SourcingAI
Try for free
Powered by Made-in-China.com
High-Performance Flexible Rubber Joints for Industrial Pipe Connections
US$50.00
1-999 Pieces
US$49.50
1,000+ Pieces
Sample price:US$45.00/piece.Request sample

Product profile

Customization

Available

Standard

ANSI, DIN, GB

Type

Welding Flange

Model NO.

GC-G9

Material

Stainless Steel

Structure

Flanges

Connection

Flanged

Sealing Surface

TG

Manufacturing Way

Forging

Applicable Media

Water, Steam, Air, Weak Acid/Alkaline Solution, Oi

Flange Sealing Surface Form

Flat Surface (FF), Convex Surface (RF), Ring Joint

Anti-Pull-off Design

Limiting Rod (Adjustable/Fixed), Anti-Pull-off Fla

Lining

Smooth Surface (Anti-Scaling), Guide Tube (Anti-Sc

Structure Type

Single Sphere, Double Sphere, Triple Sphere, Reduc

Flange Material

Carbon Steel Q235B, Stainless Steel 304/316L, Forg

Connection Type

Single Flange (Flange on One End + Welding on One

Transport Package

Standard Export Packaging

Specification

Can be customized

Trademark

GOCHAIN

Origin

China

HS Code

4016991000

Production Capacity

5000000

Key features

Extended Fatigue Life: Passed ISO 7326 standard test with >5 million displacement cycles, ensuring long-term durability.
Comprehensive Certifications: Complies with EU PED 2014/68/EU, ISO 9001, RoHS 2.0, and REACH standards for global market access.
Wide Media Compatibility: Suitable for water, steam, air, oils, and weak acids/alkalis with options for NR, CR, NBR, EPDM, or FKM materials.

Company profile

Yantai Guocheng Metal Products Co., Ltd
Importers and ExportersHigh Repeat Buyers ChoiceFast DeliveryFull Customization
Business Type: Manufacturer/FactoryExport Year: 2018-03-09Nearest Port: Yantai Port, Qingdao Port, rizhao PortAverage Response Time: ≤0.49hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, Others, FCA

About Our Factory & Business Background

AddressNo. 18, Binglun Road, Zhifu District, Yantai, Shandong, China
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsStructural Steel Fabrication, Pressure Vessels, Weldments Structure Steel, Idlers, Transmission Shaft, Roller, Bottom Skid, Bracket, Riveting and Welding Parts, Sandblasting and Painting Parts

Our Industry Experience & Global Business Record

Main MarketsNorth America, Southeast Asia, Eastern Asia, Western Europe

Product Q&A

Q:What materials are available for the rubber?
A:
Main rubber materials include NR, CR, NBR, EPDM, and FKM, selected based on the specific media (e.g., EPDM for hot water/steam, FKM for corrosive media).
Q:What certifications does the product have?
A:
The product complies with EU Pressure Equipment Directive (PED 2014/68/EU), ISO 9001 quality system, RoHS 2.0, and REACH standards.
Q:What is the typical lead time for production?
A:
The average lead time is 3-6 months during peak season and 1-3 months during the off-season.
Q:What flange standards are supported?
A:
We support GB/T 9119 (CN), ANSI B16.5 (US), EN 1092-1 (EU), and JIS B2220 (JP) standards for flange connections.
Q:What is the maximum nominal diameter available?
A:
The nominal diameter (DN) ranges from DN50 to DN3000, corresponding to NPS 2' to 120' in the inch system.

Send Inquiry

*To:Yantai Guocheng Metal Products Co., LtdYantai Guocheng Metal Products Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like