SourcingAI
Try for free
Powered by Made-in-China.com
OEM Custom Brass Bushing & Copper Plate Fabrication Per Drawings
US$1.00
1-99 Pieces
US$0.80
100+ Pieces
Sample price:US$5.00/piece.Request sample

Product profile

Customization

Available

Application

Hardware Tool, Machinery Accessory

Standard

GB, EN, China GB Code, TEMA, ASME

Surface Treatment

Electroplating

Production Type

Single Production

Machining Method

CNC Machining

Material

Steel, Alloy, Copper, Aluminum, Iron

Material 1

SPHC/45#/Brass/Aluminum/Stainless Steel/Copper

Quality Control

100% Inspection

Drawing Format

Pdf/Dwg/Igs/STP/etc.

Minimum Order Quantity

1 Item

Equipment

Machining Center

Transport Package

PP Bag/Carton or According Customers' Requirement

Specification

Customized

Trademark

GC

Origin

Shandong, China

HS Code

7307220000

Production Capacity

1000

Key features

Professional Custom Fabrication per Drawings: Strictly manufacture brass bushings and copper plates according to your 2D/3D drawings, ensuring perfect fit for your equipment.
Premium Copper Materials & Excellent Performance: Made of top-grade brass (H62/H65) and copper (T2), offering excellent electrical conductivity and corrosion resistance.
Precision CNC Machining & Strict Tolerance: Advanced CNC turning and milling ensure accurate dimensions up to +/-0.01mm for your critical applications.
Comprehensive Copper Parts Customization: From brass bushings and copper plates to complex non-standard copper components, all customized per your requirements.
0+ Years of Source Factory Experience: Backed by senior engineers, supporting small batch trials and mass production with stable delivery.

Company profile

Yantai Guocheng Metal Products Co., Ltd
Importers and ExportersHigh Repeat Buyers ChoiceFast DeliveryFull Customization
Business Type: Manufacturer/FactoryExport Year: 2018-03-09Nearest Port: Yantai Port, Qingdao Port, rizhao PortAverage Response Time: ≤0.62hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, Others, FCA

About Our Factory & Business Background

AddressNo. 18, Binglun Road, Zhifu District, Yantai, Shandong, China
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsStructural Steel Fabrication, Pressure Vessels, Weldments Structure Steel, Idlers, Transmission Shaft, Roller, Bottom Skid, Bracket, Riveting and Welding Parts, Sandblasting and Painting Parts

Our Industry Experience & Global Business Record

Main MarketsNorth America, Southeast Asia, Eastern Asia, Western Europe

Product Q&A

Q:What kinds of information do you need for a quote?
A:
Please provide detailed drawings in STEP, CAD, PROE, DXF, and PDF formats, material requirements (Aluminum, Steel, Iron, Copper, etc.), surface treatment preferences (anodizing, powder coating, etc.), quantity, and any special demands regarding packing, labels, or delivery.
Q:What shall we do if we do not have drawings?
A:
Please send your samples with drafts indicating thickness, length, height, and width. Our engineers will create precise CAD or 3D models based on these samples.
Q:Is it possible to know how your products are going on without visiting our company?
A:
Yes, we provide a detailed production schedule and send weekly reports with photos or videos to show the manufacturing process transparently.
Q:Can I have a trial order or samples only for several pieces?
A:
Yes, we allow trial orders or sample pieces. Sample or mold costs are charged initially but can be negotiated and refunded when you place mass orders.
Q:What is the lead time for mass production?
A:
Mass production lead time is typically 3-7 weeks after receiving the deposit.

Send Inquiry

*To:Yantai Guocheng Metal Products Co., LtdYantai Guocheng Metal Products Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Custom CNC Fabrication Service ISO Standard
Made-in-China.com