Powered by Made-in-China.com
5 Tph Gold Shaker-Deck Wash Plant with Water-Recycling-System for Placer Mining
US$4,300.00
1-4 Sets
US$4,095.00
5-9 Sets
US$3,995.00
10-14 Sets
US$3,895.00
15+ Sets
Product profile
Customization
AvailableType
Gravity SeparatorVoltage
380VModel NO.
DMT-5Weight
<1TMaterial
Carbon SteelMaterial Feature
Fire ResistantCertification
ISO9001:2008, ISO9001:2000Energy Saving
Energy SavingWarranty
1Customized
Non-CustomizedCondition
NewMOQ
1 SetDelivery Time
7-20 DaysEfficiency
5-Ton-Per-HourFeature
Vibrating ScreenTransport Package
Wood CaseSpecification
2.6 cubic metersTrademark
Downunder4goldOrigin
ChinaHS Code
8474100000Production Capacity
1000 Sets / YearKey features
High Efficiency Recovery: Combines vibrating screen and sluice box for effective gold recovery with adjustable vibration frequency.
Compact and Portable Design: Lightweight 470kg unit designed for easy transport and mounting on trailers or skids.
Water Recycling Capability: Designed for low water usage with optional water recycling systems for remote operations.
Customizable Screen Mesh: Screen mesh size is customizable (e.g., 10mm, 20mm, or 30mm) for optimal material handling.
Robust Durability: Constructed from high-grade wear-resistant steel to withstand harsh mining conditions.
Adjustable Sluice Angle: Sluice angle is adjustable for optimal gold recovery and material flow.
Energy Saving Operation: Optimized power requirement of 3-5 kw ensures energy-efficient processing.
Comprehensive Accessories: Supplies all necessary accessories including pumps, hoses, and generators for complete setup.
Company profile
Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableAverage Response Time: ≤1.61h
AI-Powered supplier vetting
SummaryThe supplier is identified as a professional technical supplier with in-house machinery, design, production, installation, and technical-service capabilities. It offers flexible, minor, full, design-based, and sample-based customization, plus 3D software design services. However, quality and service controls are weakly documented: only one quality inspector is reported, finished products are checked by packing staff, and there are no written procedures for service assessment, corrective actions, complaint handling, or quality assurance. Production capacity is indicated by one production line, while ongoing quantity reconciliation is not performed. The supplier has no export experience and offers no overseas services, although two export-experienced staff are reported. Financial records are referenced for 2022–2024, but their performance cannot be assessed from the provided information. No certifications or customer cases are explicitly documented.
Supplier typeThe supplier is explicitly described as a professional technical supplier. Its stated scope includes machinery and environmental-protection equipment sales and manufacturing, equipment installation, and technical services, while its company description indicates an in-house machinery factory integrating design, production, and supply.
After-Sales capabilityTechnical service and equipment installation services are within the stated business scope, and service quotations and payment terms are listed. However, the supplier has no written or recorded procedures for service assessment, corrective and preventive actions, or effective customer complaint handling, limiting evidence of structured after-sales capability.
R&D capabilityThe supplier provides 3D software design services and supports multiple customization modes, and it claims in-house design and fabrication resources. However, no SDK is available, so the evidence supports design capability but not SDK-based development or integration.
Customization capabilityThe supplier explicitly offers flexible, minor, full, design-based, and sample-based customization, supported by 3D software design services and an in-house design and fabrication team. These slices provide direct evidence of broad customization options.
Product Q&A
Q:Are you a factory?
A:
Yes, we are factory, 3200 square meter workshop and office.
Q:What is gold recovery rate of your equipment?
A:
All gravity recovery methods are highly dependent on particle size and shape. Besides operational variables, such as feed presentation (screen aperture, feed rate, solids/water ratio) and sluicebox design (i.e. length, width, slope, riffle pattern), the gold particle size distribution and shape are inherent factors determining the gold recovery rate. anyone say that equipment recovery is 80%, 90% something is not true. it's all depends. but 90% of placer mining gold wash plant will use sluice bo
Q:Gold trommel vs Gold shaker deck?
A:
While the capital equipment cost for trommel and shaker decks of equal diameter/width is similar,trommel screen plants come with the advantage of longer maintenance intervals and slightly lower operating costs for maintenance. The shaker deck design handles higher tonnage throughput and providesthe opportunity for running a primary sluice run in the screen under pan. Downunder4gold offers both trommel and shaker deck wash plants that can be configured to most ground conditions.
Q:What is difference of Downunder4gold equipment?
A:
we consider more than others how to ensure our plant will work well on mine site. we spend years on designing new model, we combine all the good thing others mining experience. we are compete with suppliers from Canada, USA, South Africa. Downunder4gold supply ratio from 5 tons per hour upto 500 tons per hour. we have hydraulic riffle sluice box, miner moss, rubber mat. gold trommel, gold scrubber trommel, shaker screen (deck). that can be configured to most ground conditions.
Q:What is delivery time?
A:
Most of our model will be in stock, after recieve deposit 10-15 days. if no stock, take 3-4 weeks for production.
Send Inquiry
*To:
Downunder (Shandong) Mining Technology Co., Ltd.
Downunder (Shandong) Mining Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Higher-Output Portable-Gold-Shaker-Deck-Screen 5 Tons/Hour Gold Wash Plant Sluice-Box with Material-Washing for River-Gold-Mining
US$10,000.00-100,000.00
1 Piece(MOQ)
100 Tph Mobile Gold Wash Plant with Heavy-Mineral-Concentration for Desert-Gold-Mining
US$35,800.00-38,800.00
1 Set(MOQ)
Trommel Gold Wash Plant with Knelson Concentrator
US$5,000.00
1 Set(MOQ)
5 Tph Hard Rock Gold Gravity Processing Plant with Main Machine Stock
US$115,000.00
1 Set(MOQ)
Gold Mining Equipment Mobile Gold Wash Plant with Sluice Box and Water Pump for Alluvial Gold Deposit
US$7,000.00-7,750.00
1 Piece(MOQ)
50- 100-200thp Portable Gold Diamond Tromme Screen Gold Wash Plant with High Quality
US$35,000.00
1 Set(MOQ)
Diesel Powered Three in One Small Gold Wash Plant with Water Pump
US$12,000.00
1 Set(MOQ)
Made in China Land Mining Gold Wash Plant with Water Pump
US$5,000.00-500,000.00
1 Set(MOQ)
Small Scale Rock Gold Processing Plants with Ball Mill for 5-10tph
US$15,000.00
1 Piece(MOQ)
Mobile 200-300 Tph Trommel Screen Gold Wash Plant Small Trommel Drum Screen
US$3,000.00-22,000.00
1 Set(MOQ)
Mobile Gold Trommel Wash Plant with Sluice Box for Sale
US$3,000.00-22,000.00
1 Set(MOQ)
Fixed Sled Type Alluvial Clay Gold Wash Plant with High Pressure Water Spray
US$36,000.00
1 Piece(MOQ)
Complete Washing & Recovery System, up to 100+ Tph Large Capacity Alluvial Gold Wash Plant
US$10,000.00-50,000.00
1 Piece(MOQ)
300 Tph River Alluvial Gold Wash Plant with Agiatation Chute Machinery
US$5,000.00-170,000.00
1 Piece(MOQ)
Gold Trommel Wash Plant with Sluice Box Recovery System
US$5,000.00-30,000.00
1 Piece(MOQ)
Advanced Alluvial Gold Washing Plant with Enhanced Trommel Screening System
US$45,000.00-95,000.00
1 Piece(MOQ)



















