Powered by Made-in-China.com
100 Tph Gold Recovery Equipment with Modular-Design for Processing-Highly-Viscous-Ores
US$38,800.00
1 Set
US$36,800.00
2-4 Sets
US$35,800.00
5+ Sets
Product profile
Customization
AvailableType
Gravity SeparatorVoltage
380VModel NO.
DMT-100Weight
12 TMaterial
Carbon SteelMaterial Feature
Heat ResistantCertification
ISO9001:2008, ISO9001:2000, CEEnergy Saving
Energy SavingWarranty
1 YearColor
Downunder4goldCustomized
Non-CustomizedCondition
NewAfter-sales Service
YesModel
Dmt-100Capacity
100 Tons Per Hour (Depending on Material Type andPower Requirement
60-100 Kw (Depending on Configuration)Water Requirement
200~400 Cubic Meter Hour(M³/H)Dimensions (L x W x H)
7500*3200*5000 mm (Approx.)Trommel Diameter
1.5 MetersTrommel Length
5.4 MetersScreen Mesh Size
Customizable (e.g., 10mm, 20mm, or 30mm)Rotation Speed
8-12 Rpm (Adjustable)Spray Bars
2-3 Bars with High-Pressure Nozzles for EfficientDrive System
Electric MotorSluice Box Length
6-12 MetersSluice Box Width
1.0 Meters or 2.0 MetersRiffle Design
Hungarian Riffles or Expanded Metal RifflesMatting
Rubber Matting or Miner's Moss or Dream Mat for GoTransport Package
Wood CaseSpecification
100 tons per hourTrademark
Downunder4goldOrigin
ChinaHS Code
8474100000Production Capacity
100 Sets / YearKey features
High Processing Capacity: Processes up to 100 tons of material per hour for large-scale mining operations.
Modular Design: Modular structure allows for easy assembly, disassembly, and transportation.
Customizable Screen Mesh: Screen mesh size is customizable (e.g., 10mm, 20mm, or 30mm) to fit specific needs.
Adjustable Rotation Speed: Trommel rotation speed is adjustable (8-12 RPM) for optimal material separation.
Water Recycling System: Includes optional water recycling systems to reduce consumption and environmental impact.
Durable Construction: Built with high-grade, wear-resistant steel to withstand harsh mining conditions.
Versatile Matting Options: Matting is customizable with rubber matting, miner's moss, or dream mat for gold trapping.
Lifetime Technical Support: Provides lifelong mechanical and technical support from installation to operation.
Company profile
Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableAverage Response Time: ≤2.18h
AI-Powered supplier vetting
SummaryThe supplier is identified as a professional technical supplier with in-house machinery, design, production, installation, and technical-service capabilities. It offers flexible, minor, full, design-based, and sample-based customization, plus 3D software design services. However, quality and service controls are weakly documented: only one quality inspector is reported, finished products are checked by packing staff, and there are no written procedures for service assessment, corrective actions, complaint handling, or quality assurance. Production capacity is indicated by one production line, while ongoing quantity reconciliation is not performed. The supplier has no export experience and offers no overseas services, although two export-experienced staff are reported. Financial records are referenced for 2022–2024, but their performance cannot be assessed from the provided information. No certifications or customer cases are explicitly documented.
Supplier typeThe supplier is explicitly described as a professional technical supplier. Its stated scope includes machinery and environmental-protection equipment sales and manufacturing, equipment installation, and technical services, while its company description indicates an in-house machinery factory integrating design, production, and supply.
After-Sales capabilityTechnical service and equipment installation services are within the stated business scope, and service quotations and payment terms are listed. However, the supplier has no written or recorded procedures for service assessment, corrective and preventive actions, or effective customer complaint handling, limiting evidence of structured after-sales capability.
R&D capabilityThe supplier provides 3D software design services and supports multiple customization modes, and it claims in-house design and fabrication resources. However, no SDK is available, so the evidence supports design capability but not SDK-based development or integration.
Customization capabilityThe supplier explicitly offers flexible, minor, full, design-based, and sample-based customization, supported by 3D software design services and an in-house design and fabrication team. These slices provide direct evidence of broad customization options.
Product Q&A
Q:Are you a factory?
A:
Yes, we are factory, 3200 square meter workshop and office.
Q:What is gold recovery rate of your equipment?
A:
All gravity recovery methods are highly dependent on particle size and shape. Besides operational variables, such as feed presentation (screen aperture, feed rate, solids/water ratio) and sluicebox design (i.e. length, width, slope, riffle pattern), the gold particle size distribution and shape are inherent factors determining the gold recovery rate. anyone say that equipment recovery is 80%, 90% something is not true. it's all depends. but 90% of placer mining gold wash plant will use sluice bo
Q:Gold trommel vs Gold shaker deck?
A:
While the capital equipment cost for trommel and shaker decks of equal diameter/width is similar,trommel screen plants come with the advantage of longer maintenance intervals and slightly lower operating costs for maintenance. The shaker deck design handles higher tonnage throughput and providesthe opportunity for running a primary sluice run in the screen under pan. Downunder4gold offers both trommel and shaker deck wash plants that can be configured to most ground conditions.
Q:What is difference of Downunder4gold equipment?
A:
we consider more than others how to ensure our plant will work well on mine site. we spend years on designing new model, we combine all the good thing others mining experience. we are compete with suppliers from Canada, USA, South Africa. Downunder4gold supply ratio from 5 tons per hour upto 500 tons per hour. we have hydraulic riffle sluice box, miner moss, rubber mat. gold trommel, gold scrubber trommel, shaker screen (deck). that can be configured to most ground conditions.
Q:What is delivery time?
A:
Most of our model will be in stock, after recieve deposit 10-15 days. if no stock, take 3-4 weeks for production.
Send Inquiry
*To:
Downunder (Shandong) Mining Technology Co., Ltd.
Downunder (Shandong) Mining Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
100~150 Tph Gold Wash Trommel Equipment with Clay-Breaking for River-Gold-Mining
US$42,000.00-45,000.00
1 Set(MOQ)
100~150 Tons/Hour Gold Trommel Equipment with Gold-Ore-Processing-Equipment for Placer-Mining
US$42,000.00-45,000.00
1 Set(MOQ)
100~150 Tph Gold Wash Trommel Equipment with Anti-Blocking Design for Alluvial-Deposit-Processing
US$42,000.00-45,000.00
1 Set(MOQ)
Large-Scale Gold Recovery Equipment with PLC-Automation for Placer-Gold
US$32,800.00-34,720.00
1 Set(MOQ)
Hot Sale Gold Gravity Equipment Modular Design for Rock Gold Processing
US$115,000.00
1 Set(MOQ)
Gold Equipment for Cil CIP Plant with Processing Engineering Design
US$50,000.00
1 Piece(MOQ)
High Output Gold Mining Equipment with Compact Design for Ease
US$3,900.00
1 Piece(MOQ)
Mineral Processing Land Gold Separator Equipment for Efficient Gold Extraction and Recovery
US$15,000.00-42,000.00
1 Piece(MOQ)
Flexible Land Mining Gold Equipment with Centrifuge Machine for High-Precision Gold Recovery
US$9,500.00-38,500.00
1 Piece(MOQ)
Precision Mining Equipment with Tungsten Carbide Tiles for Gold Recovery
US$3,000.00-5,000.00
1 Piece(MOQ)
Portable High Efficiency Recovery 100 Tons/Hour Gold Wash Trommel Equipment Automatic PU-Liner Gravity Separator for Fine Gold
US$15,000.00-16,000.00
1 Piece(MOQ)
5t Jm Recovery Rate: ≥95% for Diamond ≥0.5mm Magnetic Separator Equipment with ISO9001: 2008
US$5,978.00
1 Piece(MOQ)
Customized Alluvial Mining Equipment with Sluice Box for Enhancing Gold/Diamond Recovery
US$55,000.00
1 Piece(MOQ)
Merrill-Crowe Processing Gold Zinc Precipitation Equipment for Gold Recovery Production Line
US$135,000.00
1 Set(MOQ)
Alluvial Gold Washing Equipment with Belt Conveyor for Efficient Material Handling and Gold Recovery
US$15,000.00-42,000.00
1 Piece(MOQ)



















