:
We customize sheet metal parts, steel structural parts, precision machining parts, and special metal parts.
Q:What is the average lead time?
A:
The average lead time is 3-6 months during peak season and 1-3 months during the off-season.
Send Inquiry
*To:
Yantai Guocheng Metal Products Co., Ltd
Yantai Guocheng Metal Products Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Durable Stainless Steel Structure for Electrical Transformer Substations
US$1,150.00-1,190.00
1 Ton(MOQ)
Compact Transformer Substation for Urban Energy Management Systems
US$4,700.00-5,000.00
100 Pieces(MOQ)
Reliable Transformer Substation Solutions for Industrial Power Needs
US$4,700.00-5,000.00
100 Pieces(MOQ)
Durable Galvanized Steel Substation Framework for Electrical Distribution
US$2,100.00-2,359.00
1 Piece(MOQ)
Durable Transformer Substation Solutions for Efficient Energy Management
US$4,700.00-5,000.00
100 Pieces(MOQ)
Grounding Grid and Steel Structural Support for Electrical Substation
US$850.00-1,100.00
10 Tons(MOQ)
Durable Steel Substation Framework for Efficient Power Transmission
US$2,328.00-2,585.00
1 Piece(MOQ)
Heavy-Duty Galvanized Steel Transformer Substation for Power Distribution
US$2,030.00-2,132.00
5 Tons(MOQ)
Compact Transformer Substation for Urban Power Distribution Networks
US$4,700.00-5,000.00
100 Pieces(MOQ)
Heavy Duty Galvanized Steel Gantry Frame for Electrical Substation
US$850.00-1,100.00
10 Tons(MOQ)
Substation Steel Equipment Platform with Durable Accessories
US$850.00-1,100.00
10 Tons(MOQ)
Megatro 400kv Transmission Overhead Line and Substation
US$940.00
1 Set(MOQ)
Perimeter Security Steel Fence for Power Substation and Utility Sites
US$850.00-1,100.00
10 Tons(MOQ)
Reliable Durable Pad Mounted Substation for 38kv Electrical Systems
US$5,000.00-9,600.00
1 Piece(MOQ)
Customizable Prefabricated Box Substation for Reliable Electrical Systems
US$60,000.00-100,000.00
1 Piece(MOQ)
Reliable Prefabricated Electrical Substation for 11kv and 15kv Systems
US$2,000.00-9,600.00
1 Piece(MOQ)
Durable 1250kVA Outdoor Transformer Substation for Reliable Power3.
US$50,000.00-100,000.00
1 Piece(MOQ)
Compact Electronic Transformer Substation for Reliable Power Distribution Systems
US$3,200.00-100,000.00
1 Piece(MOQ)
All-Weather High Performance Compact Substation for Solar Micro-Grid Power Systems Durable
US$1,000.00-5,000.00
1 Set(MOQ)
Electrical Power Substation for Reliable and Efficient Industrial Operations Today
US$3,200.00-100,000.00
1 Piece(MOQ)



















