Powered by Made-in-China.com
Smart Transformer Substation Solutions for Optimal Energy Efficiency
US$5,000.00
100-499 Pieces
US$4,700.00
500+ Pieces
Product profile
Customization
AvailableUsage
Flying Angle Tower, Crossing Tower, Tension Tower, Angle Tower, Terminal Tower, Transposition Tower, Branching TowerConductor Circuit
Single CircuitModel NO.
GC-d9Certification
ISO, CEMaterials
SteelStandard
StandardStyle
Cable TowerStructure
M TypeStrength Indicators
High Yield StrengthResilience Indicators
Anti-Brittle Breaking AbilityEnvironmental Resistance
High Temperature Resistance/Low TemperatureSurface Process
Hot DIP GalvanizingEnvironmental Certification
RoHS LEEDApplication Areas
Wide RangeWelding Standards
Aws D1.1Transport Package
by SeaSpecification
Can be customizedTrademark
GochainOrigin
ChinaHS Code
7308900000Production Capacity
50000Key features
Zero Waste Cutting: High-precision laser/plasma cutting ensures zero material waste and boosts efficiency by 30%.
International Welding: Automated MIG/TIG welding meets international standards for uniform, firm, and high-strength joints.
Complex Customization: Supports customization of complex cross-sections and non-standard shapes for diverse engineering needs.
Corrosion Resistance: Hot DIP Galvanizing and corrosion-resistant coatings extend service life in harsh environments.
High Yield Strength: Materials feature high yield strength and anti-brittle breaking ability for robust structural integrity.
One-Stop Service: Comprehensive support from processing guidance to after-sales, reducing project costs and improving efficiency.
Multi-Certification: Certified ISO, CE, RoHS, LEED, and AWS D1.1 welding standards for quality assurance.
Advanced Equipment: Equipped with 12000W laser cutters and CNC machines for precise and large-scale processing.
Company profile
Business Type: Manufacturer/FactoryExport Year: 2018-03-09Nearest Port: Yantai Port, Qingdao Port, rizhao PortAverage Response Time: ≤0.49hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, Others, FCA
About Our Factory & Business Background
AddressNo. 18, Binglun Road, Zhifu District, Yantai, Shandong, China
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsStructural Steel Fabrication, Pressure Vessels, Weldments Structure Steel, Idlers, Transmission Shaft, Roller, Bottom Skid, Bracket, Riveting and Welding Parts, Sandblasting and Painting Parts
Our Industry Experience & Global Business Record
Main MarketsNorth America, Southeast Asia, Eastern Asia, Western Europe
Product Q&A
Q:What information is needed for the quotation?
A:
Please provide comprehensive drawings (STEP, CAD, PROE, DXF, PDF), material specifications, surface treatment preferences, quantity, and any special requirements for packaging, labeling, or delivery.
Q:What should we do if there are no drawings?
A:
Send us a sample along with a sketch specifying thickness, length, height, and width. Our engineering team will create detailed CAD or 3D files for you.
Q:How do we ensure quality?
A:
Samples are pre-produced before mass production and must be finalized and approved before shipment.
Q:What products can you customize?
A:
We can customize sheet metal parts, steel structural parts, precision machining parts, and special metal parts.
Q:What is the lead time for orders?
A:
The average lead time is 1-3 months during the off-season and 3-6 months during the peak season.
Send Inquiry
*To:
Yantai Guocheng Metal Products Co., Ltd
Yantai Guocheng Metal Products Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Durable Transformer Substation Solutions for Efficient Energy Management
US$4,700.00-5,000.00
100 Pieces(MOQ)
Reliable Transformer Substation Solutions for Industrial Power Needs
US$4,700.00-5,000.00
100 Pieces(MOQ)
Heavy-Duty Galvanized Steel Transformer Substation for Power Distribution
US$2,030.00-2,132.00
5 Tons(MOQ)
Compact Transformer Substation for Urban Energy Management Systems
US$4,700.00-5,000.00
100 Pieces(MOQ)
Versatile Transformer Substation for Urban and Rural Power Needs
US$4,700.00-5,000.00
100 Pieces(MOQ)
Durable Stainless Steel Structure for Electrical Transformer Substations
US$1,150.00-1,190.00
1 Ton(MOQ)
Heavy Duty Galvanized Steel Gantry Frame for Electrical Substation
US$850.00-1,100.00
10 Tons(MOQ)
Heavy-Duty Q235B and Q355b Steel Structures for Power Substations
US$1,150.00-1,190.00
1 Ton(MOQ)
Grounding Grid and Steel Structural Support for Electrical Substation
US$850.00-1,100.00
10 Tons(MOQ)
Durable Steel Substation Framework for Efficient Power Transmission
US$2,328.00-2,585.00
1 Piece(MOQ)
Cooling Equipment Support Steel Frame for Power Distribution Substation
US$850.00-1,100.00
10 Tons(MOQ)
Galvanized Structural Steelworks Substations for Electricity Transmission Line
US$850.00-1,100.00
10 Tons(MOQ)
Megatro 400kv Transmission Overhead Line and Substation
US$940.00
1 Set(MOQ)
High-Efficiency 3000kVA Pad Mounted Substation for Energy Solutions
US$5,000.00-9,600.00
1 Piece(MOQ)
High-Efficiency Low Loss Solar Substation for Optimal Energy Conversion
US$59,500.00
10 Pieces(MOQ)
Booster Integrated Smart Power Substation Prefabricated Cabin Step up Volatge Transformer for Photovoltaic Solar Energy
US$3,000.00-8,000.00
1 Piece(MOQ)
Yb Series Smart Transformer Substation for Efficient Energy Management
US$50,000.00-100,000.00
1 Piece(MOQ)
Reliable Box-Type Transformer Substation for Optimal Power Distribution Efficiency
US$3,200.00-100,000.00
1 Piece(MOQ)



















